CONTRACTING METHODOLOGY AND TYPE SCENARIOS

SCENARIO: Karenna just returned from a Department of Defense management meeting where the dismal state of the budget was the principle topic. She gave Bob the bad news. It is four months before the end of the year closeout and two major requirements came in from the Navy Warfare Center. The funding is dismal, resources are overloaded and Bob is the only contracting officer she can depend on to be fast and accurate when it comes to complex requirements of this nature. Bob must get these requirements on contract by October 1st. Bob must convene an acquisition team and get started right away. Bob will need to come up with an acquisition strategy to include contract methodology and contract type that will encourage efficient funds management and will motivate the contractors to watch the bottom line.

Requirement 1 -The Department of the Navy, Space and Naval Warfare Systems Center Pacific (SSC Pacific) has a requirement to provide Command, Control, Communications, Computers, and Intelligence (C4I) software support activity (SSA) for systems engineering, integration, information assurance, software maintenance, operational support, training and infrastructure support to SSC Pacific Maritime Global Command and Control System (GCCS) Family of Systems (MGF) Project and other C2 and/or C4I projects within Code 532. Period of performance includes a 3-year base period and 2-year option period. The estimated level of effort for the total requirement is 766,025 hours. The NAICS code is 541330.

Requirement 2 - The Department o the Navy, Space and Naval Warfare Systems Center Pacific (SSC Pacific) and Air Force have a requirement to contract for non personal services to provide all plant, labor, transportation, materials, tools, equipment, appliances and supervision necessary for the renovation of an existing aircraft maintenance hangar consisting of approximately 36,908 SF. The project includes but is not limited to the sustainment of interior walls, ceilings, sound attenuation, and internal and external durable surfaces to include roof and exterior metal panel wall replacement. Repair facility paint, floor coverings, millwork, caulk, protective coatings, wall systems, and hangar door structure. Install fire sprinkler systems, additional steel frame support, metal insulated panels, metal barrel roof, interior walls, HVAC systems, communications wiring, restrooms, millwork, utilities, access pavements, fire protection/detection, fire suppression, site work, anti-terrorism force protection measures, erosion control, drainage structures and landscape. Site work includes but not limited to site work including water, electrical, communications, natural gas, sanitary sewer, and storm sewer connections to existing infrastructure.

Task: You are the contracting officer for the acquisitions discussed above. Develop a viable procurement strategy to include determining the contracting method, contract type and risk.   As you determine the contract methodology and contract type keep in mind some concerns and limitations:

  1. The schedule is aggressive;
  2. Requirement 1 includes proprietary equipment;
  3. Limited funds;
  4. A need for quality because the requirements are vital to national defense.
  5. Security clearances are another important issue. Whoever win the contract have a Top  secret facility clearance, either before or shortly after contract award;
  6. Past protest on both requirements.

Address the following questions in your response to requirements 1and 2 separately:

  1. What contracting method will you use? Why?
  2. What are the key risk areas of the efforts?
  3. What contract type would motivate the contractor to achieve excellence and manage funds wisely? Why?

Reference no: EM131458081

Questions Cloud

Prepare a report analyzing the npv pi of each project : Prepare a report analyzing NPV PI of each project, rank those projects, and provide a Go/Kill recommendation for each, maintaining your $25M development budget.
Describe your personal beliefs about the aca : Go to the government healthcare website and find three facts about the ACA. List and describe each fact. describe your personal beliefs about the ACA.
Why is a multiperiod binomial model a better approximation : Why is a multiperiod binomial model a better approximation to the actual stock price process than the single period binomial model?
Business valuation models that are popular : Define APV. How does it differ from NPV? Identify and discuss at least two other business valuation models that are popular.
Department of defense management meeting : Karenna just returned from a Department of Defense management meeting where the dismal state of the budget was the principle topic.
The role of term structure theories in policy effectiveness : The role of term structure theories in policy effectiveness: What were the goals of “Operation Twist”?
What percentage of data is missing for the variable smoke : Biostatistics POPH90013 Assignment. What percentage of data is missing for the variable smoke? What percentage of data is missing for the variable smoke
Shoppers with different disposable income levels : If stores are placed in different locations, in different locations being frequented by shoppers with different disposable income levels.
The objective for managing inventory : The objective for managing inventory is to

Reviews

Write a Review

Mathematics Questions & Answers

  Questions on ferris wheel

Prepare a Flexible Budget Gator Divers is a company that provides diving services such as underwater ship repairs to clients in the Tampa Bay area.

  Logistic map

This assignment has two question related to maths. Questions are related to bifurcation cascade and logistic map.

  Finding the probability of cards

This assignment has questions related to probabiltiy.

  Systems of ode

Find all the xed points, and study their stability and Draw the phase portrait of the system, as well as the graphs of the solutions in all relevant cases.

  Derive the boolean expression

Derive the Boolean Expression and construct the switching circuit for the truth table stated

  System of equations

Evaluate which equations are under-identified, just-identified, and over-identified.

  Linear programming problem

Linear programming problem consisting of only two constraints with one objective function.

  Find the natural domain

Find the natural domain of the given functions.

  Introduction to numerical methods

Compute the coecients of the polynomials using the term recurrence relation.

  Chart of the topological manifold

De?nition of smoothness of functions on a smooth manifold is chart independent and hence geometric.

  Mathematics in computing

Questions related on mathematics in computing.

  Complex problems

Complex problems

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd