Reference no: EM13947818
[Assignment9_yourlastname.cs] Create a Windows Form Application project.
1. Create a Form for a car rental company and set the form text property to Car Rental and the form backcolor to GradientInactiveCaption.
2. Allow the user to select from a list of car styles: Compact, Standard, or Luxury.
3. Use a calendar that defaults to the current day and allows the user to select a future date when the car will be returned.
4. Add a Selection Complete button
5. After these two selections are made the user will click the Selection Complete button that will compute the total price of rental.
6. The number of days that the customer will have the car will be determined by the difference between the current date and the future date selected on the calendar.
7. The total price will be the number of computed rental days times the cost for the model of car selected. ($19.95/day for Compact, $24.95/day for Standard and $39/day for Luxury).
8. Display the Number of Rental Days: and Total Price is: values on the form in two separate non-updateable controls
9. Add an Exit button that will close the application.
10. Each button will have a Light Cyan backcolor property.
11. Internal documentation.
Submit Assignment9.cs file by including the .cs file in the zipped file noted below.
If you have any questions be sure to ask as early as possible (hint: start the project early in the week).
NOTE: When you submit Assignment9 you will need to provide the complete project folder for each project (not just the .cpp file).
Please zip the entire project folder for submission to the DropBox.
Here is a short video on how the application might work ---> assignment 9
Please disregard the assignment9_b.zip file linked at the top of the page. There is no assignment 9b
Allowable bearing capacity of the foundation
: a. Determine the allowable bearing capacity of the foundation. Let FS 5 3. b. Plot a graph of the ultimate bearing capacity qu if b is changed from 0 to 6 m.
|
Create a client/property database using microsoft access.
: The file New Database window opens, then type the word Client as the name for this file where the cursor is blinking, then click the create bottom.
|
Classify thee given measures as lead or lag
: Discuss why it is sometimes difficult to classify these measures as lead or lag. Now, pick any two measures where you have difficulty explaining whether they are lead or lag, and explain when they would be lead and when they would be lag measures.
|
Determine the size of the foundation
: 1. A square foundation is shown in Figure P4.12. Use FS 5 6, and determine the size of the foundation. Use Prakash and Saran theory [Eq. (4.55)].
|
Create a windows form application project.
: After these two selections are made the user will click the Selection Complete button that will compute the total price of rental
|
In the past the standard deviation of weights of certain
: State the appropriate conclusion.Reject the null hypothesis, there is not significant evidence of an increase in variability.
|
Calculate xyz direct labor variances
: As judged by the information contained in the performance report, should the vice president be concerned about the company's labor variances? Why?
|
Determine the size of the foundation
: 1. For a square foundation that is B 3 B in plan, Df 5 2 m; vertical gross allowable load, Qall 5 3330 kN, g 5 16.5 kN/m3; f9 5 308; c9 5 0; and FS 5 4. Determine the size of the foundation. Use Eq. (4.26).
|
Compute the theoretical conversion cost per unit
: Compute the theoretical conversion cost per unit. Compute the applied conversion cost per unit (the amount of conversion cost actually assigned to the product).
|