Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Civil and Environmental Engineering Question1. How is the problem of technology choice related to process selection and product design?
2. Suppose your boss has asked you to evaluate the possibilities of further office automation through linkage to the internet. How would you approach this problem? What information would you gather?
3. What is the main obstacle to using a manufacturing approach to the delivery of services?
4. Explain the differences between economies of scale and economies of scope.
5. Give three reasons why the flow of materials and the flow of control information should be analyzed together, at the same time.
6. What is meant by a sociotechnical approach to process analysis? Under what circumstances should such an approach be used?
Also calculate the deflection of the beam to check that it complies with the design limit of L/200. Only variable actions are required for deflection check.
How would you define the coefficient of permeability? Give typical values of the coefficient for: a) fresh cement pastes; b) hardened cement pastes; c) commonly used aggregates;
If the queue clears exactly at the end of the effective green D/D/1 queuing applies, determine the total vehicle delay in the cycle (in veh-sec) .
Working a problem where there are two one-story buildings of different heights next to each other. Earthquake imparts a base motion z(t) that is a cosine function. I'm given a shape function for a column of height L when deriving the EOM for each ..
The outer surface of the tank is cooled by air at 300 K with a heat transfer coefficient of 100 W/m2K. Determine the maximum temperature in the tank. Take the thermal conductivity of the wastes as 2.0 W/mK.
Determine, for the crest and sag vertical curves required, the stationing and elevation of the PVCs and PVTs given that the PVC of the crest curve(on westernmost level highway section) is at station 0+00 and elevation 100 ft.
Set up a table showing curve elevations at the PVC, at the PVT, and at the half-station points along the curve. Compute the station and elevation of the curve turning point.
The 3.5mg engine is suspended from a 500 kg spreader beam and hoisted by a crane which gives it an acceleration of 4m/s^2 when it has a velocity of 2m/s. determine the force in chains AC and AD during the lift.
The perpendicular distance between two parallel tangents of a reversed curve is 20m. The azimuth of the back tangents of the curve is 270 00 and the azimuth of the common tangent is 310.
The section of the plywood in the 3rd quadrant is sawed off and the resulting piece is then glued squarely over the 4th quadrant portion of the plywood with glue of negligible weight.What are the x- and y-coordinates of the resulting center of gra..
It is required to dewater a construction site 80 m by 80 m. The bottom of the construction will be 1.5 m below the initial water surface elevation of 90 m.
The dye appears 14 days later in an observation well 75 ft away from the injection point. Compute the seepage velocity and estimate the hydraulic gradient in the aquifer if the porosity of the soil is 42%.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd