Consider the following hypothetical scenario

Assignment Help Database Management System
Reference no: EM13946105

Consider the following hypothetical scenario. A hypothetical company has grown substantially using an acquisition strategy. As new companies were acquired, new systems that those companies were using were also acquired. At this point, this company has "one of each" of the core, production system (this could be an ERP, HR/Finance, manufacturing, or any other enterprise-level system.) It is clear to everyone that over time following this strategy created many problems and inefficiencies.

The new CIO and his biker buddy the COO decide to form a Steering Committee to clean up the mess. They involve the key decision makers from their respective organizations and get the commitment from Senior VP of Marketing. The CIO and the COO make it clear that they are the executive co-sponsors of this effort.

The Steering Committee commissions the feasibility study and determines that consolidation of the systems will result in significant operational, support, and licensing savings. It determines that many positions will no longer be needed. It also determines that none of the existing systems are year-2000 (Y2K) compliant.

Meanwhile, the Steering Committee participants spread the word around to their rank and file, and although systems consolidation will mean that positions will be lost, most people feel that "it was about time someone did something about the mess."

The Steering Committee next commissions a market survey to determine commercial availability of a replacement system. Three months are budgeted for the market survey. A consultant is brought in to draft a SRS based on the composite features of the existing systems, new requirements, and Y2K compliance requirements. Working closely with the Operations staff and Information Systems staff, and consulting with the Marketing, the consultant develops the SRS and a request for proposal (RFP). RFP is fielded, responses evaluated, a vendor selected, and a contract negotiated. The project plan for the systems consolidation and replacement is organized into several phases roughly approximating the lines of business. The overall project plan budgets nine months and is scheduled for completion with about three months to spare before the clock strikes midnight on December 31, 1999.

The project is off to a slow start, but the co-sponsors personally "drag" some of the reluctant decision makers to the now regular weekly Steering Committee meetings. Actually, the two sponsors participate in all Steering Committee meetings to ensure that issues are identified, defined, and addressed, and that the necessary resources are made available. Many, many problems are encountered; too numerous to list here. The problems range from the vendor misrepresenting some of the capabilities of the system, lack of certain required functionality, performance issues, platform instability, and on and on...The Steering Committee organizes many swat teams and slowly all issues are overcome: some through fixes and some through workarounds. Almost everyone within the company is aware of this project, and many of the staff are invited by the Steering Committee at one time or another to provide their input to solving some of the issues and problems. Although there appears to be some communication redundancy, overall everyone is "kept in the loop" well and timely.

So how does this hypothetical story end? The project goes over budget and beyond the schedule, but not by much. The expected efficiencies are obtained, although it took a little longer than planned. Some positions are eliminated, but there were no surprises and many were able to transfer elsewhere within the company. Everyone who participated in the project learned a lot.

Would you say that this was a well-managed or poorly-managed system implementation? Identify and discuss at least three specific elements that make it a well-managed or poorly-managed implementation. Be sure to explain why and be specific.

Reference no: EM13946105

Questions Cloud

Define and briefly discuss corporate strategic planning. : Identify and briefly describe the four phases involved in managing a project.
Would this sampling method be considered a cluster sample : Twenty-three faculty members volunteered. Each faculty member gave the survey to all the students in one course of their choosing. Would this sampling method be considered a cluster sample? Why or why not?
How would you describe the shape of the distribution : Draw a relative frequency histogram to describe the distribution of penny ages. How would you describe the shape of the distribution?
Thermal entrance length associated with the highest reynolds : Determine the tube length L that meets a design requirement that the tube be twice as long as the thermal entrance length associated with the high- est Reynolds number of interest. Evaluate water properties at 305 K.
Consider the following hypothetical scenario : A hypothetical company has grown substantially using an acquisition strategy. As new companies were acquired, new systems that those companies were using were also acquired.
What probability that customer arrive within next 0.5 minute : On average 2.4 customers per minute arrive at an airline check-in desk during the peak period. Assume that the distribution of arrivals is Poisson. Then T the time between 2 arrivals will be exponential. What is the probability that a customer will..
Surface heat flux for tube diameters : Consider air flowing in a small-diameter steel tube. Graph the Nusselt number associated with fully devel- oped laminar flow with  constant  surface  heat  flux for tube diameters ranging from 1 µ,m D 1 mm.
What are the most important aspects to monitor your servers : We can all agree that it's important to monitor your servers' performance over time. But, what are the most important aspects to monitor and how often? As a network administrator, how do you best use this information for future planning?
Discuss deleting items from binary search trees : If the item to be deleted is contained in a node with one child, the reference in the parent node is set to reference the child node and the node containing the data item is deleted. This causes the child node to take the place of the deleted node..

Reviews

Write a Review

Database Management System Questions & Answers

  Knowledge and data warehousing

Design a dimensional model for analysing Purchases for Adventure Works Cycles and implement it as cubes using SQL Server Analysis Services. The AdventureWorks OLTP sample database is the data source for you BI analysis.

  Design a database schema

Design a Database schema

  Entity-relationship diagram

Create an entity-relationship diagram and design accompanying table layout using sound relational modeling practices and concepts.

  Implement a database of courses and students for a school

Implement a database of courses and students for a school.

  Prepare the e-r diagram for the movie database

Energy in the home, personal energy use and home energy efficiency and Efficient use of ‘waste' heat and renewable heat sources

  Design relation schemas for the entire database

Design relation schemas for the entire database.

  Prepare the relational schema for database

Prepare the relational schema for database

  Data modeling and normalization

Data Modeling and Normalization

  Use cases perform a requirements analysis for the case study

Use Cases Perform a requirements analysis for the Case Study

  Knowledge and data warehousing

Knowledge and Data Warehousing

  Stack and queue data structure

Identify and explain the differences between a stack and a queue data structure

  Practice on topic of normalization

Practice on topic of Normalization

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd