Defining the detailed maintenance plan

Assignment Help Financial Management
Reference no: EM132063924

In defining the detailed maintenance plan and establishing criteria for equipment design (and system support),it is necessary to determine whether it is economicy feasible to repair certain assemblies or to discard them when failures occur. If the decision is to accomplish repair, it is appropriate to determine the maintenance level at which the repair should be accomplished (i.e., intermediate level maintenance or depot level maintenance). For the purposes of this exercise, Assembly A-1 (one of 15 assemblies in Unit B of system XYZ) is to be evaluated in terms of the three options. The following information is provided to facilitate the evaluation of the decision

1. System XYZ is installed in each of 60 aircraft that are deployed at five operational bases over an 8-year period. System XYZ will be utilized on an average of 4 hours per day, 365 days per year, and the total system operating time is 452,600 hours.

2. System XYZ is packaged in three units: Unit A, Unit B, and Unit C. When corrective maintenance is required , a built-in self-test capability enables rapid checkout and fault isolation to the unit level. In the event of a no-go or failure condition, the applicable unit is re­moved and replaced with a spare. The faulty removed unit is sent to the intermediate-level maintenance shop (located at the operational base) for corrective maintenance. Unit repair is accomplished through fault isolation to the applicable assembly (e.g., Assembly A-1), removal of the faulty assembly and replacement with a spare, and checkout of the unit to verify satisfactory operation.The faulty assembly must now be processed in accor­ dance with the designated maintenance plan.

3. Pertinent data associated with Assembly A-1 are noted below.

a. The estimated acquisition cost for Assembly A-1 (to include design and develop­ ment cost and production cost) is $1700 if the assembly is designed to be repairable, and $1600 if the assembly is designed to be discarded at failure.

b. The estimated failure rate (or corrective maintenance rate) is 0.00045 failure per hour of system operation.

c. When failures occur, repair is accomplished by one technician assigned on a full­ time basis (i.e.,for the duration of the predicted elapsed active repair time). The estimated Mct is 3 hours. The labor rate is $20 per labor-hour for intermediate maintenance and $30 per labor-hour for depot maintenance.

d. Supply support involves three categories of cost: (1) the cost of spare assemblies in the pipeline, (2) the cost of spare components to enable the repair of faulty assemblies, and (3) the cost of inventory maintenance. Assume that five spare assemblies will be required in the pipeline when maintenance is accomplished at the intermedi­ate level, and that 10 spares will be required when maintenance is accomplished at the depot level. For component spares, assume a material cost of $50 per maintenance action. The estimated cost of inventory maintenance will be 20% of the in­ ventory value.

e. When assembly repair is accomplished , special test and support equipment is required for fault diagnosis and checkout. The cost per set is $12,000, which includes acquisition cost and runortized maintenance cost.

f. Transportation and handling cost is considered to be negligible when maintenance is accomplished at the intermediate level; however, assembly maintenance accom­plished at the depot level will involve an extensive runount of transportation. For depot maintenance, assume $150 per 100 pounds per one-way trip (independent of the distance), and that the packaged assembly weighs 20 pounds.

g. The allocation for Assembly A-1 relative to maintenance facility cost is categorized in terms of (1) an initial fixed cost, and (2) a sustaining recurring cost proportional to facility use requirements. The initial fixed cost is $1000 per installation, and the assumed usage cost allocation is $1.00 per direct maintenance labor-hour at the in­ termediate level and $1.50 per direct maintenance labor-hour at the depot level.

h. Technical data requirements will constitute (1) the maintenance instructions to be included in the technical manual to support assembly repair activities and (2) the failure reporting and maintenance data covering each maintenance action in the field. Assume that the cost for preparing and distributing maintenance instructions is $1000 and that the cost for field maintenance data is $25 per maintenance action.

i. There will be some initial formal training costs associated with maintenance personnel when the assembly repair option is considered. Assume 30 student-days of formal training for intermediate-level maintenance and 6 student-days for depot-level maintenance. The cost of training is $150 per student-day.

j. As a result of maintenance actions, there will be a requirement for the disposal of ei­ther faulty assemblies or faulty components. The assumed disposal cost is $20 per assembly and $2 per component.

The object of this exercise is to evaluate Assembly A-1 (based on the information provid­ed previously) and make a recommendation. Should Assembly A-1 be (1) repaired at the intermediate level of maintenance, (2) repaired at the depot level of maintenance, or (3) discarded at failure? Show the cost for each of the cost results for each of the the three strategies as a result of the conditions above. use this work sheet to conduct the evualuation. Select the strategy that yields the lowest cost for assembly A-1

Reference no: EM132063924

Questions Cloud

Recalculate book value per share of common stock : Recalculate book value per share of common stock taking into account dilutive effects of the above.
What is the total interest paid in year two constant dollars : What is the total interest paid in year 2 constant dollars with the above inflation rate?
The variance of the waiting times of the customers : The manager of a video library would like the variance of the waiting times of the customers not to exceed 2.30 minutes-squared.
ARM plus fixed rate loans : What is the total amount of interest that you will pay for all of the mortgages (ARM plus fixed rate loans)?
Defining the detailed maintenance plan : In defining the detailed maintenance plan and establishing criteria for equipment design (and system support),
Core competencies within your industry or organization : What are the core competencies within your industry or organization?
Debt obligations to solve european debt crisis : A team of economists has proposed to exploit the financial innovation/engineering that brought us Collateralized Debt Obligations to solve European Debt Crisis.
Calculating weighted average cost of capital : Estimate the appropriate weight of debt to be used when calculating ABC Corp's weighted average cost of capital.
Describe characteristics that differentiate debt and equity : Describe two characteristics that differentiate debt and equity.

Reviews

Write a Review

Financial Management Questions & Answers

  Uses defined benefit pension plan

Big Onion Co. uses a defined benefit pension plan. At year-end the pension obligation is $57.8 million and plan assets $46.9 million.

  Which it would be beneficial to refinance the mortgage

A homeowner took out a 20-year, fixed-rate mortgage of $410,000. The mortgage was taken out 10 years ago at a rate of 5.60 percent. If the homeowner refinances, the charges will be $4,000. What is the highest interest rate at which it would be benefi..

  What is premium or discount as percent of NAV

If the fund sells for $36 per share, what is its premium or discount as a percent of NAV?

  They hedge their won and dollar exposure

On January 3d, 2007, Daimler-Chrysler expects to ship 10,000 cars from its Hyundai affiliated plant in Korea to the US, which it will sell through its US dealers on 240-day terms at $10,000 each. What is one other way they might they hedge their won/..

  What are the all-in costs of bond

10- year fixed-rate subordinated Eurodollar bond at par with an annual coupon of 107/8% and front-end fees of 2.0%. What are the all-in costs of bond?

  What is beta of portfolio

Assume that the market is in equilibrium (This means the required return equals the expected return.) What is the Beta of Portfolio AB?

  What is the value of company

Your company has an expected unlevered, after-tax cash flow for the next two years of $281,000. What is the value of the company?

  Redeem the bond at a time prior to the maturity data

Consider a 10-year, $1000 coupon bond, redeemable at par, and assume that the coupon is paid continuously with an annual coupon rate of 5%. The bond is said to be callable, if the borrower (the issuer) can redeem the bond at a time prior to the matur..

  What is the cash conversion cycle

Parramore Corp has $20 million of sales, $3 million of inventories, What is Parramore's cash conversion cycle (CCC)?

  Use present value analysis to decide which process

A new alloy can be produced by process A. which costs $200,000. The operating cost will be $10,000 per quarter with a salvage value of $25,000 after its two-year life. Process B will have a first cost of $250,000, an operating cost of $15,000 per qua..

  Differences between eurobond and foreign bond

What is the differences between a Eurobond and a foreign bond? What are the different types of exchange rate risk?

  Designed by an engineering team at golem security

A new product is being designed by an engineering team at Golem Security. How much is the target cost per unit?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd