A storage tank is purged continuously with a stream of nitrogen. The purge stream leaving the tank is saturated with the product stored in the tank. A major part of the product lost in the purge could be recovered by installing a scrubbing tower to absorb the product in a solvent. The solution from the tower could be fed to a stage in the production process, and the product and solvent recovered without significant additional cost. A preliminary design of the purge recovery system has been made. It would consist of the following:

1. A small tower 0.5 m diameter, 4.0 m high, packed with 25 mm ceramic saddles, packed height 3.0 m 2. A small storage tank for the solution, 5 m3 capacity

3. The necessary pipe work, pump, and instrumentation

All the equipment can be constructed from carbon steel. Using the following data, evaluate how long it would take for the cost savings to pay for the capital cost of installing the recovery system:

1. Cost of product $5 per lb

2. Cost of solvent $0.5 per lb

3. Additional solvent make-up 10 kg/d

4. Current loss of product 0.7 kg/h

5. Anticipated recovery of product 80%

6. Additional utility costs, negligible

Other operating costs will be insignificant.

Reference no: EM13884299

Questions Cloud

What is aggregate planning? why might it be important : What is aggregate planning? Why might it be important to the master production scheduler?
Is inventory an asset or a liability? how do we determine : Is inventory an asset or a liability? How do we determine if it is an asset or a liability?
Prepare an executive summary responding to board requests : Create a detailed letter that is suitable for publication in the local newspapers stating your position concerning the need to continue the level of high security at the airport. Include justifications for the work you and your staff are doing and..
Compute the actual correlation coefficient : Given the follow set of pairs of data: x. 6 3 10 11 15 and y. 50 80 45 70 60. Compute the actual correlation coefficient.
Continuously with a stream of nitrogen : A storage tank is purged continuously with a stream of nitrogen. The purge stream leaving the tank is saturated with the product stored in the tank.
Propylene over zeolite catalyst : Cunene is made by alkylation of benzene with propylene over zeolite catalyst. To maximize selectivity to desired products, several beds of catalyst are used inside the same reactor.
How does an mrp-ii system or an erp system help : How does an MRP-II system or an ERP system help a company be more successful in managing its business and achieving its strategic objectives? Relate this to actual situations of companies you are familiar with.
Physical properties of the fluid : The physical properties of the fluid are: density 875 kg/m3, viscosity 1.46 mN m-2 s. Also, determine the NPSH, at this flow rate, if the vapor pressure of the fluid at the pump suction is 25 kN/m2.
Designed for a hydrocracking process : A fixed-bed reactor is to be designed for a hydrocracking process. The reactor will treat 320,000 lb/hr of vacuum gas oil (specific gravity 0.85) in the presence hydrogen at 650 ºF, 2000 psig, 1.0 weight hourly space velocity (WHSV).

Reviews

Write a Review

Chemical Engineering Questions & Answers

  Determine the energy needed to quench a hot gas with water

Determine the energy needed to quench a hot gas with water, Assume we have a 100,000 cubic foot per minute gas (air) stream at 700 degrees F that goes to an air pollution control device

  Random substitution of chlorine atoms for hydrogen

High-density polyethylene may be chlorinated by inducing the random substitution of chlorine atoms for hydrogen.

  Calculate the work done in the isothermal reversibl

Calculate the work done in the isothermal reversible expansion of one mole of CH4 (g) from 1.00 dm3 to 10.00 dm3 at 300 K. Treat methane as a van der Waals gas. The van der Waals gas constants for methane are: a=2.3026 dm6⋅bar⋅mol-2 and b=0.043067 dm..

  Select a process variable

Select a process variable (pressure / temperature / level / flow) and conduct a literature survey to determine recent developments in process instrumentation field. Identify any one novel instrument and explain in detail the working of the instrument..

  Calculate the molar composition of the product stream

A process to produce 1000 kgmol/h acetaldehyde, ethane is fed to the reactor at 1500 kgmol/h and the fractional conversion is 0.8. The product stream contains 2 mol% CO2. Calculate the molar composition of the product stream and the fractional select..

  Equilibrium data for this system

Acetone is to be extracted from a solution in water, using 1,1,2-trichloroethane. The feed concentration is 45.0% w/w acetone. Determine the number of stages required to reduce the concentration of acetone to below 10%, using 32 kg of extraction-s..

  Descriptions of: indoor concrete maintenance chemicals

Descriptions of: indoor concrete maintenance chemicals used on indoor concrete flooring - high solids floor finish chemicals used on indoor concrete flooring

  In gas-shy-solid fluidization it is frequently common to

in gas-shy-solid fluidization it is frequently common to have a wide size distribution of particles present in the

  Where a and b are constants and r the interatomic

1. the potential energy between two atoms can be represented as

  Average total moisture content

A piece of hemlock wood measuring 15.15 x 14.8 x 0.75 cm is to be dried from the two large faces from an initial total moisture content of 90% to a final average total moisture content of lo%, with drying taking place in the falling-rate period wi..

  What safety regulations are most relevant to the issue

Give a description of the product and its physical and chemical properties, including a chemical structure drawing - Identify at least one company the produces your product and where the production facilities are located (city, country).

  Prepare the design and evaluation of a new chemical

prepare the design and evaluation of a new chemical manufacturing process.1 acetylation reactor2 separation of

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd