Construction information production assignment

Assignment Help Civil Engineering
Reference no: EM132919983

Unit 6 Construction Information (Drawing, Detailing, Specification) - Higher National Certificate/Diploma in Construction and the Built Environment

Assignment - Construction Information Production

Learning Outcome 1: Evaluate different types of construction information in the context of diverse project types.
Learning Outcome 2: Develop construction drawings, details, schedules and specifications in support of a given construction project.
Learning Outcome 3: Interpret different types of construction information in order to explain a construction project.
Learning Outcome 4: Assess ways in which construction professionals collaborate in the production of construction information.

Assignment Brief

Your employer, a medium-sized general contractor, has been commissioned to design and build an office building. The design team within the company has prepared a set of outline design drawings, which provide general information about the proposed building, site and form.
You are tasked with the responsibility of preparing the construction information package that will allow the construction team to build the project. The package of information required includes the following:
• Site plan
• Floor plan
• Elevations
• Section/Details
• Door and window schedules
• Outline bill of quantities
• Schedule of works
Accompanying the construction information package, your employer wishes to understand your reasons for the drawings, specification and schedules that you have produced.

Scenario

You have been appointed to prepare an initial conceptual design and implementation report on an office building in a local industrial park near the expressway that links an international airport in the UK, Heathrow to the specific.
The Client who is a private investor needs a five storey framed office building(s). The building frame provides the structure for a series of high specification office rooms and meeting rooms which are intended to be built in the south of England, around Heathrow Airport. The office block can be developed with steel or concrete or a combination of both.

LO1 Evaluate different types of construction information in the context of diverse project types TASK1

(a) Explain the use of construction information in the context of a project in general or based on the current scenario.
(b) Describe the different types of construction information and their uses. What type of construction information you will use for the current scenario and justify their use?
(c) Compare different types of construction information to identify their suitability in specific contexts (current scenario)

LO2 Develop construction drawings, details, schedules and specifications in support of a given construction project
Task 2
(a) Prepare a set of general arrangement drawings, selected details and door/window schedules. (Current scenario)
(b) Produce an outline bill of quantities. (Current scenario) (c)Compose a schedule of works. (Current scenario)
(d) Justify the use of specific types of construction information in Task 1 & Task 2 support of a given project. (For current scenario)

LO3 Interpret different types of construction information in order to explain a construction project Task 3
(a) Relate a set of construction drawings to a specification. (For current scenario)
(b) Evaluate construction drawings and details to identify errors and clashes.
(c) Critique a body of construction information, identifying errors and discrepancies.
(d) Propose corrections to construction drawings and specifications using industry standard forms of notation.

LO4 Assess ways in which construction professionals collaborate in the production of construction information

Attachment:- Construction Information Production.rar

Reference no: EM132919983

Questions Cloud

What changes will make to present accounting system : Given your expected business growth, what changes will you make to your present accounting system, based on your learning from the current lesson?
What is the appropriate method of depreciation to properly : Fly High Airlines acquires a new aircraft. What is the most appropriate method of depreciation to properly match revenues and expenses?
Explain what is a balanced scorecard : Explain what is a balanced scorecard? State its three strategies to outperform competitors. State the 5 steps to implement ABC system
What amount will abc report as adjusted cash balance : Ban recorded the check amount properly at $510. What amount will ABC report as its adjusted cash balance in the general ledger at April 30, 2020?
Construction information production assignment : Construction Information Production Assignment - Evaluate different types of construction information in the context of diverse project types
List five of the analytical platforms : List five of the analytical platforms. Discuss any of 3 in details. List and Discuss different types of users in future analytical architectures.
Provide journal entries to account for the revaluation : An item of depreciable machinery is acquired on 1 July. Discuss when do you think should a revaluation increment be included as part of profit or loss?
What the purchase of the new equipment : The new equipment costs the company P900,000. The company uses 16% cost of capital. What the purchase of the new equipment will result to net present value
What the company return on total assets for the year : Brachlan Company's net income last year was $80,000 and its interest expense was $20,000. What the company return on total assets for the year

Reviews

Write a Review

Civil Engineering Questions & Answers

  Engineering ethics and ethical issue

what is the engineering ethics course where to write about any engineering ethical case and discuss the ethical issue?

  Engineering ethics and concept and cases

what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?

  Transportation and management

In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.

  Supporting Investment Promotion: ERNST & YOUNG

Ernst & young is currently providing support to various sectors. In this regards it was felt that if this report is able to document good practices currently being adopted or planned in ceramic sector.

  Personalized Cancer Therapy-A step forward

Cancer is the uncontrolled growth of abnormal cells in the body resulting in tumours that can be benign or malignant (cancerous cells). A proper treatment is necessary to fight with this serious disease.

  Discuss the different environmental companies

Discuss the different agencies, institutes, centers, different environmental companies that are active in UAE.

  Develop a simple urban constructed wetland design

Develop a simple urban constructed wetland design.

  Evaluate company performance in relation to GRI standards

Evaluate company performance in relation to GRI standards and comment on Stigler's theory.

  Water system design

Determine the corresponding error in the computed discharge

  Hydraulic behaviour in open channel

Describe how test flumes and associated equipment are used to assess and confirm hydraulic behaviour in open channel

  Write a paper on steel sustainability

Write a paper on steel sustainability.

  Writing case study about bridge collapse

Writing case study about bridge collapse

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd