Describe the scope and analyze how to control the scope

Assignment Help Basic Computer Science
Reference no: EM13499374

Question :This assignment consists of two (2) sections: a business requirements document and a Gantt chart or project plan. You must submit both sections as separate files for the completion of this assignment. Label each file name according to the section of the assignment for which it is written. Additionally, you may create and / or assume all necessary assumptions needed for the completion of this assignment.

Procuring quality business requirements is an important step toward the design of quality information systems. Completion of a quality requirements document allows user needs and expectations to be captured so that infrastructure and information systems can be designed properly. Using the requirements document provided in the course shell, you are to speculate on the needs of the company. You must consider current and future requirements; however, assumptions should be realistic and carefully considered.

Section 1: Business Requirements Document

1. Write an eight to ten (8-10) page original business requirements document for the project plan using the template provided. Note: The template can be found in the Student Center of the online course shell.

a. Describe the project including the following:

i. Describe the scope and analyze how to control the scope.

ii. Identify possible risks, constraints, and assumptions.

iii. Describe the integration with other systems and infrastructure. Note: Database and interface design, security, and networking should be considered.

iv. Define relevant terms that will be used throughout project.

b. Use at least two (2) quality resources in this assignment. Note: Wikipedia and similar Websites do not qualify as quality resources.

Your assignment must follow these formatting requirements:

Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions.
Include a cover page containing the title of the assignment, the student's name, the professor's name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length.

Section 2: Revised Gantt Chart / Project Plan

Use Microsoft Project or an open source alternative, such as Open Project, to:

2. Update the Gantt chart or project plan (summary and detail) template, from Project Deliverable 1: Project Plan Inception, with all the project tasks.

Reference no: EM13499374

Questions Cloud

Find the thermal efficiency of the engine and work performed : given heat 1000 j is input to a carnot engine at 300 degrees celsius and waste heat rejected at 10 degrees C. find the thermal efficiency of the engine and the work performed
What is the npv of the new product line including any tax : You are a consultant who was hired to evaluate a new product line for Markum Enterprises. The upfront investment required to launch the product line is $10 million. The product will generate free cash flow of $750,000 the first year, and this free ca..
The market opportunity of a distance learning company : Assume you are analyzing the market opportunity of a distance learning company,
Persuasive communication : Persuasive Communication
Describe the scope and analyze how to control the scope : Describe the project including the describe the scope and analyze how to control the scope and identify possible risks, constraints, and assumptions.
Locate or develop a team diagnostic survey : Locate or develop a team diagnostic survey. Upload the survey. How does it reflect the common team problems discussed in this chapter? What additional questions would you ask on such a survey?
Developed in the two previous stakeholder assignments : According for the last 2 question, could you please build motivation map
How much work is required to bring the car to rest : A 1100 kg car is moving at a speed of 40.0 m/s. How much work is required to bring the car to rest
Why do different acquirers arrive at different valuations : 1. When calculating the value of a target for acquisition, why do different acquirers arrive at different valuations for the target?

Reviews

Write a Review

Basic Computer Science Questions & Answers

  Write a program that creates a binary tree

Write a program that creates a Binary Tree from an array of integers, goes through it using inorder traversal (saving that to another array), then makes another balanced binary tree.

  How many times will the job be interrupted

how many times will the job be interrupted and on which queue will it finish its execution?

  Explain main resources in management information systems

The three main resources in management information systems (MIS) are information, information technology, and people. Which of these three resources is the most significant?

  Which service to select to achieve operational excellence

Consider not only costs but also such issues as delivery speed, pickup schedules, drop-off locations, tracking ability, and ease of use of the website. Which service did you select? Explain why.

  Why method external object able modify attributes of object

n a method that accepts an object as an argument, writing code that accidentally modifies the object. When a reference variable is passed as an argument to a method, the method has access to the object that the variable references.

  How long will it take for input size

How long will it take for input size 500 if the running time is the following

  Distinguish object frameworks-components-system installation

Distinguish object frameworks and components in terms of ease of modification before system installation, ease of alteration after system installation, and overall cost savings from code reuse.

  Write a mips program where we store 5 integers in the array

Write a mips program where we store 5 integers in the array. For example.

  Tools or techniques to use as a project manager

Identify at least three ideas, tools, or techniques that you have learned from this course and plan to use as a project manager. What will be most helpful to you?

  Each of the conditional jump statements causes a jump to des

Assume for each part of this problem that the EAX register contains 00 00 00 4F and the doubleword referenced by value contains FF FF FF 38.

  What is virtual memory

What is virtual memory and how is it related to the swap partition in Unix?

  The disregard for ethics in an organization.

There have been a number of headline examples recently that have discussed the disregard for ethics in an organization.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd