Critically evaluate the application of measurement rules

Assignment Help Civil Engineering
Reference no: EM132864061

CE701 Applied sustainable construction technology & Measurement - Kingston University London

Module - Applied sustainable construction technology & Measurement

Learning Outcome 1: Demonstrate a working knowledge of the construction of low and high-rise buildings both commercial and residential
Learning Outcome 2: Demonstrate the ability to competently specify the building technologies involved in the construction of complex structures.
Learning Outcome 3: Measure structures and work sections of complex buildings and infrastructure works competently.
Learning Outcome 4: Critically evaluate the application of measurement rules of standard industry conventions in quantifying complex construction works.

Assessment task

Part 1
The work in Part 1 is to be measured in accordance with the latest Civil Engineering Standard Method of Measurement (CESMM).

Take off the quantities and prepare descriptions for the piles, pile caps, and bridge abutments in the drawings numbered 5120315-BR-DD-001, 5120315-BR-DD-002,5120315-BR-DD-003, 5120315-BR-DD-004, and 5120315-BR-DD-005.

You are to measure thein-situ concrete, reinforcement and formwork only.

Part 2

The work in Part 2 is to be in accordance with the New Rules of Measurement 2 (NRM2).

Using the information supplied, this includes drawings, finishing schedules and door and window schedules, measure and price the internal finishes for the semi-detached houses using CostX software.

You are to also prepare:
• Items for inclusion in the Preliminaries Bill for the Employers requirements (NRM2 1.1);
• A BQ Provisional item for £7,200 to be spent on fencing; and
• A Dayworks Bill

(You may make an estimate of the cost of the dwelling and assumptions of the trades needed)

Note: Preamble clauses may be written if needed.

Part 3
Using the BIM model of the technical college building provided, measure completely, the following elements:
• Floors
• Roof
• Curtain Wall

Part 1
The work in Part 1 is to be measured in accordance with the latest Civil Engineering
Standard Method of Measurement (CESMM).

Take off the quantities and prepare descriptions for the piles, pile caps, and bridge abutments in the drawings numbered 5120315-BR-DD-001, 5120315-BR-DD-002,5120315-BR-DD-003, 5120315-BR-DD-004, and 5120315-BR-DD-005.

You are to measure thein-situ concrete, reinforcement and formwork only.

Part 2
The work in Part 2 is to be in accordance with the New Rules of Measurement 2 (NRM2).

Using the information supplied, this includes drawings, finishing schedules and door and window schedules, measure and price the internal finishes for the semi-detached houses using CostX software.

You are to also prepare:
• Items for inclusion in the Preliminaries Bill for the Employers requirements (NRM2 1.1);
• A BQ Provisional item for £7,200 to be spent on fencing; and
• A Dayworks Bill

(You may make an estimate of the cost of the dwelling and assumptions of the trades needed)

Note: Preamble clauses may be written if needed.

Part 3
Using the BIM model of the technical college building provided, measure completely, the following elements:
• Floors
• Roof
• Curtain Wall

Practical Report
The report should be submitted online as a single combined Word or pdf file. The exf files for Part 2 and Part 3 are to be submitted separately as supporting information

Part 1
Your work should be presented as per CESMM4 and industry standard format within the combined Word or pdf report file.

Part 2
Your work should be presented as per NRM2 and industry format within the combined Word or pdf report file. The report must include query sheets and the pdf priced bill generated from your iTWOcostX building file. Theexf file containing all your measurements and costings must also be submitted. Marks will not be awarded for the accuracy of rates used in pricing, rather marks will be awarded for the skilful use iTWOcostX as an integrated measurement and costing software.

Part 3
Your work should be presented as per NRM2 and industry format within the combined Word or pdf report file. This must include query sheets and the pdf priced bill generated from your iTWOcostX building file. Theexf file containing all your measurements must also be submitted.

Word Limit: No set word limit. A limit of three files can be submitted: one report and two exf files.

Research and referencing

You are expected to refer to the indicative bibliography of the module provided in the Module Descriptor and the additional bibliographic sources suggested in the lecture programme and notes. In addition, you must undertake your own appropriate further reading and research in relation to the matters addressed in this coursework brief. Evidence of independent reading and research will be rewarded. A list ofReferences must be presented at the end of the report listing all bibliographic sources cited in the main report.

Attachment:- Sustainable construction technology.rar

Reference no: EM132864061

Questions Cloud

Complete external environmental scan : Complete the external environmental scan for your organization. Perform an internal competitive environmental scan for your organization.
Quality management : Determine one key differentiating factor between the new approach to quality and performance management that you chose and past approaches
Change management system : You and your manager reviewed the change management system you defined for the project
Find the break-even point for Gardner Corporation : Find the break-even point (rounded to the nearest dollar) for Gardner Corporation for the current year
Critically evaluate the application of measurement rules : Critically evaluate the application of measurement rules of standard industry conventions in quantifying complex construction works
Explain the goals of firms and role of financial concepts : Explain the goals of firms and the role of financial concepts in value creation? Identify the role of firms and the roles and responsibilities
Calculate depreciation expense at the end of the first year : The Cerearls Company purchases equipment for $100,000. Calculate depreciation expense at the end of the first year using the double-declining balance method
What amount should lucban report as bonds payable : In its December 31, 2020 statement of financial position, what amount should Lucban report as bonds payable
What should Phil have done differently : The cost of the new machine by itself was listed in the proposal at $1.1 million. What should Phil have done differently

Reviews

len2864061

4/21/2021 9:24:58 PM

This coursework involves quantity surveying measurement both manual and in CostX

Write a Review

Civil Engineering Questions & Answers

  Value for portb after the execution

Find the value for PORTB after the execution of the following code:

  At what rate should the well be pumped for the water level

A well of 0.4 m diameter fully penetrates a 25 m thick confined aquifer of coefficient of permeability of 12m/day. The well is located in the center of a circular island of radius 1 km.

  Determine the total cost function

Determine the total cost function C (T). (Hint: It includes the cost of producing the product and fixed cost.) Find the marginal cost function Cm for producing the product

  What is the required diameter of the parison

A blow-molding operation is used to produce a bot-tle with a diameter. ef 2.250 in and a wall thickness of 0.045 in. The parison has a thickness of 0.290 in. The pressure used to inflate the parison is 38.0 lb/in2.

  What is the level of service on a km long percent upgrade

A rural freeway has an ideal free-flow speed of 120 km/h and two 3.6 m lanes in each direction, with right shoulder lateral clearance of 1.2 m. Interchanges are spaced approximately 5 km apart. Traffic consists of 10 percent trucks and buses and 8..

  How much the net power input required

Consider an ideal gas refrigeration cycle using helium as the working fluid.

  Discuss the environmental and sustainability factors

Discuss the environmental and sustainability factors which impact on and influence the material choices for a construction project

  What is the oil flowrate in stb

Two wells had been drilled on 40-acre spacing. Well 1 is injectionand Well 2 is producing well. Downhole injection pressure is 8500psi, and bottomhole pressure in producing well is 2400 psi.

  What is the net force of the water on the block

A horizontal het of water at 5 degrees celsius strikes a block and is deflected upward 30 degrees. The mass flow rate of the water is 1.75 kg/s. The mass of the block is 1.30 kg. The jet has a cross sectional area of 10 cm^2

  Upper reservoir supplies the average electrical load

How many hours could the upper reservoir supplies the average electrical load of the community when discharging to the lower reservoir?

  What is the cost to the financial institution

What is the cost to the financial institution? Assume that, at the end of year 6, the interest rate is 3% per annum in Swiss francs and 8% per annum in U.S. dollars for all maturities. All interest rates are quoted with annual compounding.

  How many paces should the same surveyor count

He counts 43 paces while walking from point A to point B. What is the distance between A and B?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd