Design a circuit to give uninterrupted 5 v dc power supply

Assignment Help Electrical Engineering
Reference no: EM13230141

Design a circuit to give uninterrupted 5 V dc power supply with 110 V 60 Hz line voltage as input. The dc output should be available in case of power outage (110 V line supply). In case of line failure, the circuit should switch to backup source that should be designed using a solar panel.

Reference no: EM13230141

Questions Cloud

What is the potential drop between the two electrodes : Two metal plates with an area of 4 cm2 and separation distance of 0.01 cm are used to form a capacitance transducer. If the material between the two plates has a dielectric constant of 2.5 and the dielectric constant of free space is 8.85 pF/m
What are the long and short term financial consequences : What are the long and short term financial consequences of improving productivity in a business.
Describe some of the key decisions its management : Describe some of the key decisions its management has faced within the past year or two. Identify an ethical issue the organization either faces or has faced in the past. If it has not been resolved, provide an analysis of how the issue should b..
Discuss how to use the different data stream classes : A stream can represent many different kinds of sources and destinations, including disk files, devices, other programs, and memory arrays. Discuss how to use the different data stream classes to move data to/from files.
Design a circuit to give uninterrupted 5 v dc power supply : Design a circuit to give uninterrupted 5 V dc power supply with 110 V 60 Hz line voltage as input. The dc output should be available in case of power outage (110 V line supply). In case of line failure, the circuit should switch to backup source t..
Describe the importance of using sub queries in a database : 1. Extracting and interpreting data can be very valuable to an organization. Describe the importance of using sub queries in a database system. Provide at least two business case scenarios to support your response.
Compute the multifactor productivity under each system : Compute the multifactor productivity under each system. Use carts per dollar cost (labor plus equipment) as the measure. (Round your answers to 2 decimal places.
Determine the steady-state error to a ramp input : Determine the relationship between the steady-state error to a ramp input and the gain K and system parameter b. For what values of K and b can we guarantee that the magnitude of the steady-state error to a ramp input
A relational database model : A relational Database Model allows database users to analyze data thoroughly.

Reviews

Write a Review

Electrical Engineering Questions & Answers

  Calculate the open-circuit secondary voltage

A single-phase 50-KVA, 2400/240-volt, 60-Hz distribution transformer has a 1-ohm equivalent leakage reactance and a 5000-ohm magnetizing reactance referred to the high-voltage side. If rated voltage is applied to the high-voltage winding

  Which of the following statements is correct

Technician B says that the resistance of a copper wire decreases as its length increases. Which of the following statements is correct?

  Find the complex voltage gain of the amplifier

input voltage to an amplifier is: Vi(t)=0.1*cons(2000*pi*t+30) and the output voltage is: Vo(t)=10*sin(2000*pi*t+15) Find the complex voltage gain of the amplifier at f = 1kHz and express the magnitude of the gain in decibels.

  Evaluate laplace transforms

Analyse and Model Engineering Situations and Solve Engineering Problems using Laplace Transform

  Explain vary as square root-application

Vary as square root-application, The frequency f of vibration of a wire varies directly as the square root of the tension T of the wire

  What is the approximate slant-range resolution

A pulse compression radar transmits rectangular chirp pulses with bandwidths of 500 MHz. What is the approximate slant-range resolution after Dolph-Chebyshev frequency weighting that results in 30-dB sidelobes

  List the content of all the memory locations in the prom

Implement a high-speed multiplier which will multiply two 2-bit binary numbers (B1B0 and C1C0) using a 16X4 PROM (lookup table implementation). List the content of all the memory locations in the PROM and describe the operation.

  Determine the compensator pole of utility feedback system

A unity feedback control systems for a robot submarine has a plant with a third-order transfer function G(s) = K / (s(s + 10)(s +50)) We want the overshoot to be approximately 7.5% for a step input

  What is the input voltage and output voltage

A transformer is used to match an 8 ohm speaker to a 500ohm audio line. What is the turns ratio of the transformer what is the input voltage and output voltage when 15W is being delivered to the speaker

  Is there any advantage or disadvantage of star connection

Is there any advantage of star connection over delta w.r.t. induction motors? Also, is there any advantage or disadvantage of star connection over delta w.r.t. distribution and transmission of power? Please explain the reasons for all the advantag..

  What is an open collector input why is it used on sensors

Draw a strain gauge circuit and its external components to attach to a conveyor mounted only at the ends to measure the load at the center of the conveyor. What type of testing would you need to do to establish a baseline and calibration curve for..

  Solar energy for farms in middle east

Determine the energy uses on farms in middle east and determine whether or not it is better to use a stand alone system or a grid connected system for the application on farms.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd