Reference no: EM131909707
Question: 1. Workers should be given more control over the inspection of their own work. Discuss the pros and cons of this proposition.
2. Why are most processes not in statistical control when they are first sampled for control chart purposes?
3. Define the purpose of continuous improvement of quality.
4. How is a Pareto chart used to improve quality?
5. Which technique would be useful for each of the following situations?
a. To rank-order the causes of a quality problem.
b. To brainstorm the reasons why a product might have failed.
c. To find an assignable cause.
d. To determine if a process range is under control.
e. To reduce the variability of failures found in the field under actual use of the product.
f. To achieve the smallest possible variance in the time it takes to wait on tables in a restaurant.