Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Your company is considering the purchase of new earth moving equipment. The total purchase is $240,000 and we pay with $100,000 cash and borrow the rest. (12% per year nominal, compounded monthly for 5 years). The machines last for 7 years and will be worth $35,000 at the end of 7 years. The machines will save approximately $20 per ton of dirt moved. Operating costs for the equipment are $500 per month. At the end of year 3, you will have to do an overhaul and that costs $30,000. Assume that MARR is 1.5% per month and ignore the effect of taxes and depreciation.
a. Compute the monthly payment for the loan. Please be clear and specify the interest rate and the number of periods that you will use in the formulas.
The upstream invert is at an elevation of 8ft and the downstream invert 4 ft. If the depth at the upstream end of the culvert is 8 ft, what is the flow through the culvert. Assume the culvert is in inlet control.
What is your recommendation for the maximum size of coarse aggregate for the following situation? A continuously reinforced concrete pavement cross section contains a layer of No. 6 reinforced bars at 15.24 cm centers,
The average flow rate of the River Tiger into the lake was determined to be 3.5 m3/s and the average flow rate of the River Yankee out of the lake was measured at 2.5 m3/s (ignore any loses due to evapotranspiration).
The meter inlet and throat are connected by the two legs of a mercury manometer. Use the Bernoulli equation to describe how this manometer can be used to measure the flow rate through the meter.
A dam project specifies 97% compaction. Lab tests on the soil being used indicate that it has a maximum dry density of 1900 kg/m 3 at an optimum water content of 13.2%.
A 1.2-in. rainfall occurs in a 6-hour duration. If this represents an exceedence probability of 10%, what is the probability it will be equaled or exceeded at least once in the next 3 years. What is the probability it will be equaled or exceeded e..
Determine the magnitude of P if 10sec is required for the package to travel 5 m up the incline. The static and kinetic coefficients of friction between the package and the incline are both equal to 0.3
For the beam loading, (a) draw the shear and bending-moment diagrams, (b) determine the magnitude and location of the maximum absolute value of the bending moment.
Solid waste production in the United states was 4.3lbs/person-day. Calculate the potential methane production in one year for a land fill that serves a community of 50,000 people.
Given the following information, determine the required DO concentration in the treatment plant effluent discharge in order to ensure that at no point downstream the DO in the river drops below 4 mg/L:
a. Determine the hydraulic radius, hydraulic depth, and section factors for critical and normal flows. b. Determine the alternate depth of flow that will carry the same discharge.
The roof deck of the single story building is subjected to a dead plus live load of 125 Ib/ft sq. If the purlins are spaced 4ft. and bents are spaced 25ft. apart, determine the distributed loading that acts along the purlin DF, and the loadings that ..
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd