Reference no: EM132919983
Unit 6 Construction Information (Drawing, Detailing, Specification) - Higher National Certificate/Diploma in Construction and the Built Environment
Assignment - Construction Information Production
Learning Outcome 1: Evaluate different types of construction information in the context of diverse project types.
Learning Outcome 2: Develop construction drawings, details, schedules and specifications in support of a given construction project.
Learning Outcome 3: Interpret different types of construction information in order to explain a construction project.
Learning Outcome 4: Assess ways in which construction professionals collaborate in the production of construction information.
Assignment Brief
Your employer, a medium-sized general contractor, has been commissioned to design and build an office building. The design team within the company has prepared a set of outline design drawings, which provide general information about the proposed building, site and form.
You are tasked with the responsibility of preparing the construction information package that will allow the construction team to build the project. The package of information required includes the following:
• Site plan
• Floor plan
• Elevations
• Section/Details
• Door and window schedules
• Outline bill of quantities
• Schedule of works
Accompanying the construction information package, your employer wishes to understand your reasons for the drawings, specification and schedules that you have produced.
Scenario
You have been appointed to prepare an initial conceptual design and implementation report on an office building in a local industrial park near the expressway that links an international airport in the UK, Heathrow to the specific.
The Client who is a private investor needs a five storey framed office building(s). The building frame provides the structure for a series of high specification office rooms and meeting rooms which are intended to be built in the south of England, around Heathrow Airport. The office block can be developed with steel or concrete or a combination of both.
LO1 Evaluate different types of construction information in the context of diverse project types TASK1
(a) Explain the use of construction information in the context of a project in general or based on the current scenario.
(b) Describe the different types of construction information and their uses. What type of construction information you will use for the current scenario and justify their use?
(c) Compare different types of construction information to identify their suitability in specific contexts (current scenario)
LO2 Develop construction drawings, details, schedules and specifications in support of a given construction project
Task 2
(a) Prepare a set of general arrangement drawings, selected details and door/window schedules. (Current scenario)
(b) Produce an outline bill of quantities. (Current scenario) (c)Compose a schedule of works. (Current scenario)
(d) Justify the use of specific types of construction information in Task 1 & Task 2 support of a given project. (For current scenario)
LO3 Interpret different types of construction information in order to explain a construction project Task 3
(a) Relate a set of construction drawings to a specification. (For current scenario)
(b) Evaluate construction drawings and details to identify errors and clashes.
(c) Critique a body of construction information, identifying errors and discrepancies.
(d) Propose corrections to construction drawings and specifications using industry standard forms of notation.
LO4 Assess ways in which construction professionals collaborate in the production of construction information
Attachment:- Construction Information Production.rar