Create federated bim model of a pedestrian footbridge

Assignment Help Civil Engineering
Reference no: EM13945876

Building Information Modelling

During the delivery of this coursework students will gain an understanding of the importance of sharing project knowledge at an early stage of programme. It is also intended that students will adopt a robust methodology to the structuring and classification of information and asset data.

Students will create a simple federated BIM model of a Pedestrian footbridge for the Campus as indicated in Appendix A. This is for the primary purpose of delivering BIM asset information to the project team at Project Concept Stage. Please use the individual dimensions in Appendix B for the typical cross section.

Models must be created in metres and co-ordinated to a common, clearly de-fined and labelled grid system. Datums will be in metres. All 3D models will be at a true world scale i.e. 1:1.

To limit work load and reduce complexity this model is clearly identified as being required for concept design to enable the design team to commence preliminary de-sign work. It will therefore require a Low level of detail (LoD) and Low level of Infor-mation (LoI)

All models must adhere to the following guidelines:-

1. Use BS1192:2007 Layers organised by engineering discipline

2. Adopt Uniclass 2015 to classify their internal block names and model names

3. The project number can be your student identification number.

Students will use Autocad to create their models.

The federated model will comprise of three discipline models from the following engineering disciplines:-

1. Structural e.g. Footbridge Foundations

2. Fabricated Steelwork

3. Bridge Deckings and any additional handrailing or furniture

Asset data could compromise details such as dimension size, material, role/owner, maintenance requirements etc.

Marks will be allocated as follows:

1. Modelling

2. Grid system

3. Layering

4. Classification

5. Asset data transfer

Students will submit two A3 sheets

Sheet (a) will contain the drawing of their federated model. It does not need to be printed to scale. However the model should be clearly illustrated together with the co-ordinating grid system. Please note that this model is often referred to as a PIM (project information model)

Sheet (b) will contain 3 tables documenting a summary of the layering, classification and asset data. The asset data will be a snapshot from their excel database. Please note that the asset model is often referred to as the Asset Information Model (AIM)

Each of the three models must be clearly labelled, including the structured nam-ing classification.

The simple title block should clearly indicate the students and identification number.

Please note that students should choose a simple engineering model as a basis to illustrate their understanding of how BIM can support the collaboration and sharing of data.

For supporting information, please refer to: BS1192:2007 (this offers specific guidance on layer naming and model co-ordination)
PAS1192 part 2 for BIM concepts

NBS website for Uniclass 2015 (this offers specific guidance on the correct naming and classification of discipline models)

Class notes and Comprehensive Autocad online help system for Autocad 3d solid modelling, block creation, attribute creation and attribute extraction.

Autocad commands that may prove useful include:

1. Extrude - to extrude a 3D solid from a closed polyline

2. Union - to join two solids

3. Vport - to create different views of the simple model

4. Attdef - to create an attribute

5. Block - to create a block

6. Ddatte - to fill in a blocks value

7. Use the data extraction command within Autocad to filter and extract selected block and attribute value. This will enable the development of your Asset information model/database in Excel

Appendix A - Typical Section through Pedestrian Footbridge

1092_Typical Section through Pedestrian Footbridge.png

APPENDIX B: Section Line location

First Letter of Your Surname

First Letter of Your Forename

Please take the section dimensions as follows:

 

 

Dimension A

Dimension B

A-H

A-H

1.3 Metres

1.2 Metres

A-H

I-Z

1.4 Metres

1.3 Metres

I-N

A-H

1.3 Metres

1.4 Metres

I-N

I-Z

1.4 Metres

1.2 Metres

O-Z

A-H

1.3 Metres

1.3 Metres

O-Z

I-Z

1.4 Metres

1.4 Metres

Snapshot from Ordnance Survey Tile TQ0682.dwg (supplied)

Attachment:- Building information modeling.rar

Reference no: EM13945876

Questions Cloud

What is formula for calculating straight-line depreciation : What is the formula for calculating straight-line depreciation? How is reducing-balance depreciation calculated? How does depreciation help to retain cash in a business for asset replacement?
What is the importance and/or use of the program telnet : While I do not want to have a conversation with him, instant messenger with him, or send him an email, I would like to send him a short message to meet for a break at 2:00
How should the cost of a non-current asset be decided : Why is depreciation said to cause an allocation problem in accounting? How should the cost of a non-current (fixed) asset be decided?
Discuss using an example what are public goods : Why is fishing in the ocean, where there are no well-defined property rights, a concern regarding our ability to ensure sustainable use of our fishing stock? Research what is being done in New England coastal fisheries to ensure sustainable cod fi..
Create federated bim model of a pedestrian footbridge : Create a simple federated BIM model of a Pedestrian footbridge for the Campus - This is for the primary purpose of delivering BIM asset information to the project team at Project Concept Stage.
Discuss the possibility of setting up a wireless network : Imagine you are a wireless network contractor and you are meeting with a potential client over lunch to discuss the possibility of setting up a wireless network in the client's building.
What was the unemployment rate in april : In June there are 30,000 people classified as unemployed and the size of the labor force is 600,000. The only change between June and July is that 10,000 people give up looking for work. Compute unemployment rate in July.
What information do users need about current assets : What information do users need about current assets? What is meant by FIFO, LIFO and the average cost method of pricing issues of goods? How is a provision for doubtful debts decided upon?
What is the terminal velocity : 1. Find the numerical solution using two MATLAB ode solvers, ode45 and ode23. Use an anonymous function as the input function for your ode solvers. 2. On the same graph (can do a subplot), plot velocity versus time for each ode solver, and label th..

Reviews

Write a Review

Civil Engineering Questions & Answers

  Engineering ethics and ethical issue

what is the engineering ethics course where to write about any engineering ethical case and discuss the ethical issue?

  Engineering ethics and concept and cases

what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?

  Transportation and management

In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.

  Supporting Investment Promotion: ERNST & YOUNG

Ernst & young is currently providing support to various sectors. In this regards it was felt that if this report is able to document good practices currently being adopted or planned in ceramic sector.

  Personalized Cancer Therapy-A step forward

Cancer is the uncontrolled growth of abnormal cells in the body resulting in tumours that can be benign or malignant (cancerous cells). A proper treatment is necessary to fight with this serious disease.

  Discuss the different environmental companies

Discuss the different agencies, institutes, centers, different environmental companies that are active in UAE.

  Develop a simple urban constructed wetland design

Develop a simple urban constructed wetland design.

  Evaluate company performance in relation to GRI standards

Evaluate company performance in relation to GRI standards and comment on Stigler's theory.

  Water system design

Determine the corresponding error in the computed discharge

  Hydraulic behaviour in open channel

Describe how test flumes and associated equipment are used to assess and confirm hydraulic behaviour in open channel

  Write a paper on steel sustainability

Write a paper on steel sustainability.

  Writing case study about bridge collapse

Writing case study about bridge collapse

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd