Precision Manufacturing Inc. (PMI) makes two types of industrial component parts-the EX300 and the TX500. It annually produces 60,000 units of EX300 and 12,500 units of TX500. The company's conventional cost system allocates manufacturing overhead to products using a plantwide overhead rate and direct labor dollars as the allocation base. Additional information relating to the company's two product lines is shown below: EX300 TX500 Total Direct materials $366,325 $162,550 $528,875 Direct labor $120,000 $42,500 $162,500 The company is considering implementing an activity-based costing system the distributes all of its manufacturing overhead to four activities as shown below: Activity Cost Pool(and activity measure) Manufacturing overhead Activity EX300 TX500 Total Machining(machine-hour) $198,250 90,000 62,500 152,500 Setups(setup hours) 150,000 75 300 375 Product-level(number of products) 100,250 1 1 2 General factory(direct labor dollars) 60,125 120,000 42,500 162,500 Total manufacturing overhead cost 508,625

REQUIRED:

1. Compute the plantwide overhead rate that would be used in the companys conventional cost system. Using the plantwide rate, compute the unit product cost for each product.

2. Compute the activity rate for each activity cost pool. Using the activity rates, compute the unit product cost for each product.

3. Why do the conventional and activity-based cost assignments differ from one another?

Reference no: EM13515241

Questions Cloud

Killing is worse than letting die : Killing is worse than letting die.
Journal entry to record the bonds issuance : The bonds are issued at a price of $2,160,279. Prepare the January 1, 2011, journal entry to record the bonds issuance
Find the highest possible speed of the water : Water comes down the spillway of a dam from an initial vertical height of 170 m. What is the highest possible speed of the water at the end of the spillway
What is the speed of the bullet block combination : A 2.90 g bullet moving at 260 m/s enters and stops in an initially stationary 2.80 kg wooden block on a horizontal frictionless surface. What's the speed of the bullet block combination
Compute the plantwide overhead rate : Compute the plantwide overhead rate that would be used in the companys conventional cost system. Using the plantwide rate, compute the unit product cost for each product.
Difference between generalized and balanced reciprocity : What is the difference between generalized reciprocity and balanced reciprocity please? Does anyone know?
Determine the total fixed cost per month : Express each cost as a rate per month or per unit and determine the total fixed cost per month and the variable cost per unit for Tweety.
Find the speed of the water flow in the pipe on second floor : Water (density = 1 x 10^3 kg/m^3) flows at 15 m/s through a pipe with radius 0.040 m. find the speed of the water flow in the pipe on the second floor
What is the height difference between the two pistons : In the hydraulic system shown in the figure , the piston on the left has a diameter of 4.5 and a mass of 1.8, what is the height difference between the two pistons

Reviews

Write a Review

Accounting Basics Questions & Answers

  How much control does fed have over this longer real rate

Hubbard argues that the Fed can control the Fed funds rate, but the interest rate that is important for the economy is a longer-term real rate of interest.   How much control does the Fed have over this longer real rate?

  Coures:- fundamental accounting principles

Coures:- Fundamental Accounting Principles: - Explain the goals and uses of special journals.

  Accounting problems

Accounting problems,  Draw a detailed timeline incorporating the dividends, calculate    the exact Payback Period  b)   the discounted Payback Period. the IRR,  the NPV, the Profitability Index.

  Write a report on internal controls

Write a report on Internal Controls

  Prepare the bank reconciliation for company

Prepare the bank reconciliation for company.

  Cost-benefit analysis

Create a cost-benefit analysis to evaluate the project

  Theory of interest

Theory of Interest: NPV, IRR, Nominal and Real, Amortization, Sinking Fund, TWRR, DWRR

  Liquidity and profitability

Distinguish between liquidity and profitability.

  What is the expected risk premium on the portfolio

Your Corp, Inc. has a corporate tax rate of 35%. Please calculate their after tax cost of debt expressed as a percentage. Your Corp, Inc. has several outstanding bond issues all of which require semiannual interest payments.

  Simple interest and compound interest

Simple Interest, Compound interest, discount rate, force of interest, AV, PV

  Capm and venture capital

CAPM and Venture Capital

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd