Compute the total cost of the potential job

Assignment Help Managerial Accounting
Reference no: EM131172724

Newcastle Machining produces parts for the steel industry. It has 3 categories of overhead costs: machine operating costs, production-engineering and inspecting costs. The costs expected for these categories for the coming year are as follows (note K represents '000s):

Machining

$435K

Production-engineering

 215K

Inspecting

150K

Total

800K

The plant currently uses machine hours to apply overhead. Expected capacity is 100K machine hours. Tom, the plant manager, has been asked to submit a bid on a potential job. He provides you with the following data for this job:

Direct materials

$8K

Direct labour

$12K

Overhead

$?

Number of inspections

1

Number of machine hours

2K

Production-engineering hours

10

Tom has been told that other firms will be competing for this job as well. Most of his competitors are using the ABC overhead allocation method. He wants to compare his bid using his existing and ABC approaches. He estimates that there will be 6K inspections, and 10Kproduction-engineering hours consumed in the plant next year.

Required. Round off all rates etc to two decimal places:

1. Compute the total cost of the potential job using machine hours to assign overhead. Assume that the bid price is based on full manufacturing cost plus 25% mark up. What is Tom's bid price?

2. Compute the total cost of the job using the number of inspections to assign inspection costs, production-engineering hours to assign engineering costs, and machine hours to assign machining costs. Assume the same bid pricing approach as in (1): what is Tom's bid price?

3. Which approach (1 or 2 above) do you think better reflects the real cost of the job? Explain in full: you must apply the relevant theoretical concepts to the case-facts provided. You cannot state the theoretical concepts alone, without relating it to the case-facts.

4. The production manager suggested that inspection hours rather number of inspections would provide a better cost assignment for jobs. The plant can carry out 12K inspection hours per year. The job in question should consume 60 inspection hours. Calculate the effect of this change on the job's bid price. Explain why inspection hours is a better or worse driver than number of inspections.

5. See rubric at the end of the assignment: it shows howQ.5 will be assessed.
5.i) What is the hierarchy of overhead costs and activities?

Use your own words to explain the elements of the hierarchy - do notmerely reproduce direct quotes from the notes given in the lecture questions handout, or any textbook.

5.ii) How should the hierarchy be used to allocate overhead costs? How will the hierarchy assist management to control overhead costs?

5.iii) Hospitals have high overhead costs and use casemix principles to allocate and control administrative and medical overhead costs. Explain in full if overhead costs in hospitals could better be managed if the hierarchy of costs and activities were used to allocate the overhead costs of hospitals?

Verified Expert

Reference no: EM131172724

Questions Cloud

Do you think the project should be accepted : Define payback period. Assume the company has a P/B (payback) policy of not accepting projects with life of over 3 years. Do you think the project should be accepted? Why?
Describe how the economic theories deepened your thinking : Briefly summarize and describe how the economic theories and principles you have studied in this course have deepened your thinking about economic behavior.
The determinants of productivity consider simple economy : The determinants of productivity Consider a simple economy whose only industry is fishing. In this industry, productivity—the amount of goods and services a worker can produce per hour—is measured by the number of fish one fisherman catches per hour.
Compute the volume flow rate through the meter : Compute the volume flow rate through the meter that will cause the mercury to flow into the throat. Note that for a given manometer deflection h, the left side will move down h/ 2 and the right side would rise h/2.
Compute the total cost of the potential job : Compute the total cost of the potential job using machine hours to assign overhead. Assume that the bid price is based on full manufacturing cost plus 25% mark up. What is Tom's bid price?
Analyze implications of changes in project scheduling : Determine the expected completion time and the variance for each activity, Determine the total project completion time and the critical path for the project and Determine Early Start (ES), Early Finish (EF), Late Start (LS), and slack for each activi..
Two products-safe cars and dangerous cars : Theres two products: "safe cars" and "dangerous cars"
Llc for breach of fiduciary duty : Discuss whether Acme is liable to Zappa and the other members of the LLC for breach of fiduciary duty.
How individual economic decisions affect the market failure : Explain how individual economic decisions affect this market failure and how economic principles can be applied to modify those individual decisions to help correct the market failure.

Reviews

Write a Review

Managerial Accounting Questions & Answers

  Manage budgets and financial plans

Explain the budgeting process and its importance to a business, identifying the components of different budgets, forecast estimates for inclusion in the budgets.

  Prepare a retained earnings statement

Prepare a retained earnings statement for the year and Prepare a stockholders' equity section of given case.

  Prepare a master budget for the three-month period

Prepare a master budget for the three-month period.

  Construct the companys direct labor budget

Construct the company's direct labor budget for the upcoming fiscal year, assuming that the direct labor workforce is adjusted each quarter to match the number of hours required to produce the forecasted number of units produced.

  Evaluate the predetermined overhead rate

Evaluate the Predetermined Overhead Rate

  Determine the company''s bid

Determine the company's bid if activity-based costing is used and the bid is based upon full manufacturing cost plus 30 percent.

  Compute the pool rates for the different activities

Complete the schedule to compute the pool rates for the different activities.

  Prepare Company financial statements

Prepare Company financial statements

  Prepare an analysis of terracycles

This individual assignment is based on the TerraCycle Inc.

  Discuss the ethical issues

Discuss the ethical issues

  Political resources in emerging markets

Calculate the GDP in Income Approach  and Expenditure Approach

  Management accounting - ehsan electronics company

A new plant accountant suggested that the company may be able to assign support costs to products more accurately by using an activity based costing system that relies on a separate rate for each manufacturing activity that causes support costs.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd