Compute the labor and variable overhead price and

Assignment Help Accounting Basics
Reference no: EM13595472

The following data reflect the current month's activity for Sills, Inc.:

  • Actual total direct labor $ 546,000
  • Actual hours worked 26,000
  • Standard labor-hours allowed for actual output (flexible budget) 27,000
  • Direct labor price variance $ 19,500 U
  • Actual variable overhead $ 132,600
  • Standard variable overhead rate per standard direct labor-hour $ 5.25

Variable overhead is applied based on standard direct labor-hours allowed.

Required:
Compute the labor and variable overhead price and efficiency variances. (Do not round intermediate calculations. Input all amounts as positive values. Indicate the effect of each variance by selecting "F" for favorable, "U" for unfavorable, and "None" for no effect (i.e., zero variance). Omit the "$" sign in your response.)

  • Price Variance Efficiency Variance
  • Direct labor $ $
  • Variable overhead $ $

Reference no: EM13595472

Questions Cloud

Buffers are typically made by combining a weak acid with : question buffers are typically made by combining a weak acid with its salt or by combining a weak base with its salt.
The net income reported on the income statement for the : the net income reported on the income statement for the current year was 720000. depreciation recoreded on store
The heat capacity of the bomb is 8151 jk and the heat : a 1.341 g sample of nacl is combusted in a bomb calorimeter. the temperature rises 4.372 degree celsius and 1.53 x103 g
The budgeted selling price per unit is 60 budgeted unit : morganton company makes one product and it provided the following information to help prepare the master budget for its
Compute the labor and variable overhead price and : the following data reflect the current months activity for sills inc. actual total direct labor 546000 actual hours
Prepare a sales activity variance analysis leave no cells : the master budget at windsor inc. last period called for sales of 90000 units at 36 each. the costs were estimated to
Petco makes 2 products dog collars and cat collars each : petco makes 2 products dog collars and cat collars. each passes through the cutting machine which is the binding
When 250 ml of 0500 m h2so4 is added to 250 ml of 100 m koh : when 25.0 ml of 0.500 m h2so4 is added to 25.0 ml of 1.00 m koh is a coffee cup calorimeter at 23.50 degree celsius the
A chemical reaction takes place inside of a simple constant : question a chemical reaction takes place inside of a simple constant pressure calorimeter that contains 100g of water.

Reviews

Write a Review

Accounting Basics Questions & Answers

  How much control does fed have over this longer real rate

Hubbard argues that the Fed can control the Fed funds rate, but the interest rate that is important for the economy is a longer-term real rate of interest.   How much control does the Fed have over this longer real rate?

  Coures:- fundamental accounting principles

Coures:- Fundamental Accounting Principles: - Explain the goals and uses of special journals.

  Accounting problems

Accounting problems,  Draw a detailed timeline incorporating the dividends, calculate    the exact Payback Period  b)   the discounted Payback Period. the IRR,  the NPV, the Profitability Index.

  Write a report on internal controls

Write a report on Internal Controls

  Prepare the bank reconciliation for company

Prepare the bank reconciliation for company.

  Cost-benefit analysis

Create a cost-benefit analysis to evaluate the project

  Theory of interest

Theory of Interest: NPV, IRR, Nominal and Real, Amortization, Sinking Fund, TWRR, DWRR

  Liquidity and profitability

Distinguish between liquidity and profitability.

  What is the expected risk premium on the portfolio

Your Corp, Inc. has a corporate tax rate of 35%. Please calculate their after tax cost of debt expressed as a percentage. Your Corp, Inc. has several outstanding bond issues all of which require semiannual interest payments.

  Simple interest and compound interest

Simple Interest, Compound interest, discount rate, force of interest, AV, PV

  Capm and venture capital

CAPM and Venture Capital

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd