Describe and define the scope of the project

Assignment Help Computer Engineering
Reference no: EM132137646

Question: This assignment consists of two (2) sections: a business requirements document and a project plan. You must submit both sections as separate files for the completion of this assignment. Label each file name according to the section of the assignment it is written for. Additionally, you may create and / or assume all necessary assumptions needed for the completion of this assignment.

Procuring quality business requirements is an important step toward the design of quality information systems. Completion of a quality requirements document allows user needs and expectations to be captured, so that infrastructure and information systems can be designed properly. Your company, which is a data-collection and analysis company that has been operating less than two (2) years, is seeking to create a repository for collected data beyond standard relational databases. Your ten (10) terabyte data warehouse is expected to grow by 20% each year. You are mindful of data warehousing best practices which will aid you immensely in your requirements gathering effort.

Using the requirements document provided in the course shell, you are to speculate on the needs of the company. You must consider current and future requirements; however, assumptions should be realistic and carefully considered.

Section 1: Business Requirements Document

1. Write a 8 page original business requirements document for the project plan using the template provided. Note: The template is provided under the Additional Resources in the Student Center tab of the online course shell. (attached)

- Describe the project including the following:

- Describe and define the scope of the project.

- Speculate as to how to control the scope.

- Identify possible risks, constraints, and assumptions.

- Describe the relationship and integration between systems and infrastructure. Note: Database and Data Warehousing, Analytics, Interfaces and Cloud Technology, and Infrastructure and Security should be considered.

- Speculate upon potential outsourcing or offshoring needs.

- Identify and justify the necessary resources including staffing that are necessary.

- Define relevant terms that will be used throughout project.

Use 4 quality resources in this assignment. Note: Wikipedia and similar Websites do not qualify as quality resources.

Your assignment must follow these formatting requirements:

• Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA. Check with your professor for any additional instructions.

• Include a cover page containing the title of the assignment, the student's name, the professor's name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length.

Section 2: Revised Project Plan

Use Microsoft Project to:

1. Update the project plan from Project Deliverable 1: Project Plan Inception, with three to five (3-5) new project tasks each consisting of five to ten (5-10) sub-tasks.

The specific course learning outcomes associated with this assignment are:

• Evaluate an organization through the lens of non-IT senior management in deciding how information systems enable core and supportive business processes as well as those that interface with suppliers and customers.

• Use technology and information resources to research issues in information systems.

• Write clearly and concisely about strategic issues and practices in the information systems domain using proper writing mechanics and technical style conventions.

Information related to above question is enclosed below:

Attachment:- Requirements.rar

Reference no: EM132137646

Questions Cloud

What is cost and benefit analysis : What is cost and benefit analysis? Explain the two different types of costs and two different types of benefits. Discuss root-cause analysis as a BPA activity.
Examine the existing system using given information : A description of the tasks and mechanisms that allow you to examine the existing system (a minimum of 3 different tools should be described)
Write a python program with a graphical user interface : Write a python program with a graphical user interface that will allow a user to create a custom pizza which they wish to order.
Provide a proper justification for each step : Research the Internet to obtain information on Windows Group Policies and the Group Policy Editor. Provide a proper justification for each step mentioned.
Describe and define the scope of the project : Write a 8 page original business requirements document for the project plan using the template provided. Note: The template is provided under the Additional.
Discuss cybersecurity policy issues : Discuss cybersecurity policy issues affecting SCADA and ICS systems for Critical Infrastructure services for the public, and compare those issues to the policy.
Correlation between rainfall and average yield : BUSINESS DATA ANALYSIS - FACTS FROM FIGURES - Is there a correlation between rainfall and average yield to suggest a linear relationship? Please explain
Develop a conference management system for user modelling : Develop a conference management system for User Modelling Inc. that allows conference organizers to manage the events and registrations
Case problem - firewall : New firewall from Sicuri and we have noticed a great deal of sign up activity from gmail addresses in Russia. Perhaps we have been hacked

Reviews

Write a Review

Computer Engineering Questions & Answers

  Examine the advantage of using a gantt chart over pert chart

Examine the advantages of using a Gantt chart over a PERT chart and vice versa. Determine when it is appropriate to use one over the other.

  Estimate the probability of the given documents

Estimate the probability that the above documents are relevant to the query. Use a contingency table. These are the only three documents in the collection.

  Find out local area network protocol over a nondeterministic

give the primary advantage of a deterministic local area network protocol over a nondeterministic local area network protocol. Give a real life example of this advantage.

  Write shell script that display names of all directory files

Write a shell script that displays the names of all directory files, but no other types of files, in the working directory.

  Design a combinational circuit with three inputs

Design a combinational circuit with three inputs, x, y, and z, and three outputs, A, B, and C. When the binary input is 0. I, 2. or 3. the binary output is one greater than the input.

  Describe what productivity metrics you analyze to drive

The best Field Account Executives are incredibly metrics focused and manage their time wisely. Please describe what productivity metrics you analyze to drive.

  Implement the playexpert mode of the game

Whether or not you have managed to implement the playExpert mode of the game. If you do not manage to implement it you should carry on with the rest of the questions in novice mode.

  Create the logic for a program that performs functions

Create the logic for the methods sum() and difference(); they compute the sum of and difference between the values of two arguments, respectively.

  Write down mips program that prompts user for a string

Write down MIPS program that prompts user for a string

  Create an empty dictionary called word_frequency

Write an if statement that checks whether the word is already in the dictionary. Create an empty dictionary called word_frequency.

  What type of data does put-line display

What procedure must you call at the end of the loop to use an End_Of_File loop with numeric data? What type of data does Put_Line display?

  Show the operation of the pipeline using a reservation table

Design a pipeline ALU that can add two 8-bit integers. Assume that each stage can add two 2-bit integers and employ sufficient number of stages.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd