Question: Workers at a packaging operation shovels a granular product from a large pile into sacks that are then sealed and placed on pallets for shipping. A sequence of 25 subgroups each consisting of the weights of 5 sacks has been recorded as follows:

 

Observations

Subgroup #

Sack 1

Sack 2

Sack 3

Sack 4

Sack 5

1

35.4

35.6

34.8

34.7

34.8

2

36

35.6

34.9

34.8

35.9

3

35.2

35

35

35.4

35.1

4

34.8

35.8

35.2

35

34.9

5

34.2

35

36.1

34.9

35.1

6

36

35

35.2

34.8

34.9

7

36.1

34.9

34.5

35

35.1

8

35.1

35

35.6

34.9

36.2

9

35

35.6

36.1

34.8

35.6

10

35.4

35.8

36

34.2

36

11

35.2

35.3

35.2

35.9

34.8

12

35.9

36

35.1

35.1

35.6

13

35.2

35.6

35

34.9

35

14

35.2

35.6

35.8

35

35.1

15

34.9

34.8

35

35.2

34.9

16

35.2

35.3

35.2

35.6

35.1

17

35.6

35.8

35.2

35.4

34.9

18

35.2

35.6

35.4

35.6

35.2

19

34.7

34.9

35.6

35.2

35

20

35

35.1

35.6

35

35.1

21

35.6

35

35.8

35.2

34.6

22

34.9

35.1

35.6

35

35.2

23

35.9

36

35.2

36

35.2

24

35.2

35.1

35.4

34.9

35.1

25

35.2

35.2

35.1

35.6

34.9

a- What is the appropriate control chart that can be used by the quality engineer in this case?

b- Determine the control limits (show your calculations)

c- Construct the appropriate control chart for the data above using MINITAB.

d- Is the process in-control? If not, when does the out-of-control behavior occur?

e- If the process is found to be out of control, drop the out-of-control points and use MINITAB to re-construct the control chart.

f-  Is the process now in-control? If not, what to do next?

Reference no: EM13537602

Questions Cloud

Explain the frequency of radiation it uses to communicate : Many people have 900 MHz phones where this refers to the frequency of radiation it uses to communicate. What energy does this correspond to (in joules/photon)
Single valence electron of a rubidium atom : The ground state for a single valence electron of a rubidium atom (Z=37) is 5s and its energy is –4.18 eV. The valence electron is excited into the 5g state. We want to determine the energy of this 5g electron. Assume that the wave function for th..
Equation relating energy levels of the harmonic oscillator : A lithium atom, mass 1.17 x 10-26 kg, is vibrating with simple harmonic motion in a crystal lattice, where the force constant is 71.0 N/m. Write the equation relating the energy levels of the harmonic oscillator to the quantities given.
When does the out-of-control behavior occur : What is the appropriate control chart that can be used by the quality engineer and determine the control limits (show your calculations)
Construct the appropriate control chart : What is the appropriate control chart that can be used by the quality engineer in this case, determine the control limits and construct the appropriate control chart for the data above using MINITAB.
Explain solution is cloudy after precipitation and heating : If the solution is cloudy after precipitation and heating, what does this indicate. Can the solution be filtered at this point
Determine the centerline and control limits : Determine the centerline, determine the control limits, Use MINITAB to develop the appropriate control chart and are there any indications of lack of control
Evaluate the agno3 needed to precipitate : If a 400 mg sample is assumed to be pure NaCl, calculate the millimeters of 0.1M AgNo3 needed to precipitate it completely
Explain the movable plunger on a syringe : Because of the movable plunger on a syringe, the gas inside the syringe can be held at a constant pressure of 1.00 atm while allowing the volume of the gas to increase or decrease.

Reviews

Write a Review

Project Management Questions & Answers

  Project planning-execution and closure

Find current trends in macro and microeconomics and critically examine market structures, consumer behavior, production costs, and international trade.

  Case studynbspthe royal childrens hospital education

case studynbspthe royal childrens hospital education institute ipad projectnbspthe royal childrens hospital rch

  Management related training documentation

Make project management related training documentation - Describe each of the phases of the project management process and its related knowledge areas. List the major activities in each phase.

  Consider at least three different quality assurance bodies

Appraise a non-technical reader the different types of quality assurance that are available. As part of your appraisal you consider at least three different quality assurance bodies.

  Concept of change management process in a project

Concept of Change Management Process in a Project - Explain the concept of the change management process within a project.

  Discussing project schedule and its next steps

Then, you would like to schedule an emergency meeting with her and the other marketing department managers to discuss the project schedule and next steps.

  Negotiating project work

Say the first team member has adopted a competing style while the other prefers to take a collaborative style for this conflict resolution and what is your opinion on how this negotiation will end

  Business-related project planchoose a project you all agree

business-related project planchoose a project you all agree on. try to choose a project that is business-related.

  Lost output resulting from scheduled maintenance

How could production make up for lost output resulting from scheduled maintenance?

  Choose one of the topic out of those 11 topics the topic

choose one of the topic out of those 11 topics. the topic and reserach should be perfect on all areas.write a report of

  Delegate responsibility for tasks to others

Do you have to delegate responsibility for tasks to others? What are some of the difficulties you face while trying to delegate responsibility?

  Examination of change projectpresent three key elements

examination of change projectpresent three key elements which should be explored prior to any change plan being

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd