Conduct a risk management plan for the installation

Assignment Help Project Management
Reference no: EM132066577 , Length: word count:5000

Objective:

Demonstrate the ability to apply knowledge of one aspect of project management (risk management) in a case study.

Tasks to be undertaken:

You have been approached to:

1. Research and select an appropriate technology to produce sanitary hot water for a small hotel (three floors, 20 guest rooms, one small kitchen) in Nairobi in Kenya using solar energy.

2. Conduct a risk management plan for the installation and operation of the selected system.

The contractor has asked you to provide a technical report including the following:

- Technical description of the solar energy system. Please include information about:
o Justification of the selection of the particular system
o Stages or components (including ancillary equipment, if appropriate)
o Potential dimensions of the system (e.g. capacity, volume of heated water, etc.)
o Basic explanation on how the systems work (e.g. solar input, temperature of the sanitary hot water, etc.)

Maximum length of the section: 1 page
- Describe any industry standards or legislation relevant in Kenya related to the installation and operation of this type of solar energy system (or regarding their inputs and/or outputs, if appropriate)

Maximum length of the section: half page
- Conduct a risk assessment for the installation and operation phases of the selected solar hot water technology. Include:
o Hazard identification (as comprehensive as possible, i.e. physical, mechanical, electrical, work practices, environmental, hazardous substances, handling, fire hazards, etc.)
o Risk rating (likelihood and severity) - justify your rating

Maximum length of the section: 2 pages
- Suggest risk mitigation measures for all hazards you identified in both phases
- Re-calculate the risk rating to demonstrate the minimisation of risks.

Maximum length: 2 pages
- Conclusions: summarise the main findings of your risk assessment and provide some design recommendations that could minimise the identified risks. For example, changes in the design of the selected technology, type of materials of its components, etc.

Maximum length: half page

Reference no: EM132066577

Questions Cloud

What is the cost of capital for issuance of preferred stock : After paying fees and costs, the firm realizes $2.89 per share issued. What is the cost of capital for this issuance of preferred stock?
Network interface encapsulates an arp : How does a computer on a LAN know whether an ethernet fram it receives from its network interface encapsulates an ARP
Determine the budgeted manufacturing overhead rate : The budgeted manufacturing overheads for the month were $60,000 and $64,000, Determine the budgeted manufacturing overhead rate for each department
Compute the price of american call option with strike : Compute the price of an American call option with strike K=110 and maturity T=.25 years.
Conduct a risk management plan for the installation : ENGD2010 Project Management - Conduct a risk management plan for the installation and operation of the selected system
Crystals is a major importer of crystal from prague : AUS Crystals is a major importer of crystal from Prague in the Czech Republic. hedge the euro’s position by purchasing futures,
What is the difference between correlation and causation : What is bias in data collection? Provide two examples of study bias (based on two publication citations from your proposed research review paper topic)
Review problem on environment analysis : Remember that your final project should be more than just copying and pasting your first three assignments together. You should make sure the sections flow.
What controls might be implemented to discourage : What controls might be implemented to discourage the routine overstatement of capital budgeting estimates by the division managers

Reviews

len2066577

7/26/2018 10:06:38 PM

References and some examples of where you can find information about the topics requested: Related to Risk management: Brown, N. (2015). “Risk Management”, lecture on week 16 (available in Blackboard) • Submit ALL sections as a single report (no longer than 5,000 words) • Upload the electronic copy in Blackboard – ENGD20-Y -> Module Information -> Coursework assessment -> Resit coursework_individual project

len2066577

7/26/2018 10:06:22 PM

DO: Use tables for comparative purposes. Use bullet points to bring out the key points. Material from sources should be properly referenced and a list of references given at the end of the document. Provide complete references for web pages (i.e. include author/organisation, title of the web page, web link and accessed date) Write the report in the past tense and the third person impersonal. DON’T: Use abbreviations which are not defined. Use unsubstantiated opinions Write in any form of phone texting language or spelling Use Wikipedia as your main source of information

Write a Review

Project Management Questions & Answers

  Create a project schedule and align resources

Create a project schedule and align resources, Analyze project schedule and resource allocation

  Managerial roles and gap analysis

Write a report on Managerial Roles and Gap Analysis

  Questionaire on project management

Questionaire on Project Management

  Describe the market growth rate for product

Describe the market growth rate for product and service.

  Prepare a work plan and project schedule - gantt chart

Design an online system for the human resources department to manage available job positions.

  Project risk management approach

How does a project risk management approach pro-vide an early warning signal for impending problems or issues

  Black-scholes options pricing model

Calculate the payoff and the profits for investments

  Describe the features or characteristics of product

Describe the features or characteristics of your product or service.

  Write paper on inventory management system

Write paper on Inventory Management System.

  Analysis of the overall project risk

Analysis of the overall project risk

  Investment and performance analysis

Evaluate the usefulness of ROCE

  Distribution strategy and project management

Distribution strategy and project management

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd