Reference no: EM13952497
Instruction:
- Read and review the attached document.
- This requires a WBS and preliminary project schedule based on the information in the attached document.
- Use the information in the attached document in creating task lists and WBS to develop a work breakdown structure (preferably in MS Project).
- Use a coding system for the WBS.
- Use the information presented in the attached document to develop a schedule.
- Be sure to link all tasks appropriately.
- #1, #2 and #3 should preferably be views in individual MS Project files.
Problem:
1 - Create a work breakdown structure
2 - Create a view of the network plan.
3 - Create a view of the gannt chart illustrating task dependencies.
4 - Identify the critical path.
5 - Define sensible milestones and give arguments for the choices.
6 - How sensitive is this network?
Attachment:- Background.doc
|
Research financial policies that promote international trade
: You have been hired as a consultant to analyze the possibilities, make a recommendation on what path to follow, and assist in transition.
|
|
What is its speed just before it returns to the ground
: Light from a tiny light bulb shining through a mask illuminates 40.7 cm2 of a screen placed 10.6 cm from the bulb. Predict the screen area that would be illuminated at a distance of 155.4 cm from the bulb.
|
|
Weekly topics relate to application in your field
: Discuss this week's objectives with your team. Your discussion should include the topics you feel comfortable with, any topics you struggled with, and how the weekly topics relate to application in your field.
|
|
Hydrographic survey deals with the study of
: Hydrographic survey deals with the study of An ideal vertical curve to join two gradients is called?
|
|
Create a work breakdown structure and explain it in detail
: Use the information in the attached document in creating task lists and WBS to develop a work breakdown structure (preferably in MS Project).
|
|
The foreign corrupt practices act
: How the Act impacts businesses nationally, and internationally. The penalties that are imposed for violating the Act
|
|
Calculate the specific surface in terms of areas
: Calculate the specific surface of a cube (a) 10 mm, (a) 1 mm, (a) , and (d) 1 nm on a side. Calculate the specific surface in terms of areas
|
|
How would you satisfy your energy needs as time goes on
: Scientists, philosophers, and poets alike have speculated on the fate of the universe. How would you prefer the universe as we know it to end, in a big crunch or through eternal expansion? Explain the reasons behind your preference.
|
|
Determine the value of r
: Problem 1: In the figure shown, each resistor has the same resistance R. The equivalent resistance measured between terminals A and B is Req = 38 Ohms. Determine the value of R.
|