Define scope with a work breakdown structure

Assignment Help Business Management
Reference no: EM13711743

Define Scope with a Work Breakdown Structure

In the previous module, you began to plan for scope by developing a Project Charter and a Project Scope Statement. Now you will continue with Scope Planning by developing a work breakdown structure (WBS).

Procedure
1.Review the results from the previous application (the Project Charter and the Project Scope Statement).
2.Create a work breakdown structure for the project, using these criteria: ?It must be easy to interpret, such as a hierarchical list and/or a flow chart.

  • It must be possible for your instructor and other classmates to view it.

3.Tip: If you are using Microsoft applications, then you may need to advise your instructor on how to view your work. For information on Microsoft viewers, go to https://office.microsoft.com.

 

Reference no: EM13711743

Questions Cloud

Composed of mutuality orthogonal unit vectors : Let A, B, C and D denote four reference frames, composed of mutuality orthogonal unit vectors ai, bi, ci and di (i=1,2,3), respectively. Assume that rotation matrices aRc, aRd and bRd are given. Let x, y, z and t denote some specified constants. Give..
Calculate the wall shear stress : State mathematically Newtona's law of viscosity. Water moves over a flat surface. At a point on the surface the velocity gradient is 60 s-1. The viscosity of water is 0.0012 Ns/m2. Calculate the wall shear stress.
Ideal rankine cycle without feed water heating : Consider a power plant operating on an ideal Rankine cycle without feed water heating. Steam enters the turbine saturated at 1000F at the rate of 5 x10 lbm/H. The turbine exhausts to a surface condenser at 1 psia. The condenser has an overall heat tr..
Reciprocating compressor has been selected to compress : A reciprocating compressor has been selected to compress 0.085 m3/s of 25oC methane gas from 100 to 6200 kPa. Assuming that the heat capacity remains constant at 2433 J/(kg?K) over the temperature range of compression and that the ratio of C  p/C  v ..
Define scope with a work breakdown structure : Define Scope with a Work Breakdown Structure In the previous module, you began to plan for scope by developing a Project Charter and a Project Scope Statement. Now you will continue with Scope Planning by developing a work breakdown structure (W..
What is the mole fraction of propane in the fuel stream : A mixture of propane and butane is fed into a furnace where it is mixed with air. The furnace exhaust leaves the furnace at 343°C, 780.0 mmHg and contains only N2, O2, CO2, and H2O. The partial pressure of O2 in the exhaust is 51.40 mmHg and the part..
The project management body of knowledge : Revise all components of your project plan based on the feedback you have received from your professor throughout the course. Add a summary of the changes you have made based on feedback to the end of your plan, and explain why some suggested c..
The mole fraction of water vapor in air-the molal humidity : If the weather report says that it is 60°F outside, the barometric pressure is 28.50 in Hg, and the relative humidity is 85.0%, find the following values. The partial pressure of water. The mole fraction of water vapor in the air
Demonstrate about effect of poor project screening method : What does this case demonstrate about the effect of poor project screening methods on a firm's ability to manage projects effectively? How would project portfolio management help to improve the situation at Keflavik?

Reviews

Write a Review

Business Management Questions & Answers

  Caselet on michael porter’s value chain management

The assignment in management is a two part assignment dealing 1.Theory of function of management. 2. Operations and Controlling.

  Mountain man brewing company

Mountain Man Brewing, a family owned business where Chris Prangel, the son of the president joins. Due to increase in the preference for light beer drinkers, Chris Prangel wants to introduce light beer version in Mountain Man. An analysis into the la..

  Mountain man brewing company

Mountain Man Brewing, a family owned business where Chris Prangel, the son of the president joins. An analysis into the launch of Mountain Man Light over the present Mountain Man Lager.

  Analysis of the case using the doing ethics technique

Analysis of the case using the Doing Ethics Technique (DET). Analysis of the ethical issue(s) from the perspective of an ICT professional, using the ACS Code of  Conduct and properly relating clauses from the ACS Code of Conduct to the ethical issue.

  Affiliations and partnerships

Affiliations and partnerships are frequently used to reach a larger local audience? Which options stand to avail for the Hotel manager and what problems do these pose.

  Innovation-friendly regulations

What influence (if any) can organizations exercise to encourage ‘innovation-friendly' regulations?

  Effect of regional and corporate cultural issues

Present your findings as a group powerpoint with an audio file. In addition individually write up your own conclusions as to the effects of regional cultural issues on the corporate organisational culture of this multinational company as it conducts ..

  Structure of business plan

This assignment shows a structure of business plan. The task is to write a business plane about a Diet Shop.

  Identify the purposes of different types of organisations

Identify the purposes of different types of organisations.

  Entrepreneur case study for analysis

Entrepreneur Case Study for Analysis. Analyze Robin Wolaner's suitability to be an entrepreneur

  Forecasting and business analysis

This problem requires you to apply your cross-sectional analysis skills to a real cross-sectional data set with the goal of answering a specific research question.

  Educational instructional leadership

Prepare a major handout on the key principles of instructional leadership

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd