Reference no: EM13888322
This assignment contains two (2) deliverables: a summary document to be delivered in a word processor document format and a Work Breakdown Structure (WBS) to be delivered in a project file.
Overview:
Imagine that you work as the project manager for an IT department. Your organization has recently approved the development of a mobile application. As the project manager, you will manage the development of the project. The project will include user experience (UX) design by a consultant, graphic design by a team of two contracted designers, and in-house application development by a team of three (3) programmers and a database developer.
Deliverable 1: Summary (MS Word or open source equivalent)
Write a one to two (1-2) page summary document in which you:
Summarize the project requirements and other assumptions (i.e., budget, human resources, workload, environmental dependencies, etc.).
Define a work breakdown structure and describe the methodology behind constructing one.
Deliverable 2: WBS (MS Project or open source equivalent)
Use Microsoft Project or an open source equivalent to create a WBS which addresses the following:
Contain at least five (5) main tasks, one (1) for each of the PMBOK® process areas.
Contain at least thirty (30) line items distributed in five (5) or more work packages.
Contain Work Breakdown Structure Code for each task.
Present duration estimates for each task that results in a duration estimate for the project not to exceed the requirements described in the overview.
Deliverable one (1) of your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions.
Include a cover page containing the title of the assignment, the student's name, the professor's name, the course title, and the date.
The cover page and the reference page are not included in the required assignment page length.
What is feedback? what are possible consequences
: What is feedback? What are possible consequences of inadequate feedback?
|
How the economic idea plays a prominent role in the story
: Read the article above and provide a 2-3-sentence summary of the article in the opening paragraph. In your second paragraph, you must explain an economic idea contained in this story. Specifically, note how the economic idea plays a prominent role in..
|
Initial velocity of magnitude
: A ball is thrown from the roof of a 22.0 m tall building w ith an initial velocity of magnitude 12.0 m/s and directed at an ang le of 53.1°above the horizontal. What is the speed of the ball just before it strikes the ground? (Neglect air resistan..
|
Identify the steps in the systems development process
: Identify the steps in the systems development process and state the goal of each.
|
Define a work breakdown structure and describe methodology
: Define a work breakdown structure and describe the methodology behind constructing one
|
Calculate the elastic potential energy
: When a mass is attached to the end of the spring and allowed to come to rest,the vertical length of spring is 3.57 m. Calculate the elastic potential energy stored in the spring?
|
How should mary deal with peggy
: What is the ethical dilemma in this case, and what values are in conflict? How should Mary deal with Peggy, Joe, the donor, and representatives of the corporation
|
What are computer literacy and information systems literacy
: What are computer literacy and information systems literacy? Why are they important?
|
Create a budget for a home improvements store
: Create a budget for a home improvements store which needs to including a contingency amount and the estimated requirements for money, materials, people, any contracts etc. (Budget & short paragraph explaining the budget) for implementation of ISM.
|