Constraint and the feasible region

Assignment Help Engineering Mathematics
Reference no: EM13962629

Max 8X + 7Y
s.t. 15X + 4Y < 75
10X + 7Y < 70
X + Y < 8
X, Y > 0

a. Use a graph to show each constraint and the feasible region.

b. Identify the optimal solution point on your graph.What are the values of X and Y at the optimal solution?

c. What is the optimal value of the objective function?

Reference no: EM13962629

Questions Cloud

Top-down cost estimating technique : What is the difference between Top-down cost estimating technique and Bottom-up estimating technique? Which one of them is time-intensive and expensive to develop?
Cost performance index and schedule performance index : Assume you have completed three months of the project. The BAC was $200 000 for this six month project. Also assume the following: PV = $120,000 EV = $100,000 AC = $90,000 a) What is the cost variance, schedule variance, cost performance index (CPI),..
How does it fit with the author''s goals for the proposal : In Listening for the Silence, analyze the action proposed by the author, and how it is supported. Specifically, what does he want the target audience to do, and how does he show that this is a good idea?
Prepare rough order of magnitude and budgetary : Give examples of when you would prepare rough order of magnitude (ROM), budgetary, and definitive cost estimates for a project providing 100 new laptops for students to borrow on campus. Use the following techniques for creating a cost estimate for t..
Constraint and the feasible region : Use a graph to show each constraint and the feasible region. Identify the optimal solution point on your graph.What are the values of X and Y at the optimal solution?
Responsible for generating reliable financial reporting : An organization’s internal environment is responsible for generating reliable financial reporting and complying with laws and regulations. Internal business process improvement methods establish best practices and strengthen corporate governance and ..
Data collection methodology and anticipated results : Creating business intelligence PDF regarding creating a company wide dashboard of results. Seeking information pertaining to the Solution functionality, Data collection methodology, Anticipated results, Limitations of the BI solution, Lessons learned
Explain the activity variances : Prepare a flexible budget performance report that shows both activity variances and revenue and spending variances for the pizzeria for October.
Problem regarding the transportation system : A company which manufactures product in five plants ships locally using its own transportation system, but has orders which must be sent to locations too far to be serviced by the local fleet.

Reviews

Write a Review

Engineering Mathematics Questions & Answers

  State the appropriate hypotheses for significance test

State the appropriate hypotheses for your significance test. Use the sample results to compute the test statistic and the p-value.

  For this assignment use regression to complete the

for this assignment use regression to complete the assignment belowuse information from the modular background readings

  Unit sphere centered

Problem 1: If D is the unit sphere centered at (0, 0, 0), evaluate

  How many observations are there

QUESTION 1: Did you double check that you are using the correct data set? QUESTION 2: How many observations are there?

  Data represents the remission time in weeks

1. There is a new drug that is used to treat leukemia. The following data represents the remission time in weeks for a random sample of 21 patients using the drug.

  What aspects of research questions

How would you select appropriate statistical tests to analyze research data? What aspects of research questions or data types are relevant considerations in choosing your tests?

  Problem regarding the integer programming problem

Solve the integer programming model for the below problem.  For this problem, solve the integer programming model by using QM for Windows.

  You can solve this part a after read network a consider the

you can solve this part a after read network a consider the following electrical network and corresponding oriented

  Simple linear regression analysis

1. Use the following results obtained from a simple linear regression analysis with 15 observations.

  What is labview

What is LabVIEW and How to make basic Electrical Projects in LabVIEW? How Load Characteristics of a Self-excited DC shunt Generator in LabVIEW works

  Stationary heat-conduction problem

1. The stationary heat-conduction problem is governed by Poisson's equation (in 2D Cartesian coordinates):

  Find two rational numbers with denominators nine and fifteen

Find two rational numbers with denominators 9 and 15, respectively, whose sum is equal to 10/225 or explain why it is not possible to do so.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd