Compute the phase margin with the controller

Assignment Help Basic Statistics
Reference no: EM131127588

An engineering laboratory has presented a plan to operate an Earth-orbiting satellite that is to be controlled from a ground station. A block diagram of the proposed system is shown in Figure CP9.7. It takes T seconds for a signal to reach the spacecraft from the ground station and the identical delay for a return signal. The proposed ground-based controller is a proportional-derivative (PD) controller, where

(a) Assume no transmission time delay (i.e., T = 0), and design the controller to the following specifications: (1) percent overshoot less than 20% to a unit step input and (2) time to peak less than 30 seconds.

(b) Compute the phase margin with the controller in the loop but assuming a zero transmission time delay. Estimate the amount of allowable time delay for a stable system from the phase margin calculation.

(c) Using a second-order Pade approximation to the time delay, determine the maximum allowable delay Tmax for system stability by developing a m-file script that employs the pade function and computes the closed-loop system poles as a function of the time delay T. Compare your answer with the one obtained in part (b).

Reference no: EM131127588

Questions Cloud

How many units would this save in terms of scrap allowance : A production process consists of a three-step operation. The scrap rate is 12 percent for the first step and 10 percent for the other two steps. If the desired daily output is 457 units, how many units must be started to allow for loss due to scrap? ..
Diagram of the yaw acceleration control system : A block diagram of the yaw acceleration control system for a bank-to-turn missile is shown in Figure CP9.6. The input is yaw acceleration command (in g's), and the output is missile yaw acceleration (in g's). The controller is specified t..
Cash received for use of land next month : Cash received for use of land next month
Explain which is a better buy : A two-year $1,000 par zero-coupon bond is currently priced at $819.00. A two-year $1,000 annuity is currently priced at $1,712.52. If you want to invest $50,000 in one of the two securities, which is a better buy?
Compute the phase margin with the controller : An engineering laboratory has presented a plan to operate an Earth-orbiting satellite that is to be controlled from a ground station. A block diagram of the proposed system is shown in Figure CP9.7
What process is responsible for the surface mountains : What process is responsible for the surface mountains, oceanic trenches and other large-scale features on Earth's surface
Indicate with a yes or no whether or not each : 1. Indicate with a Yes or No whether or not each of the following accounts normally requires an adjusting entry.
List network security measures to be implemented : Define the subnets (based on rooms, floor, department, or other criteria). For each subnet, explain which devices/groups/users/rooms will be on this subnet, and define the network address, subnet mask, and available IP addresses to be used by compu..
Calculate for a sewing machine the rate of depreciation : Calculate for A sewing machine the rate of depreciation - the book value after 2 years

Reviews

Write a Review

Basic Statistics Questions & Answers

  What are core competencies

How do they relate to strategic human resource management? Be sure to explain this relationship in terms of the resource-based view of the firm and sustainable competitive advantage.

  What is the process standard deviation

a) What is the process standard deviation? What is b) If, what are the control limits for the mean chart c) What are the control limits for the range chart?

  Hypothesis test for student math scores

The mean math score for fifth grade students at Smart Elementary is 90 with a standard deviation of 8. The fifth grade students are tested each year to determine if the mean score remains the same.

  1 for a population that is normally distributed with a mean

1. for a population that is normally distributed with a mean of 100 and standard deviation of 10 what value would

  Develop a 95 percent confidence interval for the proportion

during a national debate on changes to health care a cable news service performs an opinion poll of 500 small-business

  As the number of degrees of freedom for a t distribution

as the number of degrees of freedom for a t distribution increases the difference between the t distribution and the

  Kind of theoretical distribution

a. Plot a histogram for these data. b. What kind of theoretical distribution might you select to represent the distribution of the number of nesting sites? Why? c. Estimate the parameters of the theoretical distribution by calculating the sample mean..

  Identify the null hypothesis ho and the alternative

identify the null hypothesis ho and the alternative hypothesis h1. a cereal company claims that the mean weight of the

  In the two-way anova the dfm

The variable recorded for each subject was the number of additional yards (possibly negative) that the subject could drive the ball by the end of the season. In the two-way ANOVA the DFM

  Find the p-value and explain its meaning

Can you conclude that the information in the article is untrue? Use the 0.05 significance level. Determine the p-value and explain its meaning.

  Valid for the sampling distribution of the sample mean

Unfortunately, the random variable in question is exponentially distributed; the sample size of 10 is considerably smaller than is required for a normal approximation to be valid for the sampling distribution of the sample mean; and  therefore no ..

  Choose model for overall characteristics like high value

The important thing is having a reason for picking the model that you decide on. You should choose a model for overall characteristics like a high R^2 value. Y

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd