Conduct multiple linear regression analyses

Assignment Help Other Engineering
Reference no: EM131931970

Semester Design Project - Phase 2 ALL-LineX Superior Energy Performance

BACKGROUND

ALL-LineX produces "bucket" extendable arms for the telecommunications, electrical, and fiber optic businesses and are used by lineman that work on telephone/electrical poles. These units are very customized with some that are specifically designed for use in high voltage environments and require proper shielding and grounding precautions.

The plant manager, Sally Rider, has been tasked with implementing a corporate strategy to reduce their energy intensity by 10%/year for each of the next three years. Sally is quite skeptical of this goal and is frankly not all that interested in this effort since it's not part of her evaluation and bonus structure being comprised of costs, person-hours, quality, and delivery performance. She has asked you as the plant/industrial engineer to take responsibility for the effort.

Figure 1 gives an overall layout of the plant. There is a rather significant office area that is utilized 5-days/week from 7 am - 6 pm. There are occasional times when someone is working during the weekends or late at night and the lights and HVAC are adjusted to accommodate them. There is small warehouse area for raw materials and some replacement/repaired parts. This area is generally available at all times that the plant is in operation. There is a mechanical area where compressed air and other building facilities are located. The main area of the plant is operated 5-days/week for two 8-hour shifts. This is primarily some metal fabrication, testing, and assembly operations.

There is a paint line that consists of a WIP staging area, part loading/unloading staging, a 6- stage wash and part prep operation, a drying oven to dry parts, a manually operated paint powder spray booth, and a final cure oven. The paint line operates primarily 5-days per week, one shift per day, but at times they may be asked to extend their operation to a second shift or to the weekends during peak times.

Finally, there is a test location where scientists test and perform R&D on high voltage exposure to the bucket equipment (5-day work week 9-5). The high-voltage experiments operate sporadically over the 5-day week since this may impact electrical usage.

Because this is a union environment, the entire 300,000 sq. ft. facility is environmentally conditioned using 23 rooftop HVAC units.

427_figure.png

Superior Energy Performance:

As a young plant engineer, you've heard about companies that have participated in the Department of Energy's (DOE) Superior Energy Performance (SEP) program, and the corresponding ISO 50001 standard, that have recorded phenomenal improvement in energy performance. Measurement and verification of energy improvements is conducted by measuring "energy intensity." In general terms, "energy intensity is a measure of the energy efficiency of a nation's economy. It is calculated as units of energy per unit of GDP. High-energy intensities indicate a high price or cost of converting energy into GDP. Low energy intensity indicates a lower price or cost of converting energy into GDP." From an individual plant, energy intensity is a measure of the relative energy needed to produce a unit of goods sold.

Scope of Phase 2:

Phase 2 is primarily about constructing adequate multiple linear regression models for both electric usage and natural gas usage given the contextualized data from Phase 1 - including either elimination or approximation of up to four electric or gas data points based on feedback from Sally Ride's agent once the Phase 1 reports have been reviewed. The dataset should not include the last 6 months of data.

1. Using the "Correlation Analysis in JMP" document on eCampus, construct a correlation and covariance analysis of the following variables:

a. Electricity Usage

b. Natural Gas Usage

c. Sales (3-month Moving Average transformed data)

d. HDD

e. CDD

f. Total OSHA hours including Regular, OT, and Double OT

g. Total Regular-time OSHA hours

h. Total OT and Double OT hours

i. Total OT hours

j. Total Double OT hours

k. Repeat the correlation analysis using (a) - (e) but instead of items (f) - (j) use just the Paint line hours for items (f) - (j)

l. Repeat the correlation analysis using (a) - (e) but instead of items (f) - (j) use everything but the Paint line hours for items (f) - (j)

m. Repeat the correlation analysis using (a) - (e) but instead of items (f) - (j) use transformed variables for Paint line OT hours (x2) and Paintline Double OT hours (x2).

Using these correlation analyses, make recommendations about correlation and covariance of response and predictor variables for consideration of inclusion in the multiple linear regression analysis. Discuss the covariance of predictor variables and determine which variables will most likely result in problems with multi-collinearity.

2. Based on the results from part 1, conduct multiple linear regression analyses (see "Multiple Linear Regression for JMP" in eCampus) for both electric usage and natural gas usage using the predictor variables that would seem to make the most sense to include in the regression analyses - justify your inclusion of variables. Where it might make sense consider interaction effects as well as any squared variables. Run these regression analyses multiple times with different orders of effects and explain why these models might be different based on the correlation of the estimates.

3. Based on the results from parts 1 & 2 (including suitability for any interaction and squared effects), conduct two multiple linear regression analyses for both electric usage and natural gas usage using both a forward and backward stepwise regression analysis. Contrast the results from these two approaches and advocate for overall regression models for predicting electric and natural gas usages.

4. Conduct scatter plots of the residuals for both electrical and gas usage for the models advocated from part 3 and comment about the assumptions of constant variance and normality.

5. Construct 95% prediction intervals for new observations of the models from part 3 and then examine whether the data excluded from part 1 (last six months of data) fall within these intervals. Report on prediction errors of these 6 months and the suitability of the models for predicting future electric and natural gas usage going forward.

6. Using MMBTU as a common energy unit, determine the overall energy savings by using the Forecast Normalization method as described in the Superior Energy Performance M&V Protocol document.

Attachment:- Assignment Files.rar

Reference no: EM131931970

Questions Cloud

Assuming you are a healthcare strategist : Assuming you are a healthcare strategist. You have been hired to train and convince healthcare managers to deploy strategic planning principles and tools
Weaknesses of the mental health system : These videos only discuss the weaknesses of the mental health system in America. One man tried to get his son an appointment with a physiatrist
Describe a small business that you would like to start : Describe a small business that you would like to start or purchase. How did the companies allocate their funding last year?
Describe the characteristics of potential customers : Identify the physical attributes, customer benefits, and competitive advantages of the product (or service) to be offered by the organization.
Conduct multiple linear regression analyses : IENG 314 - Semester Design Project - Phase 2 ALL-LineX Superior Energy Performance. Based on the results from part 1, conduct multiple linear regression analyse
What is acetate debt-equity ratio : What is Acetate's debt-equity ratio? (Do not round intermediate calculations and round your final answer to 2 decimal places (e.g., 32.16).
Recommend working with preferred vendors : Some experts recommend working with preferred vendors even if their prices are higher than other vendors. Why do you think this is the case?
Find the average return and standard deviation of returns : Find the average return and standard deviation of returns over the past 10 years.
Transitioning to a continuous process : As your enterprise implements transitioning to a continuous process, what obstacles can they expect?

Reviews

len1931970

4/7/2018 12:44:14 AM

I need the Project done by JMP so the report should have everything from jmp . will provide JMP file after confirmation. Team members must individually complete the peer evaluation using the attached form within 36 hours of the submitted design project. The project report should address the requested data with explanation of efforts, the statistical approach to address each issue, and the graphs/plots to support your conclusions. The organization and presentation of the report represents this portion of the grade where quality and not quantity is of key importance.

Write a Review

Other Engineering Questions & Answers

  The traffic signal for the main street gets highest priority

The traffic signal for the main street gets highest priority because car are continuously present on the main street. Thus, the main street signal remains green by default.

  Characterization technology for nanomaterials

Calculate the reciprocal lattice of the body-centred cubic and Show that the reciprocal of the face-centred cubic (fcc) structure is itself a bcc structure.

  Obtain a primitive flow table for the circuit

Assume that the length of the train is less than two miles - Obtain a primitive flow table for the circuit and show that the flow table can be reduced to four rows.

  Using boolean algebra techniques

1) Which Boolean law is used to transform each of the following equations? a.    B + (D + E) = (B + D) + E

  Innovation and communication presentation

Innovation and Communication Presentation

  Write a program to store values the first block

Write a program to store 0 to 255 in the first block of the 24LC08B of your demo board and then, staying in an infinite loop, read out one value from 24LC08B.

  What extent were the cost overruns

Provide a comparison of the projects, what extent were the cost overruns and how were the overruns handled by the authorities.

  What are strategic risks

What are the processes for developing a new mine in Western Australia and what are strategic risks? How would you manage these risks?

  Determine the corresponding boolean expressions

1.  For the PROM realization shown below, determine the corresponding Boolean expressions for outputs f1, f2 and f3.

  Minimum required coefficient of static

A 30-kg uniform thin panel is placed in a truck with end A resting on a rough horizontal surface and end B supported by a smooth vertical surface. Knowing that the panel remains in the position shown, determine

  To implement the following boolean equation

(b)  Create a Vector Waveform File called prob_c4_1.vwf to test the operation of your design by showing the output waveform for all possible input conditions.

  Write and compile a program to toggle all the bits of porta

Test the operation of the ports of your Development board as follows. Write and compile a program to toggle all the bits of PORTA, and PORTB continuously by sending 55H and AAH to these ports.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd