Create a cash flow analysis giving the project spending

Assignment Help Civil Engineering
Reference no: EM133123740

Question 1. Discuss among your team of each of your skills. You may use a table to record the skills. These are more like the soft skills for executing the following tasks like develop project plan; resources planning, drawings and writing specifications; produce cost plan; safety statement etc. These are mainly the project planning skills on this assignment. (team)

Question 2. Write down the roles and responsibilities of each other. This can be a team lead; a cost planner, a programmer, a contract administrator. For each role, write 4 to 6 duties and give some examples if needed. (team)
(M1) talk about allocating the different roles in a typical project team. For examples, you may need a project lead, a cost planner, a time programmer, a health and safety officer or an engineer etc. (team)
(D1). Justify why the allocation result of the roles and responsibilities. Justify who is doing what. Accept some people may want to do some wanted roles but the project needs the roles to be done by other people and not necessary match everyone wants. Of course, you shall pick the expert to do the best job suitable for him or her. (team)

Question 3. Use project management software like Microsoft project or Power project etc to make a timed bar chart for all activities to be done here. This is for later use to insert the resources. (team)

Question 4. Input the labour man days and any plant or tools onto the timed bar charts that this project needs to do for each activity. It is better to be done by a member of your team who knows how to do this. (team)
(M2) Look at the project plan and show the milestone dates and any possible risks. For example, milestone dates are dates that are important and critical. Like start and finish dates, In this case, please remember your activities are mainly the activity no. 1 to 9 or plus the Ms and Ds tasks. (team)

Question 5. One of your team members need to produce the drawings and the project specifications. Drawings should be using A4 or A3. Better to use AutoCAD's and the specifications should use the normal specification for a project. See notes or web page. (project)

Question 6. Use the project management software to make out a cost plan or create a cash flow analysis giving the project spending and the dates of spending. For some advanced students, you can use the cost curve additionally to your cost plan with time and cash flow situations. (project)

Question 7. Write out the health and safety statement or safety plan or policy. Giving safety guidelines and health guidelines. Make references to other statement that you have seen before but not copying directly. (project)
(M3) Evaluate the means with the BIM that can give better efficiency in providing the tender documentation. This is because the BIM can allow you to see better inside the building so that you can give better insight when writing the contract document like quantities or hidden details that you might missed if you do not use the BIM. (project)
(D2) Critically evaluate the relationships between project planning and tender documentation. The project planning can be done with the tender documentation indicating the constraints. But they are interacting. Highlighting different means which tender information responds to project planning. Here the project planning is the front end planning. The tender information will need to spell out the planning work required. (project)

Question 8. Take continual review of the project team members own Work, recording this throughout the project. Keep a diary of the work in progress. Take pictures if needed. (team)

Question 9. Evaluate their own working practices in relationship to that of other members of your team and compare or state the good and not so good things. Identifying areas of good practices for lessons learned. (team)

(M4) Evaluate their own personality in relationship to your working practices. That can be someone if fast and someone is caring details. Some may be following up actions and some may be always looking for the future. Some can be tactical and some may be strategic. (team)

(D3) Evaluate the success of a project by thinking individual and group practices and compare to their assigned roles and personality. You can use a table to make it more easily to be read. (team)

Reference no: EM133123740

Questions Cloud

Internal rate of return of the proposed investment : Calculate the internal rate of return of the proposed investment and comment on your findings.
What is the time premium paid for option : Problem. Victoria Company is selling for $94 and has the following six-month options outstanding.
What is the estimated cost of inventory shortage : Unsold goods out on consignment with selling price of 1M are in the hands of a consignee. What is the estimated cost of inventory shortage
Estimate the value of perth international : If the subsidiaries remit their revenues to the Australian parent at the end of each year, estimate the value of Perth international
Create a cash flow analysis giving the project spending : Develop project plan; resources planning, drawings and writing specifications; produce cost plan; safety statement etc - Justify why the allocation result
How much is retained earnings - appropriated at year-end : Net income is P1,500,000 and cash dividends declared is P352,500. How much is Retained earnings - appropriated at year-end
Analysis Of Electrical And Lifetime Performance : The Analysis Of Electrical And Lifetime Performance Of Lithium-Sulphur Battery - Analyze and interpret 7 CV images! Which one has the best performance
How can companies balance earnings pressures : In most cases it is more than just pressure because local governments have mandated higher minimum wages. How can companies balance earnings pressures
What is the apr : If the loan has a 5-year term over a 30- year amortization period, what is the APR assuming an initial loan of $4 million

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determine the channel slope s under the assumption

For a triangular channel of z=2 side slopes tha tcarries a discharge of 100 cfs at a depth of 5 ft, determine the channel slope S under the assumption that normal flow exists and that n equals 0.022.

  Determine the final volume of the gas in meter cube

A piston-cylinder assembly containing 1/4 kg of a gas undergoes a constant pressure process at 5 bar beginning with a specific volume of 20 m^3/kg. for the gas in the system the work is -15 kj. determine the final volume of the gas in m^3

  Determine the acceleration of the initially stationary

Determine the acceleration of the initially stationary 20-kg body when the 50-N force P is applied as shown. The small wheels at B are ideal, and the feet at A are small.

  Identify who is producing the wind loading calculations

Integrated Design Exercise - Provide evidence that your group has started the structural drawings for the example structure. Plan at every level showing

  What are the setup and hold times of 8''2

An edge-triggered flip-flop 8‘1 has setup and hold times of t, and th, respectively. The flip-flop 8'2 is constructed by adding a delay of td to the data input of 8'1. (Consider a delay to be a buffer with tpd = tcd = td.) what are the setup and ho..

  Representative field vane shear test at a site

Estimate the maximum centric load that a 2-m-square footing can support using CSM. The minimum factor of safety is 1.25 and the settlement should not exceed 25 mm. Assume v' = 0.35.

  Determine the variation of jet are with elevation

A stream of liquid moving as low speed leaves a nozzle pointed directly downward. The velocity may be considered uniform across the nozzle exit and the effects of friction may be ignored.

  Estimate the hourly production and unit cost of rock

Estimate the hourly production and unit cost of rock excavation by drilling and basting. The rock is limestone having a seismic velocity of 6000 ft/s. Trial blasting indicates that 3" holes drilled in 12 ft.

  Determine what is the rate of leakage in gallons per day

An in-ground swimming pool may have a leak. The 30-ft by 10-ft by 5-ft (depth) pool is filled on June 1. On June 13, a hose, flowing at a rate of 10 gallons per minute, is used to add water to the pool. The hose is turned off after 1 hour.

  What is the mean velocity relative to the cylinder wall of

A sphere of diameter 300mm fakks axially down a 305mm diameter vertical cylinder which is closed at its lower end and contains water. if the sphere falls at a speed of 150mm/s

  Find the uniform flow depth of concrete trapezoidal channel

Find the uniform flow depth (in feet) of a concrete trapezoidal channel with a bottom width of 30 ft. and side slopes of 2:1. The channel is laid at a slope of 0.05% and carries a design discharge of 1000 cfs.

  Calculate the maximum deflection of the beam

A 30" beam with a cross section of 1" wide and 2" tall is supported by a pin at point A on its left end, and a roller at point B on its right end. A 300 lb force is exerted 10" to the right of A (20" left from B)

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd