1.A completely mixed flow reactor, with a volume of V and a flow rate of Q, has a zero-order reaction, dA/dt = k, where A is the material being produced and k is the rate constant. Derive an equation that would allow for the direct calculation of the required reactor volume.

2.A closed system of 0.123kg undergoes a frictionless, quasi-static process along the path PV=C from 100kpa to a final state where the volume is twice the initial volume. During the process 8140 N-m of work is done by the system. What is the final specific volume (m^3/kg) of the system ?

Reference no: EM13563745

Questions Cloud

Calculate the pressure and mole fractions in the vapor : Water is used in a heat exchange to cool 5 kg/s of air from 400 C to 200 C. Calculate (a) the minimum mass flux (kg/s) of the water and (b) the quantity of heat transferred (MJ) to the water each second. The water enters at 20 C and leave at 30 C.
Balance the latitudes and departures by using the compass : A four-sided closed field traverse has the following angles. A = 81 degrees 22%u201930%u201D, B = 72 degrees 32%u201930%u201D, C = 89 degrees 39%u201930%u201D, D =116 degrees 23%u201930%u201D.
Determine the maximum velocity that the skier will achieve : A person with a mass of 200kg wearing snow skis is gliding down a long slope at an angle of 20 degrees. Each ski is 200cm long and 5 cm wide. The pressure of the skis on the snow melts a thin layer of water so that a .1mm layer of water exists under ..
What volume of naocl will be needed : If the plant uses sodium hypochlorite instead, what volume of NaOCl will be needed? Assume that the dry density of NaOCl is 1.2 kg/L and that 1 mg/L of dissolved NaOCl is equivalent to 1 mg/L of dissolved Cl2.
Derive an equation that would allow for direct calculation : A closed system of 0.123kg undergoes a frictionless, quasi-static process along the path PV=C from 100kpa to a final state where the volume is twice the initial volume. During the process 8140 N-m of work is done by the system. What is the final spec..
How long would you figure the soil will take to reach : An oil storage area, abandoned 10 years ago, had spilled oil on the ground and saturated the soil at a concentration of perhaps 400 mg/kg of soil. A fast food chain wants to build a restaurant there, and samples the soil for contaminants.
What is the minimum chain length for the application : A motorcycle sprocket on the rear wheel has a diameter of 24 cm, and trhe driver sprocket has a diameter of 4.0 cm. The driver sprocket shaft and rear axle are 60 cm apart. What is the minimum chain length for the application.
Determine the number of truck loads required to obtain : For construction of an embankment, the soil is transported from a borrowed area using a truck which carries 5.5 m^3 of soil at a time, with the following details: For the Borrowed Pit: bulk unit weight= 16 KN/m^3
Has the issue of having time not wasting become a parvasive : The plant manager has a decision to make. She needs to reduce the concentration of salt in the 8000- gallon tank from 30000 mg/L to 1000 mg/L. she can do it in one of two ways.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Describe a realistic investment problem where none of the

Assuming we are still in a world with only discrete investment choice, i.e., option A, option B, etc., describe a realistic investment problem where none of the environments discussed apply without some reframing.

  Estimate the power in watts that can be produced by turbine

The design wind speed is 15 mph at T=10C and p=0.9 bar. The efficiency of the turbine is n=20% meaning that 20% of the kinetic energy in the wind can be extracted. estimate the power in watts that can be produced by the turbine.

  Determine how many years from consumption will reach

A community has a current population of 15,000. 10 years ago, the population was 12,500 and the community has a declining growth rate with a saturation population of 22,000.

  Determine the excess rainfall and runoff volume in inches

Suppose a watershed in Athens, Georgia has 25 acres pasture (CN=70) and 50 acres wooded (CN=55). Determine the excess rainfall (in inches) and runoff volume (cubic feet) assuming the design rainfall is 25-year, 24-hour.

  Should the company proceed with the process change

The company Eco-Safe is adding pollution control equipment to its process and reducing emission of pollutants. The annual waste disposal cost of the current process is $130,000 and the annual operating cost is $600,000

  Calculate the concentration of ozone in the warehouse

Ozone is a conservative indoor air pollutant produced by photocopy machines at a rate of 10 mg/h per machine. The owners of CopyCat reproduction services want to open a new

  Four-lane undivided multilane highway

A four- lane undivided multilane highway ( two lanes in each direction) has 11- ft lanes and 5- ft shoulders. At one point along the highway there is a 4% upgrade that is 0.62 mi long.

  Determine the time for the log to reach a speed

A truck is hauling a 300-kg log out of a ditch (20 degree incline) using a winch attached to the back of the truck. Knowing the winch applies a constant force of 2500N and the coefficient of kinetic friction between the ground and the log is 0.45

  What are the velocity and flow rate in the prototype

A dam spillway is to be tested using kinematic similitude (Froude scaling) with a 1:20-scale model. The model flow has an average velocity of 0.7 m/s and a flow rate of 0.06 m3/s.

  Calculate and plot the distribution of total and stresses

A borehole at a site reveals a soil profile comprising 6 m deep fine sand layer overlying a 9 m thick clay layer, which in turn overlies weathered bedrock. The groundwater table is located at a depth of 4 m from the ground surface.

  What is the difference in total cost between the two options

Two remediation options are being considered for a contaminated land area formerly used for industrial operations. Option 1 involves removing all of the contaminated soil over a two-year period at a cost of 2.2$ million per year

  What is the maximum number of phases that may be present

For a ternary system, three components are present; temperature is also a variable. What is the maximum number of phases that may be present for a ternary system, assuming that pressure is held constant?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd