Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
The results of a constant head permeability test for a fine sand sample having a diameter of 25cm and a length of 50 cm are as follows:
Constant head difference: 0.7 m
Time of collection of water: 6 minutes
Volume of water collected: 0.0914 US gallon
Temperature of water: -25 degree Celsius
Compute the coefficient of permeability (k) in mm/sec applying Darcy's Law.
The true azimuth of line AB is 193 degrees 20'. The angle measured counterclockwise between line AB and another line AC is 205 degrees 10'. The true azimuth of line AC is:
For a trapezoidal shaped channel (n=0.014 and slope = 0.0002 with a 20-ft bottom width and side slopes of 1:1.5 (V:H), determine the normal depth using trial and error technique for a discharge of 1000 cfs.
The path of motion of a 7-lb particle in the horizontal plane is described in terms of polar coordinates as r= (3t+2) and theta=(0.2t^2-t) , where t is in seconds. Determine the magnitude of the unbalanced force acting on the particle when t=3s.
write a computer program that generates a sequence of binomial random variables with parameters n=20 and p=0.3. a) use the inverse c.d.f approach
Three reservoirs are connected by three pipes with hA = 100 f t, hB = 20 f t, hC = 0 f t, L1 = 1000 f t, L2 = 500 f t, L3 = 400 f t and D1 = D2 = D3 = 1 f t. Determine flow rate into or out of each reservoir if friction in each pipe is 0.02.
An emission control system for a new car costs $800 and reduces NO_x emissions from 0.4 g/mile to 0.23 g/mile. Assume the car is driven 10000 miles per year, and the life of the emissions control system is 11 years with zero scrap value.
In order to comply with regulations, an iron/steel sinter plant installs an electrostatic precipitator (ESP) to collect 98% of the 10 ?m particles from an air stream flowing at 2 m3/s
At a point in a material, a resultant stress of 151 MN/m^2 acts in a direction making angles of 52 deg, 79 deg, and 40.13 deg with the coordinate axes, x,y and z respectively
Constructing the foundation causes changes in the levels of vertical stress at all points in the soil. One such point lies at the centre of the footing plan and is at a depth of 10m. Determine the increment of vertical stress there.
An Engineer is designing a hydraulic lift with a capacity of 10 tons. The moving parts of this lift weigh 1000 lbf. The lift should raise the load to a height of 6 ft in 20 sec.
A jet on an aircraft carrier is launched by a catapult. What are some of the parameters that would be taken into account to make sure the aircraft achives a specified speed at the end of the ship
Determine the operating speeds of the machine at which the machine's steady-state amplitude is less than 0.2 mm. Take keq = 3 EI/L3.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd