Reference no: EM13963028
Business Sustainability Assessment Worksheet: California R&D
Use this worksheet to conduct a sustainability audit of Riordan Manufacturing, a virtual plastic injection molding company. Fill in all necessary information. Production stages that do not occur at this plant are marked as N/A.
Section 1: General Information
Company: Riordan Manufacturing, San Jose, California
Products: Assorted plastic products and testing new product designs and production
Section 2: Production
For each production stage, list input materials such as raw materials or output from previous stages, and output materials such as products, byproducts, wastes, or pollutants. Describe the process used at each stage and identify the least sustainable practices.
Production Stage 1: Receiving
|
Input Materials
|
![2475_1.png](https://secure.expertsmind.com/CMSImages/2475_1.png)
|
Output Materials
|
|
|
Briefly describe the receiving process:
|
Briefly describe any nonsustainable aspects of this production stage:
|
Production Stage 2: Mixing
|
Input Materials
|
![1630_2.png](https://secure.expertsmind.com/CMSImages/1630_2.png)
|
Output Materials
|
N/A
|
N/A
|
Briefly describe the mixing process:
N/A
|
Briefly describe any nonsustainable aspects of this production stage:
N/A
|
Production Stage 3: Molding
|
Input Materials
|
![2280_3.png](https://secure.expertsmind.com/CMSImages/2280_3.png)
|
Output Materials
|
|
|
Briefly describe the molding process:
|
Briefly describe any nonsustainable aspects of this production stage:
|
Production Stage 4: Trimming
|
Input Materials
|
![1546_4.png](https://secure.expertsmind.com/CMSImages/1546_4.png)
|
Output Materials
|
N/A
|
N/A
|
Briefly describe the trimming process:
N/A
|
Briefly describe any nonsustainable aspects of this production stage:
N/A
|
Production Stage 5: Labeling
|
Input Materials
|
![21_5.png](https://secure.expertsmind.com/CMSImages/21_5.png)
|
Output Materials
|
N/A
|
N/A
|
Briefly describe the labeling process:
N/A
|
Briefly describe any nonsustainable aspects of this production stage:
N/A
|
Production Stage 6: Assembly
|
Input Materials
|
![1763_6.png](https://secure.expertsmind.com/CMSImages/1763_6.png)
|
Output Materials
|
N/A
|
N/A
|
Briefly describe the assembly process:
N/A
|
Briefly describe any nonsustainable aspects of this production stage:
N/A
|
Production Stage 7: Packaging
|
Input Materials
|
![2462_7.png](https://secure.expertsmind.com/CMSImages/2462_7.png)
|
Output Materials
|
N/A
|
N/A
|
Briefly describe the packaging process:
N/A
|
Briefly describe any nonsustainable aspects of this production stage:
N/A
|
Production Stage 8: Shipping
|
Input Materials
|
![1281_8.png](https://secure.expertsmind.com/CMSImages/1281_8.png)
|
Output Materials
|
N/A
|
N/A
|
Briefly describe the shipping process:
N/A
|
Briefly describe any nonsustainable aspects of this production stage:
N/A
|
Section 3: Legal and Other Requirements
State and federal regulations that Riordan Manufacturing must adhere to include the following:
Hazardous waste generator requirements found in Title 40 of the U.S. Code of Federal Regulations, Parts 260, 261 and 262, or their state equivalent
This program requires any company that generates over 2,200 pounds, or 1,000 kilograms of hazardous waste per month to identify all hazardous wastes they generate.Get a company's specific identification number, follow specific container management and labeling requirements, ship hazardous waste off-site to a qualified treatment facility, and accompany all shipments with a manifest.
Air pollution permit requirements pursuant to the regulations established by the Federal Clean Air Act. or its state equivalent
The company must determine how much air emissions, such as particulates, volatile organic compounds,andhazardous air permits, they emit and secure a construction and operating permit that limits how much maybe emitted to the air.
Storm water permit pursuant to the National Pollutant Discharge Elimination System, or the state or local equivalent
Any company that allows storm water to flow from property in contact with certain types of industrial wastes and goes to a ditch, sewer, river, or stream must secure a permit that controls how manypollutants maybe discharged.
Section 4: Environmental Aspects and Impacts
Select the three least sustainable practices identified in Section 2. Specify what the practice, activity, product, or service is, what aspect of the environment is affected, and what the environmental impact is.
Practice, Activity, Product, or Service
|
Environmental Aspect
|
Environmental Impact
|
|
|
|
|
|
|
|
|
|
Section 5: Objectives, Targets, and Programs
In the Week Four Learning Team assignment, your team develops a sustainable plan to improve each of the least sustainable practices identified in Section 4. Briefly describe the objectives and targets of the improvement plan, what type of program is necessary to meet each objective, and the person or people who would be responsible for implementing and overseeing it.
Objective
|
Target
|
Program
|
Responsible Party
|
|
|
|
|
|
|
|
|
|
|
|
|
What is the total travel time of the pulse as measured
: A light pulse emitted by the rocket travels toward the mirror and is reflected back to the rocket. The front of the rocket is a distance 1.88 10 ^12 m from the mirror (as measured by observers in S) at the moment the light pulse leaves the rocket...
|
Prepare a perpetual inventory record using fifo inventory
: Prepare a perpetual inventory record, using the FIFO inventory costing method, and determine the company's cost of goods sold, ending merchandise inventory, and gross profit.
|
Production requirement at minimum machine cost
: If it costs $50 per hour to operate A and $30 per hour to operate B, determine how many hours per week to operate each machine to meet the production requirement at minimum machine cost.
|
Calculate the capacitance of the coaxial cable arrangement.
: The electric field outside a uniformly charged, infinite cylindrical conductor is the same as if the cylinder's charge were concentrated in a thin wire along the cylinders axis. Moreover, the potential inside a uniformly charged infinite cylindric..
|
Describe the process used at each stage
: For each production stage, list input materials such as raw materials or output from previous stages, and output materials such as products, byproducts, wastes, or pollutants. Describe the process used at each stage and identify the least sustaina..
|
Find the change in the y direction of the proton.
: A proton enters a region where the electric field has a magnitude of 500 N/C and is produced by two charged plates. The length of the plates is .200M. The initial velocity is 3X10^6 m/s in the postive x direction.
|
Arrange things so that the plates can be separated
: Imagine that you would like to design a parallel plate capacitor that could store 1 J of electrical energy in the electric field between its plates when connected to a 1.5 V battery
|
What is electron speed just before electron strikes screen
: In a television picture tube, electrons strike the screen after being accelerated from rest through a potential difference of 25000 V. The speeds of the electrons are quite large, and for accurate calculations of the speeds, the effects of special..
|
Objective function and the inequations of system
: Establish the objective function and the inequations of this system. Use x1; x2; x3 instead of P1; P2; P3. Create the system of equations and out of it a table for usage of the Simplex Method (just the table no evaluation!)
|