Constructing a new building in a bare land

Assignment Help Civil Engineering
Reference no: EM132095442

Instructions:

This assignment is based on an Engineering design scenario. Please read carefully before attempting the assignment. This assignment is to test your skills on using the basic tools of Revit 2018. Some guidelines are included in this brief to assist you with the assignment.

You have been commissioned by XYZ Land Development Company to model a Single Storey Commercial Structural Building. Your client (XYZ Land Development Company) has provided you the details of the location of the proposed building.

The building is proposed to be built at 11 Nobilo Road Kumeu. The building footprint will be decided by you assuming the Auckland Council Guideline to be 70% impervious area and 30% pervious area when constructing a new building in a bare land.

Hint Use Auckland Council Geomaps to find out the area of the bare land

The deliverables to be produced for the client include:
• 3x Isometric views
• 2x Plan views
• 2x Elevational Views
• 2x Cross-section views
• 4x Detail Views
• 1x Schedule of Quantities

All the above deliverables will be included in 5 sheets as detailed below

A. Sheet 1- Three Isometric views:

Scale the view to fit on the page - you may have to use a "custom' scale -shown any text on the actual sheet rather that in the 3d view, this way if you change the orientaion of the view the text will stay horizontal and you can just move it to suit.

2 out of the 3 views will focus on the whole buidling in two different angles. The other view will focus on the underground storage room including the staircase,railings etc.

B. Sheet 2 - General Arrangement showing Floor and Roof Plan and 2 Elevations: Scale 1:100

These views will call up only the main elements and have general descriptions.

C. Sheet 3 - Two Cross sections: 1:50

Show more detail here ie call up all the structural member sizes and give more dimensions - do you 'call outs' for your details on these sections.

D. Sheet 4 - Four Details: 1:10

Add all the information required to completly describe the item being detailed.
- The slab edge thickening - add reinforcing (modeled) - you decide the sizes -typically YR 12 or YR16 stirrups with YD 16 or 20 along.
- The Purlin cleat - use the cleat family you losded in class fully dimension all items -holes sizes etc. - just place it once- 2 views fully detailed.
- The connection plate- detail a 2 bolt connection plate
- The Base plate - all dimensions - hole sizes. Need 2 views (Side & Plan/ Top view)

E. Sheet 5 - Schedule
- have a look at all the options available and include only the applicable items.

Guides and hints
These guidelines show one way that you can use to complete your assignment, you do not have to follow this method exactly, use other methods if you wish to complete the assignment

Start from the plan view `Level 1'
- set out the grids
- draw the floor slab and the slab thickening
- place the main columns on a grid
- place the 2 section marks

On section 1
establish all levels
- complete the portal by cutting to reference planes
- place the mezzanine beams
group (you will need to go back to the plan to copy it to the other grids) create a work plane to place the purlins on later

On Section 2
- add 'lean to Annex' rafters

Go to level 2 plan
- add the purlins ( you must set the work plane first)

On level 1
(This step can be done at last and some guidelines will be provided in class to complete this section)
Create the underground storage room including stairs, railings etc. place the concrete wall panels around the building- keep the top of the panels at about 100mm below the columns.

This will complete all the main framing elements.

Now go to the different views, sections and callouts and add appropriate text and dimensions. Finally create the schedule of quantities.

These are some indicative drawing to help you with modeling the structure

1955_3D.jpg

3D View

Reference no: EM132095442

Questions Cloud

Report meets organisational requirements for content : How can you ensure the report meets organisational requirements for content, format and level of detail?
Record the given transactions using transaction analysis : Assuming the role of an accountant, your new client Suzie Maye needs help in setting up basic accounting practices for her business.
Managing inherent enterprise risks through stakeholder : Describe the stakeholder management approach of the organization before the issues arose.
Perform a gap analysis for riordan manufacturing : Perform a Gap Analysis for Riordan Manufacturing. Be sure to incorporate appropriate citations from your readings.
Constructing a new building in a bare land : MG6005 CIVIL ENGINEERING DETAILING AND MODELLING - this assignment is to test your skills on using the basic tools of Revit 2018
Determining the consistent change process : What evidences are there to support that Lincoln was acting consciously with reference to a consistent change process
Market development and share development : 1. What do we learn from this report in terms of iPad's market development and share development?
Prepare a sales budget for the la babycakes store : Prepare a sales budget for the LA Babycakes store for the 4th quarter of 2016. Present the number of units, sales price, and total sales for each month.
Foundation of a culture of diversity : Ethical Leadership at Cardinal IG: The Foundation of a Culture of Diversity, book: business ethics (Ferrell Fraedrich Frerrell)

Reviews

Write a Review

Civil Engineering Questions & Answers

  Find magnitude of load that is necessary to produce changes

An alloy has a yield strength of 41 ksi, a tensile strength of 57 ksi, and an elastic modulus of 16 X 10^6 psi. A cylindrical specimen of this alloy 0.5 in in diameter and 10 in long is stressed in tension and found to elongate 0.3 in.

  Determine the boundary work done during this process

A piston-cylinder device initially contains 0.07 m3 of nitrogen gas at 130 kPa and 120°C. The nitrogen is now expanded poly-tropically to a state of 100 kPa and 100°C

  Early project cost and schedule analyses

Identify which project stakeholders participated and the nature of their participation - providing models, using models and the personal benefits.

  Write a short presentation on a drainage project

Write a short presentation on a Drainage project, How you will do it , what program you will use.

  Determine the final temperature of the water

The partition is now removed, and the water expands to fill the entire tank. Determine the final temperature of the water and the volume of the tank for a final pressure of 10 kPa

  Find the percentage error over the band

find the percentage error over the band in making this approximation.

  What nominal annual interest rate effective annual interest

A store charges 1.25 % interest per month in credit purchases. This is equivalent to: what nominal annual interest rate, effective annual interest rate, and effective monthly interest rate?

  Determine the internal normal force at point e in

Battered piles are used on many construction projects as a permanent part of the element being constructed. Does this construction method have any play in the construction of a temporary earth retention system?

  Determine the maximum speed of the train

A typical motorcycle emits about 20 g of CO per mile. What volume of CO would a 5-mile trip produce after the gas coolsto 25°C (at 1 atm) and per meter of distance traveled, what volume of air could be polluted to the air quality standard of 9ppm?

  Calculate the cost per kg charged by these two suppliers

Our laboratory plans to use one, 10-liter tank of refrigerant 134a every week. So off you go to check the cost of fill-ups at the two possible suppliers. At Chem Mart, the filled tank is returned to you at 10 bar and 90 C for $10.00.

  Determine the overturning moment of silt and water

Assuming that silt is equivalent to a liquid having a density of 1760 kg/m3, determine the overturning moment of silt and water about point A.

  How many paces should the same surveyor count

He counts 43 paces while walking from point A to point B. What is the distance between A and B?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd