Reference no: EM13310411
Scope and Time Management
This assignment consists of two (2) sections: a Work Breakdown Structure (WBS) and a summary document. You must submit the two (2) sections as separate files for the completion of this assignment. Label each file name according to the section of the assignment it is written for.
Overview:
As the IT Project Manager, you have been assigned a project to deploy ten (10) wireless access points in your company's warehouse and break room within the next ninety (90) days. You are free to make assumptions that satisfy the scope of the project such as training, wiring, consulting efforts, etc.
Your submission will also be graded on the accuracy of your work package assumptions and duration estimates.
Section 1: Work Breakdown Structure (WBS)
Required Format (MS Project File)
1. Use Microsoft Project or Open Project (.mpp format) to create a WBS in which you:
1. Create 15 or more decomposed work packages into 4 levels that are assigned to 5 or more main tasks (75 line items).
2. Ensure the main WBS tasks headings are the 5 PMBOK® process areas.
3. Create a Work Breakdown Structure Code for each task.
4. Determine an overall project duration and duration estimates for each of the tasks. The duration is not to exceed 90 days.
5. Create accurate work package assumptions and duration estimates.
Section 1 of your assignment must follow these formatting requirements:
• Microsoft Project or its open source alternative in .mpp format.
Section 2: Summary Document
Required Format (MS Word File)
2. Use Microsoft Word to write a one (1) page summary in which you:
1. Summarize how this activity improves the chances of your future IT project being a success.
2. Use at least one (1) quality resource in this assignment. Note: Wikipedia and similar Websites do not qualify as quality resources.
What is the probability that they will not be in violation
: What is the probability that Medco Construction will be in violation of their construction contract and what is the probability that they will not be in violation?
|
Determine length of the cable between the pulleys a and b
: Cylinders C and D are attached to the end of the cable. if D has a mass of 600 kg, determine the required mass of C, the maximum sag h of the cable, and the length of the cable between the pulleys A and B.
|
Evaluate the magnitude of the charges
: Two equal, but oppositely charged particles are attracted to each other electrically. evaluate the magnitude of the charges
|
Determine the controlling ct factor at the water temperature
: A small city is evaluating disinfection requirements for their drinking water plant. With an average flow of 5 MGD and a peak flow of 9 MGD, determine the controlling CT factor (virus or giardia) when the water temperature is 23 degrees C.
|
Create a work breakdown structure code for each task
: Use at least one (1) quality resource in this assignment. Note: Wikipedia and similar Websites do not qualify as quality resources.
|
What is the maimum speed of the ejected electrons
: when a photoelectric surface is illuminated with f 437 nm , the stopping potential 1.67 v, what is the maimum speed of the ejected electrons
|
What is the bright fringe separation
: a double-slit arrangment prduce bright interference fringrs that are seprated by 2.60 mm when the wavelengt is 589nm. what is the bright fringe separation
|
Units of elephants produced sold for $2,000 per unit and the
: Country A produces two goods, elephants and saddles. In the year 2006, the 10 units of elephants produced sold for $2,000 per unit and the 25 units of saddles produced sold for $200 per unit.
|
Determine the aeration period and f by m ratio
: Two activated sludge aeration tanks in Podunk, MO are operated in series. Each tank has the follwing dimensions: 7.0 m wide x 28.0 m long x 3.5 m effective liquid depth.
|