Reference no: EM131388667
Assignment
1. Clearly state the movie selected, project identified, and the project manager in your cover page. Prepare a project plan for the project you identified in your Memo I. Use your judgment and imagination to complete the plan.
2 Create a priority matrix for the project identified and provide a justification for the priority matrix you created.
3 Using MS Project, create a coded WBS for the project you identified. In your coded WBS, also include Duration, Predecessors, ES, EF, LS, LF, Slack.
4 Using MS Project, create a Gantt Chart for the project you identified. Clearly show your critical path in your Gantt Chart. Gantt Chart must be a stand-alone document, i.e. selfexplanatory (think about what does this mean).
5 Using MS Project, create a network diagram for the project you identified. Clearly show your critical path. The network diagram must be a stand-alone document, i.e. selfexplanatory.
6 Identify at least five risks from the project identified and complete the following: a. A Risk Assessment Form for the risks identified b. A Risk Response Matrix for the risks identified.
7 Technical writing and professionalism in document presentation. This includes, but not limited to, the use of proper written English, use print function from MS Project, no handwriting on printed document, legible, presented in a professional manner, document does not cause physical injury on your TA etc.
Note: Your project plan must be precise and detail enough where another project manager can replicate the project based on your project plan without any issue.
How do organization values drive the culture
: mgt600- Provide the vision, mission, and values of the organization. How do organization values drive the culture? What is the culture you intend to build, or exists, today? What is your competitive advantage?
|
Find the period of the satellite
: What is the ratio of the periods? From the facts that the moon has a period of about 27 days and a radius of orbit 240,000 mi and that the radius of the earth is 4000 mi, find the period of the satellite.
|
What support will the working group need
: Explain how the strategies will be adopted, implemented, and maintained in the community. What additional resources may be needed to fully diffuse the intervention? Describe the planned activities in relation to the attributes or characteristics o..
|
Find the probability of the assembly having a clearance fit
: Consider given Figure, which shows the assembly of a shaft in a bearing.- Find the probability of the assembly having a clearance fit.
|
Create a priority matrix for the project identified
: Create a priority matrix for the project identified and provide a justification for the priority matrix you created. Create a Gantt Chart for the project you identified. Clearly show your critical path in your Gantt Chart.
|
What is the impulse if the collision is elastic
: Calculate the impulse that one ball exerts on the other in the completely inelastic head-on collision of two 500-g balls, each of which is approaching the other with speed 100 cm/s.
|
What proportion of the assemblies will be acceptable
: The specifications for a shaft diameter in an assembly are 5± 0.03 cm, and those for the hole are 5.25 ±0.08 cm. If the assembly is to have a clearance of 0.18 ±0.05 cm, what proportion of the assemblies will be acceptable?
|
What proportion of assemblies will not meet stipulation
: What proportion of the assemblies will be nonconforming, assuming a normal distribution of the piston and cylinder diameters? Clearances more than 0.8 cm are undesirable. What proportion of the assemblies will not meet this stipulation?
|
Describe primary components of strategic management process
: MGT498- Describe the primary components of a strategic management process, and indicate why a strategic management process is needed for a company.
|