Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Describe the use of productivity models for estimating land productivity. Provide details about various attributes that can be used and how the model is developed . Examples can be used to demonstrate model workability.
Should Bernard bid for the project assignment? Why or why not? Does Bernard have an unfair advantage over firms having designed the project on which he wants to bid?
A four-lane freeway (two lanes in each direction) is on mountainous terrain with 11ft lanes, a 5ft right-side shoulder, interchange spacing of one every 10 miles, and a 60mph base free-flow speed.
Use the bisection method to find the root of the equation f(x) = x 2 - 4sin(x) = 0. For initial bracketing interval [a,b] , take a=1 and b = 3.
Find out the number of turns in each spring, if the diameter of the spring wire 14 mm and the diameter of coil is 80 mm. Assume C=84 GN/mmxmm.
Lift Charts in direct marketing, The mass-mailing business is often used to illustrate the use of lift charts. Another real world application where the lift charts can be used
Three-ply asphalt felt and gravel roof over 2in of insulation board is supported by 18in deep precast reinforced concrete beams with 3ft wide flanges. If insulation weights 3lb/ft 2 and the asphalt roofing weights 5.5lb/ft2, determine the total dea..
The plate is submerged in a liquid is a vertical position with the parallel sides horizontal and the shorter parallel side at the top and exactly in the surface of the liquid.
Calculate the depreciation using straight-line, double-declining-balance (DBB), and MACRS (current IRS regulation) methods; and tabulate the depreciation schedule.
What are the quantitative measures of reliability (discuss measures for hardware, software, personnel, facilities, and data)?
If the time required to pay for parking is exponentially distributed with a mean of 15 seconds, find the average time in system.
A 1-kg block of dry ice(solid CO2) becomes a gas at room temperature. calculate the volume of gas produced at 25 degrees celsius and 975 kPa.
An embankment for a highway 30m wide & 1.5m in a compacted thickness is to be constructed from a sandy trucked from a borrow pit. the water contenet of the sandy soil in the borrow pit is 15%& its void ratio is 0.69.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd