A horizontal curve is being designed for a new two-lane highway(12-ft lanes). The PI is at station 250 + 50, the design speed is 65 mi/h, and a maximum superelevation of 0.07 ft/ft is to be used. If the central angle of the curve is 38 degrees, design a curve for the highway by computing the radius and stationing of the PC and PT.
Testing has already been completed on the water and the Usage Rate for the carbon is 0.4 pounds of carbon per 1000 gallons of water treated. The required EBCT is 20 minutes and the carbon longevity must be at least 6 months.
What is your recommendation for the maximum size of coarse aggregate for the following situation? A continuously reinforced concrete pavement cross section contains a layer of No. 6 reinforced bars at 15.24 cm centers,
A section view of a dam shown and water is stored at an elevation of 6 m above the base. the water flows through the dam in a concreate opening 2m high and 3 m wide. there are no losses or friction.
A NCSU student turned on his/her 150 W fan inside his/her room, 4m * 6m * 6m, before going to class in the morning of a summer day, excepting to find his/her room cooler when he/she returns at night.
A soil specimen has a water content of 18% and a wet until weight of 118.5 lb/ft. The specific gravity of solids is found to be 2.72. Find the dry unit weight, void ratio, and degree of saturation.
If the time required to pay for parking is exponentially distributed with a mean of 15 seconds, find the average time in system.
To remove a nail, a small block of wood is placed under a crowbar, and a horizontal force P is applied as shown. Knowing that the maximum vertical force needed to extract the nail is 2600 N and that the horizontal force P is not to exceed 290 N, d..
The temperature in the stack is 350 degrees F and the pressure is 725 mm Hg. If the total flow rate of gas out of the stack is 200 standard cubic meters per second, calculate the total mass emissions of particulates out of the stack in kg/day.
Create a precedence (activity-on-node) diagram based off the attached activity list. You must follow the below recommendations as we discussed in class. 1) draw nodes as rectangles. It helps define the left side as starting and the right side as en..
An open clean glass tube, having a diameter of 3 mm is inserted vertically into a dish of mercury at 20c .How far will the column of mercury (S.G =13.6) in the tube be depressed in (mm) given the following information. Theta = 130 and surface tens..
If the detention storage on the paved section is increasing at the rate of 60 m3/hr, what is the runoff rate into the inlet grate?
The frame is designed to carry the hanging mass at G equal to 167 kg. The frame is supported by a pin connection at C and the rope AB, and constructed with pin connections at points E, F, and D. Importantly, members BEFG and EDC are continuous mem..
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd