Reference no: EM132366803 , Length: 25
Assignment
Your group is working as a consulting team, and are engaged by Denver Shirley from Sunshine State Bank to conduct a comprehensive process modelling project for their end-to-end business loan process, as described in Section 3.
You are expected to deliver the process models in the form of a detailed collaboration diagram, laid out over different levels of abstraction, which captures how each activity and/or step in the business loan process is conducted in the current situation. More specifically, you are required to:
• use BPMN 2.0 to specify the process models
• capture the three main perspectives (i.e. control-flow, data and resource perspectives) of the business loan process in the process models
• present the hierarchy of process models (i.e. a hierarchical view of the positioning of the process models at different levels of abstraction)
• present the modelling conventions you used for the models and explain them well
• provide an overview and explanation of all the assumptions made during the completion of this assignment
You need to produce a short report (at most 25 pages including everything).
Attachment:- Business Process Modelling.rar