Concrete and formwork required quantity take-off

Assignment Help Civil Engineering
Reference no: EM132792179

Part A - Concrete & Formwork Required QUANTITY TAKE-OFF:

Bridge Pier and Footing - As per attached Drawings.
•Takeoff the 3 elements for the following bridge pier components:
1. Pier Footing,
2. Pier Column,
3. Pier Cap (Top).
•Misc Items to include Shear Key.
•Misc Items to exclude Rebar.
•Include the following Finishes:
1. Bearing Pad Surfaces (the complete top surface, not just the pads);
2. Concrete Sealing of ALL Exposed surfaces including 600mm below grade.
•Show all work on quantity take off sheets using proper order and numbering system as per class work.
*Hint: There is an extra piece of Formwork for the Pier Cap (Soffit or Deck)*

Part ‘B' - Concrete & Formwork PRICING:
Bridge Pier and Footing - As per Pricing Notes.
•Use the RECAP Sheet provided to complete,
•See attached Pricing Package,
•Show unit price calculations.

Attachment:- CVL_Ass.rar

Reference no: EM132792179

Questions Cloud

Recall time when you experienced winner curse : Recall a time when you experienced winner's curse. Perhaps you purchased something for what you thought was a great price but quickly
How a company investment in and utilization : Discuss how a company's investment in and utilization of "marketing segmentation" impacts its business plan and marketing strategies (and tactics).
Assess the influence of culture and social orientation : Assess the influence of culture and social orientation on ethical behavior and adherence to APA codes of conduct
What is the rate variance of the direct materials : Category Standard Inputs for 1 output Std. Cost per input. What is the rate variance of the direct materials
Concrete and formwork required quantity take-off : Show all work on quantity take off sheets using proper order and numbering system as per class work - Use the RECAP Sheet provided to complete
Swot analysis on apple : How would you match the organization's strengths to its opportunities? How would you convert the organization's weaknesses into strengths?
Evidence of the gene-by-environment interactions : Have you seen any of evidence of the gene-by-environment interactions in your own life?
Describe the concept of customer lifetime value : Describe the concept of customer lifetime value (CLV). Choose a b (CLV). Choose a business and show how you would go about developing a quantitative formulation
How new descriptors related to the diagnostic criteria : Discuss how new descriptors related to the diagnostic criteria in DSM-5 should be used when making a diagnosis (the added descriptors).

Reviews

Write a Review

Civil Engineering Questions & Answers

  Engineering ethics and ethical issue

what is the engineering ethics course where to write about any engineering ethical case and discuss the ethical issue?

  Engineering ethics and concept and cases

what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?

  Transportation and management

In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.

  Supporting Investment Promotion: ERNST & YOUNG

Ernst & young is currently providing support to various sectors. In this regards it was felt that if this report is able to document good practices currently being adopted or planned in ceramic sector.

  Personalized Cancer Therapy-A step forward

Cancer is the uncontrolled growth of abnormal cells in the body resulting in tumours that can be benign or malignant (cancerous cells). A proper treatment is necessary to fight with this serious disease.

  Discuss the different environmental companies

Discuss the different agencies, institutes, centers, different environmental companies that are active in UAE.

  Develop a simple urban constructed wetland design

Develop a simple urban constructed wetland design.

  Evaluate company performance in relation to GRI standards

Evaluate company performance in relation to GRI standards and comment on Stigler's theory.

  Water system design

Determine the corresponding error in the computed discharge

  Hydraulic behaviour in open channel

Describe how test flumes and associated equipment are used to assess and confirm hydraulic behaviour in open channel

  Write a paper on steel sustainability

Write a paper on steel sustainability.

  Writing case study about bridge collapse

Writing case study about bridge collapse

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd