Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Calculate the surface area required for a stabilization pond to serve a domestic population of 1000. Assume 80 gpcd at 210 mg/l of BOD. Use a design loading of 20 lb of BOD/acre/day. If the average liquid depth is 4 ft, calculate the retention time of the wastewater based on influent flow. The effluent is spread on grassland by spray irrigation at a rate of 2.0 in/week (54,300 gal/acre/wk). Compute the land area required for land disposal. In these computations, assume no evaporation or seepage losses from the ponds.
Water enters a very wide rectangular channel (Manning's n = 0.0149) at a velocity of 12.2 ms-1 and a depth of 0.61 m. An H3 curve forms downstream and the water jumps to a depth of 2.4 m some distance downstream.
The crane hoists a uniformly distributed load C. the two identical motors at A an power through gearboxes operating at maximum output speed of 100 rpm.the load is lifted by winding cable onto spindles attached to the output shaft of each gear box.
A soil sample with specific gravity of solids 2.70 has a mass specific gravity of 1.84 Assuming the soil to be perfectly dry,Determine the void ratio.
A trapezoidal canal with a bottom width of 1.5m, a side slope Z=1, has a longitudinal slope of 0.4% and n=0.025. If the water depth in section 1 is 1.52 m and in section
determine the maximum wind load that the cavity wall , bothe wythes are fully grouted but unreinforced ,and type S mortar portland cement is used . prism strength is equal to 2666psi for the concrete block wythe and 5333 psi for the brick wythe.
The u-tube manometer has legs of unequal internal diameter d1 and d2, which are partially filled with immiscible liquids of density1, and density2 respectively and which are open to the atmosphere at the top.
Divide the sodium hydroxidecharge into 10 smaller charges, and add them one at a time, makingsure that each is well mixed and the tank temperature has stoppedincreasing before adding the next charge.
Find the maximum production rate of B in moles per minute and the optimum for (a) a plug flow reactor (b) a mixed flow reactor Find the production rate of B in moles per minute for (c) a mixed flow reactor with V = 100 m3
The maximum wind pressure on the traffic sign is 200 kg/m2. The maximum allowable shear stress is 350 kg/cm2. Design the traffic pole (only vertical element) against torsion knowing that angle of twist at the base should not exceed 6°.
The mayor proposes financing the museum with a lump-sum tax of $24 and then opening the museum free to the public. How many times would each person visit? Calculate the benefit each person would get from the musuem, measured as consumer surplus minus..
Consider a box model for an air shed over a city that is 1 X 105 m on a side, with a height of 1200 m induced by a temperature inversion. Winds with no SO2 blow at 4 m/s agains one side of the box.
a concrete foundation mat in the shape of a regular hexagon ofnbspside 12 ft supports four column loads as shown.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd