Reference no: EM131380921
This assignment contains two (2) deliverables: a summary document to be delivered in a word processor document format and a Work Breakdown Structure (WBS) to be delivered in a project file.
Overview
As the project manager for an IT department, you have been assigned to manage the project of deploying a new VoIP phone system to the company's campus. The campus consists of three (3) different buildings, each with twenty to fifty (20 to 50) workstations. The project must be completed in ninety (90) calendar days.
Deliverable 1: Summary (MS Word or open source equivalent)
1. Write a one to two (1-2) page summary document in which you:
a. Summarize the project requirements and other assumptions (e.g., budget, human resources, workload, environmental dependencies, etc.).
b. Define a work breakdown structure and describe the methodology behind constructing one.
Deliverable 2: WBS (MS Project or open source equivalent)
2. Use Microsoft Project to create a WBS which:
a. Contains at least five (5) main tasks, one for each of the PMBOK® process areas.
b. Contains at least sixty (60) line items distributed in ten (10) or more work packages.
c. Contains Work Breakdown Structure Code for each task.
d. Presents a duration estimate for each task which results in a duration estimate for the project not to exceed the requirements described in the overview.
Deliverable one (1) of your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions.
Include a cover page containing the title of the assignment, the student's name, the professor's name, the course title, and the date.
The cover page and the reference page are not included in the required assignment page length.
The specific course learning outcomes associated with this assignment are:
Identify how project management improves the success of information technology projects.
Explain the relationship of the scope of a project to the work breakdown structure.
Use technology and information resources to research issues in IT project management.
Write clearly and concisely about issues in IT project management using proper writing mechanics and technical style conventions.
|
What is the power of a hypothesis test
: What is the power of a hypothesis test? Why is it important?- How is the power of a hypothesis test related to the significance level σ?
|
|
What highly volatile liquid can cause grave danger to ehs
: What highly volatile liquid can cause grave danger to EHS and FS professionals at incident scenes because its vapor is 2.6 times heavier than air, has an extremely low autoignition temperature of 212 degrees Fahrenheit.
|
|
Conduct the test
: A sample of 30 firms reveals an average of $235 million and a standard deviation of $85 million. Conduct the test at α = 0.05 and α = 0.01. State your conclusions.
|
|
Conduct the test and state your conclusions
: Conduct the test and state your conclusions. Use the lower value, 7%, in the null hypothesis. Use α = 0.01. Interpret.
|
|
Define a work breakdown structure
: As the project manager for an IT department, you have been assigned to manage the project of deploying a new VoIP phone system to the company's campus. The campus consists of three (3) different buildings, each with twenty to fifty (20 to 50) work..
|
|
Perform an internet search for creative spark ted channel
: Review the entire list of talks on the "Creative Spark" TED channel - How the talk's content illuminates some of the stages of creativity.
|
|
Describe the appearance of the salt after heating
: Record any notable observations while the salt is heating. Describe the appearance of the salt after heating. What differences do you notice between heating this salt and the original three salts?
|
|
Are the local and national health care providers adequately
: The count for people suffering from a diagnosable mental disorder in a given year is on the rise. This figure translates to approximately 57.7 million people currently (National Institute of Mental Disorder, 2008).In relation to problems regardin..
|
|
Examine a job that you have had in your current comapny
: Compare and contrast the significant similarities and differences among the theories of goal setting, self-efficacy, and reinforcement. Specify the theory that you believe most closely aligns with your current or future approach to motivating empl..
|