Reference no: EM133114735
Data Centre Design Case Study - University of Bolton
Learning Outcome 1: Critically evaluate models of data centre infrastructure management and its strategic support in data centre design
Learning Outcome 2: Model appropriate infrastructure solutions that reflect specific technological requirements for power within the enterprise level data centre and required service levels
Assessment Brief
For this assessment you will be given a specific set of requirements for a new data centre implementation for an example company scenario. You will need to analyse the requirements set out in the case study. Using academic sources, you will propose a data centre design to meet the needs of the case study based on current research and best practice. Your report will include:
• Computing resources to meet current and future capacity requirements
• Proposals to manage the computing infrastructure
• Discussion of networking and interconnections
• Discussion of power, cooling and other services
• Location considerations
Critical analysis and application of material you have read as you research this assignment is an essential component of this assignment. You must demonstrate that you have read widely using relevant academic sources and use this in your written report effectively.
References from commercial sources and general internet sources can be used, but the majority of sources you cite must be from academic sources such as journals and books.
You are advised to reference all your sources whether you quote them directly or not. Read your source material and then write in your own words what you have understood from the source and then reference it anyway.
Case Study Detail
MightyDial have been in the Internet Service Provider (ISP) business for 25 years. They have decided that they need to adopt the public cloud in a big way in order to compete with other providers in their sector.
They have decided to build a flexible AWS-style data centre to provide flexible commodity computing to their customers. Their design goals are:
• 1 million cores
• A mix of memory scales with up to 384 GB RAM per CPU (not per core)
• An average of 16GB disk space per core
The company want you to design and specify the provision of computing and other resources for this data centre. You should plan and specify:
• At least 10 different virtual machine node types to cope with different workload patterns. For example the AWS t2.nano node has 0.5GB RAM, 1 core and 8GB Disk, r5.xlarge offers 4 cores, 32GB RAM and more disk. You should specify some CPU intensive and memory intensive node types.
• At least one plan for the contents of a computer rack. You may choose to have one standard rack replicated everywhere or more than one design - document all the designs you choose. You can opt for standard 42U racks or alternatives from OCP for example.
• Computer types to deploy. You can choose off-the-shelf standard hardware from Dell or similar vendors. Alternatively, you can chose Open Compute Project hardware.
• The networking infrastructure to connect within and between racks and on to the outside world.
• The power and cooling requirements for your planned data centre
• An outline of the software command and control system to deliver this flexible virtual machine-based infrastructure
For each of these discussion points you must specify what your solution is and give detailed reasons for your suggestions. Your suggestions and in particular your reasons must be backed by thorough academic references using the University's standard Harvard notation.
Attachment:- Data Centre Design Case Study.rar
Credit rating agency to lower the rating of the bonds
: A financial institution buys a $1 million bond issued by a large manufacturing company. The financial institution wants to protect itself from credit risk and p
|
What is the pro forma value of the combined firm
: GAME is also thinking of expanding by acquiring Online All the Time, Inc. (Online) to accelerate its streaming gaming platform.
|
Investment portfolio of bonds
: For the past three years, Bonafacio Holdings Ltd. has held bonds as investments, which it accounted for using the amortized cost model. The bonds were purchased
|
Compute the npvs of the two projects
: a) Compute the NPVs of the two projects. Which project is better? If there were no financial constraints, in which project(s) would you invest?
|
Critically evaluate models of data centre infrastructure
: Critically evaluate models of data centre infrastructure management and its strategic support in data centre design
|
Estimated cost of equity
: Laramie Trucking's CEO is considering a change to the company's capital structure, which currently consists of 25% debt and 75% equity. The CFO believes the fir
|
Use of financial leverage for a utility company
: What factors would cause a difference in the use of financial leverage for a utility company and an automobile company taking into consideration today's COVID e
|
What is the npv of the project
: You are considering investing in a start up project at a cost of $80,000. You expect the project to return $33,000, $25,000 and $55,000 to you in the next three
|
Entertainment without losing artistic value
: "Worship can become an art form. Art can become entertainment without losing its artistic value."
|