Compute the contribution to profit from the special order

Assignment Help Accounting Basics
Reference no: EM131955970

Problem

Packer Concrete Company pours concrete slabs for single-family dwellings. Wolff Construction Company, which operates outside Packer's normal sales territory, asks Packer to pour 41 slabs for Wolff's new development of homes. Packer has the capacity to build 410 slabs and is presently working on 200 of them. Wolff is willing to pay only $2,670 per slab. Packer estimates the cost of a typical job to include unit-level materials, $930; unit-level labor, $490; and an allocated portion of facility-level overhead, $810.

Required:

a. Calculate the contribution to profit from the special order.

Reference no: EM131955970

Questions Cloud

What is the unit variable cost : Pacific Parts produces a single part for sale. The part sells for $30 per unit. Fixed costs are $890,000 annually. What is the unit variable cost?
Compute an income statement and a balance sheet : Prepare an adjusted trial balance. Prepare an income statement, a statement of owner's equity, and a balance sheet.
Calculate the carrying amount of the investment in suntan : Calculate the carrying amount of the investment in Suntan at December 31, 2015, before the impairment test.
Prepare a report about postive effects of social networking : You need to prepare a report about postive effects of social networking in education analytical study - its making any impact to the socity
Compute the contribution to profit from the special order : Packer Concrete Company pours concrete slabs for single-family dwellings Wolff Construction Company. Compute the contribution to profit from the special order.
Is effect of this legislation on case processing justified : Arrest to Arraignment - What consequences could be expected if grand juries were required to follow adversarial procedures
What will the magnitude and direction of its acceleration : The container is 12.0 m deep with a diameter of 1.8 m. What will the magnitude and direction of its acceleration be if it is released from rest
Coefficient of linear expansion for concrete : Calculate the change in length of a concrete sidewalk (Coefficient of linear expansion for concrete is 12 * 10-6 / oC) that is 100 meters that undergoes.
How many garbage containers does the city of skokie have : The City of Skokie collects garbage for its residents. It charges its residents $1.50 per garbage container collected. The cost to the city for collecting.

Reviews

Write a Review

Accounting Basics Questions & Answers

  How much control does fed have over this longer real rate

Hubbard argues that the Fed can control the Fed funds rate, but the interest rate that is important for the economy is a longer-term real rate of interest.   How much control does the Fed have over this longer real rate?

  Coures:- fundamental accounting principles

Coures:- Fundamental Accounting Principles: - Explain the goals and uses of special journals.

  Accounting problems

Accounting problems,  Draw a detailed timeline incorporating the dividends, calculate    the exact Payback Period  b)   the discounted Payback Period. the IRR,  the NPV, the Profitability Index.

  Write a report on internal controls

Write a report on Internal Controls

  Prepare the bank reconciliation for company

Prepare the bank reconciliation for company.

  Cost-benefit analysis

Create a cost-benefit analysis to evaluate the project

  Theory of interest

Theory of Interest: NPV, IRR, Nominal and Real, Amortization, Sinking Fund, TWRR, DWRR

  Liquidity and profitability

Distinguish between liquidity and profitability.

  What is the expected risk premium on the portfolio

Your Corp, Inc. has a corporate tax rate of 35%. Please calculate their after tax cost of debt expressed as a percentage. Your Corp, Inc. has several outstanding bond issues all of which require semiannual interest payments.

  Simple interest and compound interest

Simple Interest, Compound interest, discount rate, force of interest, AV, PV

  Capm and venture capital

CAPM and Venture Capital

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd