Create a multi-level work breakdown structure

Assignment Help Business Management
Reference no: EM131057311

This assignment consists of two (2) parts: a project schedule, and a written response. You must submit both parts as separate files for the completion of this assignment. Label each file name according to the part of the assignment it is written for.

Part A: Project Schedule

In Assignment, you developed a project plan. Now, using the information from your project proposal, create a multi-level work breakdown structure (WBS) and detailed project schedule.

Your project must include the following criteria:

The project must consist of at least twenty-five (25) tasks.

Each task must contain a start date, a finish date, and have main staffing and non-staffing resources assigned.

Assume that your work activities are completed during normal weekdays (no weekend work) under normal conditions (8 hours per day).

In terms of holidays, you can assume no work will be done the following days: New Year's Day, President's Day, Good Friday, Good Monday, Friday before Memorial Day, Memorial Day, the business day before Independence Day, Independence Day, the Friday before Labor Day, Labor Day, the day before Thanksgiving Day, Thanksgiving Day, Black Friday (day after Thanksgiving), the business day before Christmas, Christmas Day, the business day after Christmas Day, and New Year's Eve.

Part B: Written Response

Write a one to two (1-2) page response in which you:

Analyze your project in terms of project completion, critical path, and slack / float. Specifically, be sure to answer the following:
When will the project be completed?

What is the critical path for the project?

How much slack / float is in your project? What activities have the greatest slack / float?

Summarize the recommendations or improvements you would make to your project schedule. Specifically, be sure to answer the following:

Identify the top three (3) activities that you believe could impact the project completion date.

What additional activities would you add to this project to make it more complete, from a project management viewpoint?

Reference no: EM131057311

Questions Cloud

Write a formal cogent analytical argument : Please choose a company for your final project. The final project will be graded on two main elements First, your ability to write a formal cogent analytical argument in support of your position. Second, the quality and strength of the "Facts" tha..
Broad classification of living organisms : Define term cell as used in the cell physiology and give two broad classification of living organisms
Determine the maximum velocity leaving the nozzles : An axial-flow turbine stage is to be designed for free-vortex conditions at exit from the nozzle row and for zero swirl at exit from the rotor.
Identify the context and background for your problem : Consider the topic of your research essay. Develop an argument that PROPOSES a plan for the reader.  Use the links below for outlines for the paper, but basically:
Create a multi-level work breakdown structure : In Assignment, you developed a project plan. Now, using the information from your project proposal, create a multi-level work breakdown structure (WBS) and detailed project schedule
How does segregation impact poverty concentration : How does segregation impact poverty concentration? What is a ghetto? Differentiate between institutional and jobless ghettos. Why did ghetto conditions change? How are they perpetuated?
Major macronutrient category : Describe the following for each major macronutrient category (protein, carbohydrates, fats):
Emotional responses to stories about poor people : 1.   Where did Jackley first hear about the poor? 2.   What frustrated and confused Jackley about the idea of "the poor"?
What is the variation of work done with radius : Determine the rotor flow inlet and outlet angles at a radius of 0.24 m given that the hubtip ratio is 0.5. Assume that at the mean radius the axial velocity remained unchanged (cx1= cx2 at r = 0.3 m). (Note: ΔW is the specific work and Ut the blad..

Reviews

Write a Review

Business Management Questions & Answers

  Caselet on michael porter’s value chain management

The assignment in management is a two part assignment dealing 1.Theory of function of management. 2. Operations and Controlling.

  Mountain man brewing company

Mountain Man Brewing, a family owned business where Chris Prangel, the son of the president joins. Due to increase in the preference for light beer drinkers, Chris Prangel wants to introduce light beer version in Mountain Man. An analysis into the la..

  Mountain man brewing company

Mountain Man Brewing, a family owned business where Chris Prangel, the son of the president joins. An analysis into the launch of Mountain Man Light over the present Mountain Man Lager.

  Analysis of the case using the doing ethics technique

Analysis of the case using the Doing Ethics Technique (DET). Analysis of the ethical issue(s) from the perspective of an ICT professional, using the ACS Code of  Conduct and properly relating clauses from the ACS Code of Conduct to the ethical issue.

  Affiliations and partnerships

Affiliations and partnerships are frequently used to reach a larger local audience? Which options stand to avail for the Hotel manager and what problems do these pose.

  Innovation-friendly regulations

What influence (if any) can organizations exercise to encourage ‘innovation-friendly' regulations?

  Effect of regional and corporate cultural issues

Present your findings as a group powerpoint with an audio file. In addition individually write up your own conclusions as to the effects of regional cultural issues on the corporate organisational culture of this multinational company as it conducts ..

  Structure of business plan

This assignment shows a structure of business plan. The task is to write a business plane about a Diet Shop.

  Identify the purposes of different types of organisations

Identify the purposes of different types of organisations.

  Entrepreneur case study for analysis

Entrepreneur Case Study for Analysis. Analyze Robin Wolaner's suitability to be an entrepreneur

  Forecasting and business analysis

This problem requires you to apply your cross-sectional analysis skills to a real cross-sectional data set with the goal of answering a specific research question.

  Educational instructional leadership

Prepare a major handout on the key principles of instructional leadership

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd