Case ; Life and Death of an Aircraft Development Project

Law and Callon31 described the history of a large British aerospace project in terms of two entities: the global system and the project itself. The global system comprised parties and organizations out- side the project that had a stake in the project; theproject comprised everything within the project, including all work and the organizations con- tracted to do it.

THE GLOBAL SYSTEM

The principal stakeholders in the global system were:

The Royal Air Force (RAF), which initiated the project with a request for a new supersonic air- craft with short take-off capability. The aircraft would be a “tactical strike and reconnaissance fighter” called TSR.

The Ministry of Defence (MOD), which wanted an aircraft that would best fit the nation’s cur- rent overall defense needs.

The Treasury, which wanted an inexpensive aircraft that would have market appeal for sale outside the UK, such as to the Royal Aus- tralian Air Force (RAAF).

The Royal Navy (RN), which wanted to buy a different aircraft but was under pressure by MOD to buy the TSR.

The Ministry of Supply (MOS), which wanted an aircraft that would be produced by a con- sortium of several UK airframe and engine manufacturers.

As is typical of most projects, each stakeholder in the global system conceptualized the project differently: to the RAF and MOD it would yield an aircraft for a specific mission; to the Trea- sury it would fit the defense budget and gener- ate revenue; to the RN it was a competitive threat to the aircraft they really wanted; and to the MOS it was an instrument of industrial policy. The parties had different reasons for contribut- ing resources and support: some were economic (in return for funds, an aircraft would be built); some political (in return for a demonstrated need, objections of the RN would be overruled); some technical (in return for engineering and technical effort, the aircraft would meet RAF performance requirements); and some industrial (in exchange for contracts, the aircraft industry would be con- solidated).

THE PROJECT

The Treasury would not approve project fund- ing until the aircraft’s basic design, manufacturer, cost, and delivery date were defined. The RAF and MOD sent requests to the aircraft industry for design ideas, and selected two manufacturers: Vickers Corp. and English Electric (EE). They favored Vickers for its integration capability (com- bining aircraft, engine, armaments, and support equipment into a single weapons package), but they also liked EE for its design experience with supersonic aircraft. So they decided to contract with both companies and adopt a design that would utilize features from both. The idea was approved by all other parties in the global system, and funding for the project was released.

The project grew as Vickers and EE hired sub- contractors and expanded their teams for design, production, and management. The two companies and several other contractors merged to form a single new organization called the British Aircraft Corporation (BAC).

RELATIONSHIPS BETWEEN THE GLOBAL SYSTEM AND THE PROJECT

As the project grew, so did the problems between it and the global system. The MOS wanted central- ized control over all aspects of the project, and all transactions between the project and stakeholders in the global system. Although BAC was the prime contractor and ostensibly responsible for manag- ing the project, the MOS would not confer upon it the necessary management authority. Rather, the MOS formed a series of committees with members from the global system and gave them primary responsibility to manage the project. This led to serious problems:

The committees were allowed to make or veto important project-related decisions. They, not BAC, awarded important contracts; when the RAF wanted to change its requirements, it consulted with the committees, not with BAC.

The committees often lacked sufficient infor- mation or knowledge. Technical committees made decisions without regard to costs; cost committees made decisions without regard to technical realities. Decisions focused on par- ticular aspects of the project; seldom did they account for impacts on other parts of the proj- ect, or the project as a whole.

Distrust grew between BAC and the MOS; nei-

ther was able to effectively integrate the resources, information, and decisions flowing between par- ties in the project and the global system. Subcon- tractors became difficult to control. Many ignored

BAC and worked only with the MOS and RAF to get favorable treatment.

GLOBAL SYSTEM RESHAPED

Everyone knew the project was in trouble. Project costs doubled. One of the test engines exploded, and the RAF recognized it might take years to understand the cause. In addition, the RAAF announced that it would not order the TSR but was instead buying the US-built F-111. Opposition to the project grew, and in the upcoming general election the Labour Party promised that if elected it would review the project. When the Labour Party won, it immediately began an assessment of the project, which included comparing the TSR to the F-111—considered by now an alternative to the TSR. As cost overruns and schedule delays continued, the MOS slowly withdrew support. The RAF then withdrew its support, when it dis- covered that the F-111, which was already in pro- duction, would meet all of its requirements. The project was canceled.

1. Describe the interaction between the system and its environment.

Reference no: EM132128092

Questions Cloud

Ensure swift facilitation of registration at venue : Outline the procedures you would establish to ensure swift facilitation of registration at the venue.
Decisions made in this project represent system thinking : Do you feel that important decisions made in this project represent “system thinking”? Explain.
What is the required safety stock : What is the economic order quantity? What is the required safety stock? What is the reorder point?
Main factors that contributed to cancellation of project : What are the main factors that contributed to cancellation of the project? Which of these factors would you characterize as project management?
Describe interaction between the system and its environment : Law and Callon31 described history of large British aerospace project in terms of two entities, Describe interaction between the system and its environment.
What effect did the leader actions have on team performance : Without including names, describe a situation in which you have witnessed a leader acting in an unethical manner. What effect did the leader's actions.
What is the cost-minimizing order quantity : Assume that the lead time for the EOQ model is appropriate. What is the cost-minimizing order quantity?
How the functions can help to achieve organization success : Create a 5-7 slide PowerPoint presentation on the human resource functions within an organization that focuses on global expansion.
Management hamper wise technological strategy decisions : How can dreams of annual revenues past $100 million by senior management hamper wise technological strategy decisions?

Reviews

Write a Review

Operation Management Questions & Answers

  Drawing upon examples from your own organisation

Drawing upon examples from your own organisation, or one with which you are familiar select an appropriate recorded measure for five equal periods ( suc as turnover, profit, available from annual reports etc) and having obtained values over the 5 equ..

  What type of motivation does each candidate possess

Given the two types of job candidates, what type of motivation does each candidate possess?

  Efficiency of the production operation

What would you expect the layout of a producing facility to look like (in other words, what is the process layout for such an operation). What would determine when someone had finished working on one of these products (in other words, how would so..

  What are the pros and cons of having public option

There was a lengthy debate about whether to include a public option in health reform. What are the pros and cons of having a public option?

  Think about the characteristics of each approach

Marketing and Public Relations (PR) have a lot of overlap but they are also very distinct from one another.

  Field be zero if one of the charges were negative

Where would the net electric field be zero if one of the charges were negative? Enter your answer as a distance from the charge initially equal 0.470

  Discuss a blue ocean strategy for any organization

Discuss a "blue ocean strategy" for any organization that you are familiar with.

  Determine the training requirement

Has the organization been interested in identifying training needs? What methods did you follow to determine the training requirement?

  Research regarding an aspect of airport security

Conduct an article research regarding an aspect of airport security in terms of technology, issues, human factors, legalities etc.

  False regarding legal liability

Which of the following is false regarding legal liability?

  Discuss about the process of organizational design

Discuss an example where optimal (or improved) organization design resulted in greater functional effectiveness and productivity of an organization.

  How can managers please stakeholders while remaining

how can managers please stakeholders while remaining ethical?explain the importance of ethical responsibility.how do

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd