Reference no: EM132195445
Question: Make the needed corrections to Assignment 3 using instructor feedback and initialize a new project in Microsoft Project to complete the following:
1. Create a work breakdown structure in MS Project using the existing information from Assignment 3. Note: This assignment will require you to submit a zipped file. Please see below for details on how to zip a file.
Imagine your human resource project of revamping the employee compensation and benefits package is starting to develop issues. The project is eight (8) weeks off track and your team members are becoming discouraged. Several members of the team are consistently late with deadlines, and you have discovered that your budget depleted quicker than expected. Your project sponsor is looking for you to salvage this project
Write a six to eight (6-8) page paper in which you:
1. Communicate the budget and schedule situation to the rest of the team and your project stakeholders.
2. Suggest at least three (3) ways to improve your underperforming team.
3. Organize a plan of action to get the project back on track. Develop a new critical path.
4. Identify and discuss the risks with your plan for getting the project back on track.
Your assignment must:
• Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; references must follow APA or school-specific format. Check with your professor for any additional instructions.
• Include a cover page containing the title of the assignment, the student's name, the professor's name, the course title, and the date. The cover page and the reference page are not included in the required page length.
To zip a file please follow these directions below. Note: Directions may vary depending on the operating system.
PC Directions
1. Select the files to zip.
2. Right-click on the highlighted files and choose "Send to: Compressed folder".
Mac Directions
1. Select the files to zip.
2. Right-click on the highlighted files and choose "Compress".
Follow all directions clearly
Write a 6-8 page paper using the instructions above (not including the title or reference page)
APA style only
Zip the drive as directed above
Use the upload to zip the file
Absolutely no plagiarism
Be thorough and concise and follow the directions required for the paper above