Construct the work breakdown structure

Assignment Help Basic Computer Science
Reference no: EM13187875

The WBFK Transport Company operates throughout mainland Australia. The company specialize in fast delivery of pallet-loads of goods from one WBFK depot to another WBFK depot. It does not do pickups at a customers premises nor does it deliver door to door. It deals exclusively in Pallet size loads and is not involved in small parcel transport unless a customer with a small parcel is prepared to pay a full pallet price.

The business is thiving and has grown 60% in the last two years with 40% growth expected this financial year.

Currently there are depots in each State and Territory Capitals and additional depots as follows :

Three depots in Queensland located in Townsville, Mt Isa and the Gold Coast
Four depots in NSW located at Grafton, Dubbo, Newcastle and Woolongong
Four depots in Victoria at Geelong, Albury-Wodonga, Bendigo and Mildura
One depot in South Australia at Port Augusta
Two depots in WA at Freemantle and Broome
One depot at Alice Spring.

The business was originally started to carry freight between Melbourne and Sydney and has grown in answer to demand, rather than in a planned way. No attention has been paid to the efficiency of the business nor to analyzing costs. All freight from any depot outside a capital city is sent to that capital city then forwarded to the capital city in the state where it is addressed. Currently there is no direct transport from Queensland to any other State except through Sydney and all Ex-Sydney freight to States other than Queensland goes via Melbourne. Similarly, all Northern Territory freight is shipped via South Australia.

Your Project

You have been engaged as a project manager to scope a project which will analyze the freight currently handled by WPFK Transport.

The broad project brief is to find what volume of freight (number of pallets) goes between each depot.

It has been decided to survey each depot for two (2) two-monthly periods over the next eight months, once in November/December(very busy period) and again in March/April (quiet period).

The Company suspect they could make considerable savings and reduce delivery dates by initiating new routes. For example from Brisbane directly to Adelaide, via Dubbo and Mildura with drop-offs and pickups from interim depots along the way.

Your Project will define the Scope, construct the Work Breakdown Structure, define all of the activities and sequence these, schedule the project and then resource and budget the project using Microsoft Office Project.

Reference no: EM13187875

Questions Cloud

How many popsicles will be sold per day : at a price of $1 each, 100 popsicles are sold per day in the perpetually hot town of Rostin. Consider the elasticity of supply. In the short run, a price increase from $1 to $2 is unit-elastic (Es = 1.0). So how many popsicles will be sold each da..
What length and width should the rectangle have : a rectangle is bounded by the x- and y- axes and the graph of y=6-x/2. What length and width should the rectangle have so that its area is a maximum?
Show the possibility of declining average costs : Give a numerical example to show that a monopolist's marginal revenue can be upward-sloping over part of its range. Hint: The price on the demand curve is the producer's average revenue. Think of the graphic that showed the possibility of declining..
Find the regular price : The price of a television set on sale is $360. This is two thirds of the regular price. Find the regular price.
Construct the work breakdown structure : Construct the Work Breakdown Structure, define all of the activities and sequence these, schedule the project and then resource and budget the project using Microsoft Office Project.
What does best rentals charge per day and per mile : Best rentals charges a daily fee plua a mileage fee for renting its cars. Barney was charged $87 for 3 days and 300 miles wheile Mary was charged $154 for 5 days and 600 miles. What does Best Rentals charge per day and per mile?
Determine the necessary dimmensions : A cylinder is to be constructed so that it will have a minimum surface area while holding 128 pi cubic feet of gasoline. Determine the necessary dimmensions. Be sure to verify your answers indeed guarantee that a minimization has been accomplished..
Explain compounds a and b react to give a single product : Compounds A and B react to give a single product, C. Write the rate law for each of the following cases and determine the units of the rate constant by using the units M for concentration and s for time.
Process of performing a successful job analysis : What are the steps in the process of performing a successful job analysis? Describe each step and the role of the employee and supervisor in this process. Discuss what impact, if any, the advent of the computer has on this process.

Reviews

Write a Review

Basic Computer Science Questions & Answers

  Identifies the cost of computer

identifies the cost of computer components to configure a computer system (including all peripheral devices where needed) for use in one of the following four situations:

  Input devices

Compare how the gestures data is generated and represented for interpretation in each of the following input devices. In your comparison, consider the data formats (radio waves, electrical signal, sound, etc.), device drivers, operating systems suppo..

  Cores on computer systems

Assignment : Cores on Computer Systems:  Differentiate between multiprocessor systems and many-core systems in terms of power efficiency, cost benefit analysis, instructions processing efficiency, and packaging form factors.

  Prepare an annual budget in an excel spreadsheet

Prepare working solutions in Excel that will manage the annual budget

  Write a research paper in relation to a software design

Research paper in relation to a Software Design related topic

  Describe the forest, domain, ou, and trust configuration

Describe the forest, domain, OU, and trust configuration for Bluesky. Include a chart or diagram of the current configuration. Currently Bluesky has a single domain and default OU structure.

  Construct a truth table for the boolean expression

Construct a truth table for the Boolean expressions ABC + A'B'C' ABC + AB'C' + A'B'C' A(BC' + B'C)

  Evaluate the cost of materials

Evaluate the cost of materials

  The marie simulator

Depending on how comfortable you are with using the MARIE simulator after reading

  What is the main advantage of using master pages

What is the main advantage of using master pages. Explain the purpose and advantage of using styles.

  Describe the three fundamental models of distributed systems

Explain the two approaches to packet delivery by the network layer in Distributed Systems. Describe the three fundamental models of Distributed Systems

  Distinguish between caching and buffering

Distinguish between caching and buffering The failure model defines the ways in which failure may occur in order to provide an understanding of the effects of failure. Give one type of failure with a brief description of the failure

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd