You have been contracted by the University to come in and consult on the current quality, status, capacity & risk profile of their main data centre operation.
There has been a series of incidents including a massive outage last year which the University are keen to ensure doesn't happen in the future.
You are required to submit a report to the Head of IT & the Board of Deans which highlightsyour findings and recommendations for their data centre.
Business Report
You are required to produce a business report with an Executive Summary.
This means it needs to be quick & easy to read and understand, not have any waffle or general details like definitions etc. Assume your audience understand the main elements of a DC but need your expert analysis and advice.
Report Must Cover Following Sections:
1. Executive Summary
2. Analysis of Data Centre Layout & Design of the 2 rooms & other areas within the DC facility. (Use DC Floor Plan Doc)
3. Capacity Analysis of the existing DC Facility & Infrastructure including potential for growth.
4. Risk & Redundancy Analysis of the existing DC Facility & Infrastructure
5. A Plan to Mitigate Any Major Issues identified in Layout & Design, Current Capacity if any and Uptime/Redundancy to ensure that the facility if more robust in the future.
6. The University needs to add a further 40 racks (4 KW per rack) into the existing facility. Produce a feasibility study on whether this is possible and if not, what changes can be made to ensure it can happen in the future. Please ensure you include all your calculations and analysis of capacity etc.