Cost-pricing-scheduling and control

Assignment Help Other Subject
Reference no: EM13194535

Cost, Pricing, Scheduling, and Control 

Cost Estimation 

Suppose that you have been asked to price an 8-month external project. Direct labor is estimated at $100,000 per month, plus a 100% overhead rate. The total labor termination liability in any particular month includes, of course, the total amount (100%) of the current month's labor expense (including overhead) plus (with the exception of the final month) a penalty of 80% of the following month's labor expense (including overhead). So the total accumulated labor liability at any point during the project is equal to the accumulated labor expenses accrued up to the previous month, plus the current month's labor termination liability. There are two material resources. Material A will cost $100,000, payable 30 days net. This material is needed at the end of the 5th month and has a 4-month lead time. The termination liability on Material A in any particular month is as follows: 
1-30 days after ordering: 25% 
31-60 days after ordering: 50% 
>60 days until the expense is paid in full: 100% after the expense has been paid in full, there is no additional termination liability. 
Material B will cost $200,000, payable on delivery. This material is needed at the end of the 7th month and has a 3-month lead time. The termination liability on Material B in any particular month is as follows: 
1-30 days after ordering: 50% 
>30 days until the expense is paid in full: 100% after the expense has been paid in full, there is no additional termination liability. 
To simplify the analysis, assume that all 8 months identically contain exactly 30 days. Also assume that any payment or liability that occurs on a month boundary should be assigned to the month that falls before this boundary (not the one that comes after the boundary). Assume that you can neglect profits. Assume that the customer has agreed to buy this project and pay, at the end of each month, 100% of all costs incurred during that month. Assume that the project is guaranteed to execute precisely on schedule. 
1. Based on this information, how much burdened labor cost would the customer be obligated to pay at the end of the 1st month (assuming that the project had not been terminated)? 
a. $150,000 
b. $0 
c. $200,000 
d. $160,000 

2. For the same project, how much additional labor termination liability would be added to the burdened labor cost to calculate the customer's total labor liability at the end of the 1st month if the customer should decide to terminate the project at that point?
a. $200,000 
b. $50,000 
c. $0 
d. $160,000 PROJ522 - Cost, Pricing, Scheduling, and Control 

3. For the same project, what is the customer's total accumulated labor liability at the end of the 2nd month if the customer should decide to terminate the project at that point? (Hint: They would be responsible for covering 2 months of burdened labor costs incurred plus one month of additional termination liability.) 
a. $720,000 
b. $560,000 
c. $320,000 
d. $400,000 

4. For the same project, what is the customer's total accumulated labor liability at the end of the 3rd month if the customer should decide to terminate the project at that point? (Hint: They would be responsible for covering 3 months of burdened labor costs incurred plus one month of additional termination liability.) 
a. $600,000 
b. $480,000 
c. $560,000 
d. $760,000 

5. For the same project, what is the customer's total accumulated material liability at the end of the 4th month if the customer should decide to terminate the project at that point? 
a. $200,000 
b. $25,000 
c. $75,000 
d. $100,000

6. For the same project, what is the customer's total accumulated material liability at the end of the 5th month if the customer should decide to terminate the project at that point? 
a. $300,000 
b. $0 
c. $200,000 
d. $100,000

7. For the same project, what is the customer's total accumulated liability (including both material and labor) at the end of the 7th month if the customer should decide to terminate the project at that point? 
a. $1,560,000 
b. $1,860,000 
c. $1,700,000 
d. $1,900,000

8. For the same project, what is the customer's total accumulated liability (including both material and labor) at the end of the 8thmonth if the customer should decide to terminate the project at that point? 
a. $1,760,000 
b. $2,060,000 
c. $1,900,000 
d. $1,600,000.

Reference no: EM13194535

Questions Cloud

What are the effects of long-term sleep reduction : Describe a situation in which a person does not get enough sleep. How would it affect mood, behavior, and cognitive and motor skills? What are the effects of long-term sleep reduction? Briefly describe common sleeping disorders and possible drug reme..
Urbanization-paving-channelizing and straightening : How does the urbanization (paving, channelizing, straightening etc.) affect the magnitude of both, RUNOFF and INFILTRATION, in a moderately-sized, previously forested drainage basin?
Environmental forces-social-economic-technological : What trends in the environmental forces (social, economic, technological, competitive, and regulatory) work for and/or work against Rollerblade's potential growth in the 21st century?
What do you do to re-energize and regain focus : Always that you have tuned into cues from your body that show diminished focus or energy when you are working on a project, reading, or studying. How did you sense it? What do you do to re-energize and regain focus?
Cost-pricing-scheduling and control : Suppose that you have been asked to price an 8-month external project. Direct labor is estimated at $100,000 per month, plus a 100% overhead rate.
Happiness-satisfaction and lack of loneliness in singlehood : Describe several factors that are related to happiness, satisfaction, and lack of loneliness in singlehood.
Price elasticity of demand is calculated as : Price elasticity of demand is calculated as
Operational definition of employee involvement : Need to Develope an operational definition of employee involvement. Be sure to include a citation or a url for your source.
Developing an operational definition of a team : Begin this lesson by developing an operational definition of a team. Be sure to include a citation or a url to your source. Please include citation and with 100 words or less.

Reviews

Write a Review

Other Subject Questions & Answers

  Cross-cultural opportunities and conflicts in canada

Short Paper on Cross-cultural Opportunities and Conflicts in Canada.

  Sociology theory questions

Sociology are very fundamental in nature. Role strain and role constraint speak about the duties and responsibilities of the roles of people in society or in a group. A short theory about Darwin and Moths is also answered.

  A book review on unfaithful angels

This review will help the reader understand the social work profession through different concepts giving the glimpse of why the social work profession might have drifted away from its original purpose of serving the poor.

  Disorder paper: schizophrenia

Schizophrenia does not really have just one single cause. It is a possibility that this disorder could be inherited but not all doctors are sure.

  Individual assignment: two models handout and rubric

Individual Assignment : Two Models Handout and Rubric,    This paper will allow you to understand and evaluate two vastly different organizational models and to effectively communicate their differences.

  Developing strategic intent for toyota

The following report includes the description about the organization, its strategies, industry analysis in which it operates and its position in the industry.

  Gasoline powered passenger vehicles

In this study, we examine how gasoline price volatility and income of the consumers impacts consumer's demand for gasoline.

  An aspect of poverty in canada

Economics thesis undergrad 4th year paper to write. it should be about 22 pages in length, literature review, economic analysis and then data or cost benefit analysis.

  Ngn customer satisfaction qos indicator for 3g services

The paper aims to highlight the global trends in countries and regions where 3G has already been introduced and propose an implementation plan to the telecom operators of developing countries.

  Prepare a power point presentation

Prepare the power point presentation for the case: Santa Fe Independent School District

  Information literacy is important in this environment

Information literacy is critically important in this contemporary environment

  Associative property of multiplication

Write a definition for associative property of multiplication.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd