Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
1.A long wide rectangular channel carries a steady flow rate of 35 m2s-1 (flow per unit width) and passes through an abrupt change in slope from 0.005 (upstream of the change) to 0.003 (downstream). Manning’s n for the channel is 0.013. Is there a hydraulic jump in the channel and if so where? Describe the water surface profiles at the various parts of the channel.
2.Water enters a very wide rectangular channel (Manning’s n = 0.0149) at a velocity of 12.2 ms-1 and a depth of 0.61 m. An H3 curve forms downstream and the water jumps to a depth of 2.4 m some distance downstream. Find the distance downstream to the location of the hydraulic jump
the 50-lb block rests on the rough surface for which the coefficient of kinetic friction is 0.2. a forcenbspf 40 s2
A reservoir cover is 12,000 acres and is 20 feet thick. The formation has initial porosity of 0.25. The pore volume compressibility of the reservoir rock is 3.0 x 10^(-6) psi^(-1) .
A wire is kept at ambient temperature while it is stretched by 200 mm by a force which rises from zero to 1.5 kN, the extension of the wire being directly proportional to the force applied. What is the work done by the wire
The motion of a box on a spiral conveyor is defined by the following position vector: r = 0.5sin(2t) i + 0.5cos(2t) j - 0.2t k where r is in meters and t is in seconds. Find the location, velocity, and acceleration when t = 0.8 s.
The exterior and interior walls are of concrete block. The roof is constructed of bar joists covered with a steel roof deck, rigid insulation, and built-up roofing.
A stabilization pond is designed for a 35-day detention time. If the pond is maintained at a capacity of 40 acre-feet, what is theaverage gpd flow to the stabilizaiton pond?
If you hace 80' of flexible hose that is 1.75" ID and a pump that is a 4" and moves fluid at 100gpm, how many gpm would the fluid conimg into the 1.75" flexible hose?
The water velocity is estimated to be 3.0 m/sec. Acetone has a density of 0.786 gm/mL and a half-life in water of 20.0 hr. Determine the concentration of acetone in the river due to this pulse release at distance of 2, 4, and 7 km from the site at..
The bund channel is to be formed by the embankment only. The horizontal distance between two bund s is 50 m. The 1-hr rainfall expected during the recurrence interval of 10 yrs is 8 cm/hr.
How do you determine the cross-sectional area of the concrete and steel and the stresses in each if the column deforms .01 inch while carrying 100 K load? The cross sectional area is 15 inch and column height is 10 feet.
The proposed highway has two tangents of bearings N 45Degrees 54' 36" E and N 1 Degree 22' 30" W. The highway design engineer, attempting to obtain the best fit for the simple circular curve join these tangents, decides that the external is to be ..
Calculate the pressure at the clay-sand interface for two cases:1) clay on top of the sand and 2) clay on the bottom of thevertical sand column.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd