Part A - Concrete & Formwork Required QUANTITY TAKE-OFF:
Bridge Pier and Footing - As per attached Drawings.•Takeoff the 3 elements for the following bridge pier components:1. Pier Footing,2. Pier Column,3. Pier Cap (Top).•Misc Items to include Shear Key.•Misc Items to exclude Rebar.•Include the following Finishes:1. Bearing Pad Surfaces (the complete top surface, not just the pads);2. Concrete Sealing of ALL Exposed surfaces including 600mm below grade.•Show all work on quantity take off sheets using proper order and numbering system as per class work.*Hint: There is an extra piece of Formwork for the Pier Cap (Soffit or Deck)*
Part ‘B' - Concrete & Formwork PRICING:Bridge Pier and Footing - As per Pricing Notes.•Use the RECAP Sheet provided to complete,•See attached Pricing Package,•Show unit price calculations.
Attachment:- CVL_Ass.rar
A round steel alloy bar with a diameter of 0.75 in and a gauge length of 3.0 in was subjected to tension, with the results shown in the accompanying table. using a computer spread sheet program, plot the stress-strain relationship. from the graph, de..
The 90-lb force is required to drag the 200-lb crate 60 ft up the rough inclined plane at constant velocity. If the force is removed when the crate reaches point B, and the crate is then released from rest
Water in the amount of 1 lb is contained in a rigid closed tank. Initially the water has a quality of 0.4 at a pressure of 10 lbf/in2. Through a stirrer, work is provided to the water in the tank until the pressure quadruples.
Find the rms value of a parabolic wave. Find the fraction of the total average power carried by the first three nonzero ac components in the Fourier series. Compare with the results found in Problem 13-40.
A sample of moist soil has a volume of 40.5 cc mass weight of 59.2 gms. After drying it has a mass weight of 48.3 grams. The specific gravity of the solids are 2.68.
A new concrete mix is being designed to provide adequate compressive strength for concrete blocks. The specification for a particular application calls for the blocks to have a mean compressive strength greater than 1350 kPa. A sample of 100 blocks i..
A vapor-compression refrigeration system, using Refrigerant 134a as the working fluid, has evaporator and condenser pressure of 1.4 bar and 12 bar, respectively. The refrigerant passes through each heat exchanger with a negligible pressure drop
At a distance of 20 km downstream of the plant, the river has an ultimate CBOD of 10 mg/L. The state has set an ultimate CBOD discharge limit for the treatment plant of 2000 kg/day.
a 50cm^3 sample of dry soil from an aquifer weighs 100g. when it is poured into a graduated cylinder, it displaces 35cm^3 of water. What is the porosity of the soil. What is the average density of the actual solids contained in the soil
The cost of running this fleet is $325/hr per truck. For a given contract, a total of 2,500 tons must be removed from one construction site and moved to another location 35 miles away.
In the labuiatogy, the density of the solids was found to be 2.66 Mg/n2, and the maximum and minimum void ratios were 0.62 and 0.44. respectively. Calculate the relative density of the sand in the field.
Air is expanded in a nozzle from a stagnation state of 2 MPa, 600 K, to a static pressure of 200 kPa. The mass flow rate through the nozzle is 5 kg/s. Assume the flow is reversible and adiabatic and determine the throat and exit areas for the nozz..
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd