A new engineer is evaluating whether to use a higher-voltage transmission line. It will cost $250,000 more initially, but it will reduce transmission losses. The optimistic, most likely, and pessimistic projections for annual savings are $20,000, $15,000, and $8,000, respectively. The interest rate is 6%, and the transmission line should have a life of 30 years. Using the range of estimates, compute the mean annual savings and net present worth (NPW) for the higher-voltage transmission line.

Reference no: EM13564897

Questions Cloud

Estimate the angle through which the part rotates : A machine part rotates at an angular speed of 0.60 rad/s; itsspeed is then increased to 2.2 rad/s at an angular acceletation of0.70 rad/s2
What is the increase in tempterature of the water : The apparatus show in firgure P11.8 was used by Joule tomeasure the mechanical equivalent of heat. what is the increase in tempterature of the water
What is the change in the termperature of the gas : Three moles of a monatomic ideal gas are heated at a constantvolume of 1.5 m3. The amount of heat added is 5.24 x103 J. What is the change in the termperature of the gas
Determine the minimum length of a sag vertical curve : Determine the minimum length of a sag vertical curve if the grades are ?4% and +2%. Design speed is 70 mph. State assumptions used, consider the following criteria:
Compute the mean annual savings and net present worth : A new engineer is evaluating whether to use a higher-voltage transmission line. It will cost $250,000 more initially, but it will reduce transmission losses. The optimistic, most likely, and pessimistic projections for annual savings are $20,000, $15..
Fine aggregate bulk specific gravity : Design a non air entrained concrete mix using a maximum aggregate size of 27mm to be used for an interior beam having a 28-day compressive strength of 35 MPa (specified strength based on cylinder). The material properties are as follows:
Calcule the deflection : Runge Kutta Method. Use mat lab for program with Runge Kutta. The following equation can be used to model the deflection of a sailboat mast subject to wind force. d^2y/dz^2=f/2EL (l-z)^2 where f
What is the average force exerted on the reciever : A .500kg football is thrown toward the eastwith a speed of 15m/s. A stationary reciever catches the ball andbings it to rest in .020s. What is the average force exerted on the reciever
Compute the dividend paid per quarter for each bond : A company issues corporate bonds that have a coupon rate of 4%, pays dividends quarterly, and has a term of 10 years.  Compute the dividend paid per quarter for each bond.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Design a 300 sl m long variable graded terrace for a land

Design a 300 + sl m long variable graded terrace for a land having an average slope of 2 %. Maximum permissible velocity of water in the terrace channel is 60 cm/sec.

  Determine the stations and elevations of the bvc and evc

A +2 percent grade on an arterial highway intersects with a -1 percent grade at station (535 + 24.24) at an elevation of 300 ft. if the design speed of the highway is 65 mi/h,

  Determine the initial discharge velocity from the tank

Where z is the water height above the center of the valve. Determine (a) the initial discharge velocity from the tank and (b) the time required to empty the tank. The tank is considered to be empty when the water level drops to the center of the valv..

  Find the area of the parallelogram with vertices

Find the area of the parallelogram with vertices: P(0,0,0), Q(-2,4,0), R(-2,2,-2), S(-4,6,-2).

  Determine the location of the centroid relative

Design a 2:1 rectangular duct and fan system to pull 40000 scfm of air carrying a medium-density dust through an FCD (Final Control Device) with a ?P of 6.0 in. H2O. Assume the duct system must extend 120-feet and has four 90° elbows.

  Calculate net present value of each option based on discount

Two remediation options are being considered for a contaminated land area formerly used for industrial operations. Option 1 involves removing all of the contaminated soil over a two-year period at a cost of $2.2 million per year

  Determine the coefficient of friction

a mass of 2kilogram is projected with a speed of 3m/s.if a plane inclined 20 degrees with the horizontal.after travelling travelling 0.8meters, the mass comes to rest. determine the coefficient of friction and also the speed as the black returns t..

  Describe which would include a viable by-sell agreement

Each of the three partners realizes that in order for the firm to continue at the present rate of growth a realistic business continuation plan must be in place which would include a viable by-sell agreement between the shareholders.

  How kinematic and diffusion wave model been used

how kinematic and diffusion wave model been used for rainfall runoff modelling. main computer programme involved.

  Which water is sprayed directly into exhaust duct upstream

The engineer in charge of this project investigated severla alternatives to cool the exhaust gas and has concluded that the two most practical solutions would be either the installation of a waste heat boiler or the installation of a spray injecti..

  Write a c program that calculates the factorial of numbers

Write a C program that calculates the factorial of the number from 0 to the integer N, which is not greater than 10

  A photograph is taken of a transverse wave travelling along

a photograph is taken of a transverse wave travelling along a length of rope. at this instant the shape of the wave is

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd