Reference no: EM131031050
Course: IS261-Enterprise IT Systems
Objectives
• To learn how to conceptualize a complex business system.
• Applying ERP life cycle phases prior to implementation.
• Define the different systems and sub-systems in an organization.
Delivery
• Assignment Report in the structure shown below.
Assignment
Select an organization of your choice that does not have an ERP system. Understand their current Information System, business process, and functional requirements.
• Take the role of a project manager for implementing an ERP system for the selected organization.
• Suggest an ERP System for the selected organization. Specify the vendor and tier of the recommended ERP system
• The Assignment needs careful planning. You have to prepare the general plan for the Assignment and study one of the units (modules) in detail. For the chosen unit, you have to analyze the business process in the selected business and map it with the business process in the selected ERP software.
Report Structure:
1. Executive summary
2. Introduction
3. First: Scope and Commitment Stage
3.1 The feasibility study
3.2 Scope of the ERP implementation.
3.3 Resource and time requirement.
3.4 Top management's commitment
3.5 Project teams
4. Second: Analysis and Design Stage
4.1 Analysis of user requirements
4.2 Map the differences between the current business process and the ERP software.
4.3 Design a change management plan
4.4 Training required
5. Third: Plan for Acquisition & Development Stage
5.1 How the system will be implemented?
5.2 Factors that has to be monitored during implementation
6. Conclusion
7. References
Find the latest financial statements
: For the measures listed above, perform a trend analysis, including graphs, for the last 3 years. What conclusions are evident from your trend analysis? Justify your answers and explain how these findings might be relevant to the investor and the ma..
|
Design a synchronous counter that will count given sequence
: Design a synchronous counter that will count the following sequence. 0, 1, 4, 5, 8, 9, 12, 13 and then recycle. Implement your circuit using negative edge-triggered J-K Flip Flops (74LS76). The clock will be a 5V, 1Hz pulse signal.
|
Intital certification to become a liver transplant facility
: Zion Hospital has received intital certification to become a liver transplant facility. The hospital must first complete 18 transplants under intense supervision, and at no cost to the patients. The first transplant was just completed and required 30..
|
Manufactures low-cost tables at a processing cost
: Modern inc, manufactures low-cost tables at a processing cost of $80 per table. the company produces 100 units per day and averages 90% good quality resulting in 10% defective items. Fifty percent of the defective units are reworked prior to shipment..
|
Define the different systems and sub-systems in organization
: To learn how to conceptualize a complex business system. Applying ERP life cycle phases prior to implementation. Define the different systems and sub-systems in an organization.
|
Marketing researcher was doing a survey of snow skiers
: Suppose a marketing researcher was doing a survey of snow skiers residing in South Florida, for the specific purpose of estimating the feasibility of offering discounted snow ski rental equipment.
|
Defendant may make a counterclaim against the plaintiff
: An appellate court’s majority opinion: A defendant may make a counterclaim against the plaintiff: If the mental state of a party to a suit is an issue raised by the other party the: Suppose both sides in a suit agree about certain facts, so they do ..
|
Calculate the price of the bond
: 1. Calculate the price of the bond if the market interest rate is 4%.
|
What technology would you miss the most
: Have you ever thought what it would be like to be without today's current technology? What technology would you miss the most? What would you do to replace it if "new tech" was not an option?
|