Traffic Impact Assessment

Conduct a Traffic Impact Assessment for a proposed development as shown in the following figures, located on North Creek Road with frontage to Henderson Lane and Hutley Drive, Lennox Head. The development comprises of 149 lots plus an integrated housing facility which has 30 lots, resulting in total of 179 residential lots.

2165_map.jpg

The site is currently predominantly cleared land. It is proposed to realign North Creek Road through the subject site, with Hutley Drive extended to intersect with North Creek Road via a four leg roundabout. Henderson Lane will also be realigned to intersect with North Creek Road via a new T junction, to the west of Stoneyhurst Drive. The proposed site layout, shown below, is also provided

2491_map1.jpg

It is assumed that the development will be completed in 2020. A future planning horizon of 10 years from the date of completion should be considered. The impact of the development at the development completion year and at the planning horizon should be assessed.

For each scenario, analyse the operation of the two intersections, Hutley Drive/New North Creek Rd and The Coast Rd/Ballina St/New North Creek Rd, in the AM and PM peak hour. Note that the Hutley Drive/New North Creek Rd is only required to be analysed for the scenarios with the development, as this roundabout will only be constructed as part of the development. If the operation of any existing or proposed intersection is unacceptable, recommendations to achieve acceptable operation (which have been tested in SIDRA) should be included. Thus the report should include details of the form and lane configurations of the intersections at Hutley Drive/New North Creek Rd and The Coast Rd/Ballina St/New North Creek Rd intersections that should be constructed.

The following assumptions apply to the proposed development traffic:

- A directional distribution of development traffic to/from north or south of 50% and 50% respectively. The directional distributions described apply to AM and PM peak volumes, both entering and exiting the development.

- For the development traffic to/from the north, 60% are assumed to use The Coast Rd (i.e. left turn on The Coast Rd for exiting traffic), and 40% assumed to use Ballina Rd (i.e. through movement onto Ballina Rd for exiting traffic).

- For the development traffic to/from the south, 25% are assumed exit the development to the south (i.e. not use the to use The Coast Rd/Ballina St/New North Creek Rd intersection) and utilise Skennars Head Rd, while the remaining 75% are assumed to use The Coast Rd/Ballina St/New North Creek Rd intersection (i.e. left turn onto The Coast Rd for exiting traffic).

- Assume a split for the trip ends for the development of 20% in and 80% out in the AM peak and a 70% in and 30% out in the PM peak.
The following assumptions apply to the background traffic:

- An annual growth of 2% for the existing (background) traffic.

- When distributing the background (existing) volumes at the new Hutley Drive/New North Creek Rd intersection, assume 1/3 from the east (i.e. via the new Hutley Rd connection) and 2/3 from the south (i.e. via the New North Creek Rd).
The following are provided to enable the assessment:

- RTA Guide to Traffic Generating Developments

- AM and PM peak hour turning movements counts for the current The Coast Road/North Creek Road/Ballina Street intersection conducted in March 2013

- The proposed site plan for the development

Traffic Impact Assessment. The report must be more than 10 pages in length (excluding appendices) with an appropriate report structure, including SIDRA results, title pages, tables of contents, references, conclusions and recommendations etc. All assumptions should be well documented in the report, and the traffic volumes for each scenario must be included. Appropriate inclusions and structures of Traffic Impact Assessments were discussed in lectures, with a sample Traffic Impact Assessment provided for information. Use this as a guide only not as a definitive template.

The SIDRA INTERSECTION files containing the clearly identified scenarios used in the report must also be submitted

Reference no: EM131067267

Questions Cloud

Determine the final velocity of a car : Determine the final velocity of a car that starts from rest and moves at an acceleration of 6m/s/s for 10 seconds.
How do the definitions reflect their sources : How is the carrying capacity of the earth related to land degradation and agricultural productivity?
What is the mayo clinic mission : What is the Mayo Clinic's mission? Who are its target customers and what is its relationship with these customers?
Importance of subcultural segmentation to marketers : In 2-3 paragraphs, discuss the importance of subcultural segmentation to marketers of food products. Identify a food product for which the marketing mix should be regionalized.
Conduct traffic impact assessment for a proposed development : Conduct a Traffic Impact Assessment for a proposed development as shown in the following figures, located on North Creek Road with frontage to Henderson Lane and Hutley Drive, Lennox Head.
American customer satisfaction index : Berman and Evans reference the American Customer Satisfaction Index in Table 20-3 of the textbook. Go to the ACSI website at www.theacsi.org and explore the website for a few minutes.
Developing a retail and promotion strategy : Identify and define the high-level elements of a retail promotional mix. Discuss the role that each plays in a retail promotional mix and how changes in technology are affecting them.
Comprehensive market plan : 1. Based on your comprehensive market research, and strategy and brand design, role out a comprehensive market plan for two new markets that infatuate the identified target market, build lifestyle enrichment, and brand recognition. Include:
Shareholders equity category of diddlysquat company : a. Declared a 15% stock dividend to common shareholders on January 15. At the time of the dividend, the common shares were selling for S30 per share. The stock dividend was to be issued to shareholders on February 14, 2015.

Reviews

Write a Review

Other Engineering Questions & Answers

  Determine the maximum speed of the e

Consider a nominally spherical Escherichia coli bacterium that is of diameter D = 2µm. The bacterium is in a water-based solution at 3rC containing a nutrient which is characterized by a binary diffusion coefficient of DAB = 0.7 x 10-9 m2/s and a ..

  Average radius of the pipe

Then they release a dye in the water at point A and find that it takes 88.8s to reach point B. What is the average radius of the pipe within thehill?

  Determine the maximum output current

A logic gate drives a load, which has a resistance of 1 kΩ and a capacitance of 20 pF. The printed circuit track connecting the gate to its load has an 40 pF capacitance to ground. The output changes state from 2.5 V to 0 V in 200 ps. Determine th..

  What would be stakeholders in a project

What would be stakeholders in a project

  An external entity relationship diagram

You have been retained as a Software Engineering consultant to the Muddy Springs Bottled Water Company. The company runs a water bottling plant which is currently undergoing dramatic improvements in equipment and capacity.

  Explain the operation of an encoder

Explain the operation of an encoder.

  Estimate the power spectrum of a signal

The Bartlett method is used to estimate the power spectrum of a signal from a sequence x(n) consisting of N = 2400 samples.

  How to measure the voltage across an ungrounded component

Explain how to measure the voltage across an ungrounded component. What setting of the SEC/DIV cowl will show one complete cycle in 10 divisions?

  Explain how the microstructures given had formed

Explain how the microstructures above had formed. Assume that the eutectoid diagram has the At C = 0%, A3 = 900°C coordinates.

  Formulate a binary linear programming model

Formulate a binary linear programming model for the above inspection planning problem by defining you decision variables and writing the objective and objective function and the constraints in terms of your decision variables. Combine everything t..

  How websites are blocked

How websites are blocked? And how its contents are identified?

  Where are fpgas can be used

Problem: Where are FPGAs can be used?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd